The paper presents a brief overview of the design considerations for the Dover and Folkestone Wastewater Treatment Scheme, which is being implemented by Southern Water to meet the requirements of the EU Bathing Water and Urban Wastewater Treatment Directives.The design considerations for the pumping station PS2 and the delivery pipeline to the treatment works at Broomfield Bank are discussed, together with the pressure surge investigation.
This content is only available as a PDF.
© IWA Publishing 2001
You do not currently have access to this content.