Water pipelines deliver water of daily-life demand to customers. However, pipelines tend to be damaged after years of use. Thus, many waterworks are now faced with the major task of water pipeline rehabilitation. However, budgets for pipeline replacement are limited. The present study aims to propose a long-term plan for water pipeline rehabilitation under limited rehabilitation budgets that utilizes a damage occurrence model. Especially, this study attempts long-term rehabilitation planning by efficiently allocating a budget for pipeline rehabilitation. First, a simulation model is used to obtain the failure rate curve which uses reliability theory and data analysis for pipeline leakage accidents, and Monte Carlo simulation is applied to the simulation model. Secondly, in order to set the best planning, several cases with changed annual replacement rate are applied to this study. Finally, the simulation model is applied to key pipelines. The key pipelines are vital pipelines located in central districts. Thus, the replacement of key pipelines is considered to be the priority. From these steps, this study is expected to provide desirable alternative plans for water pipelines when the budget for replacement is limited.
Skip Nav Destination
Article navigation
March 2014
This article was originally published in
Journal of Water Supply: Research and Technology-Aqua
Article Contents
Research Article|
November 06 2013
A long-term plan for water pipeline rehabilitation considering preventive maintenance
Mincheol Kim;
Mincheol Kim
1Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minamiosawa, Hachioji, Tokyo 192-0397, Japan
Search for other works by this author on:
Toyono Inakazu;
Toyono Inakazu
1Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minamiosawa, Hachioji, Tokyo 192-0397, Japan
Search for other works by this author on:
Akira Koizumi;
Akira Koizumi
1Department of Civil and Environmental Engineering, Tokyo Metropolitan University, 1-1 Minamiosawa, Hachioji, Tokyo 192-0397, Japan
Search for other works by this author on:
Jayong Koo
2Department of Environmental Engineering, University of Seoul, Seoulsiripdaero 163, Dongdaemun-gu, Seoul 130-743, Korea
E-mail: [email protected]
Search for other works by this author on:
Journal of Water Supply: Research and Technology-Aqua (2014) 63 (2): 131–138.
Citation
Mincheol Kim, Toyono Inakazu, Akira Koizumi, Jayong Koo; A long-term plan for water pipeline rehabilitation considering preventive maintenance. Journal of Water Supply: Research and Technology-Aqua 1 March 2014; 63 (2): 131–138. doi: https://doi.org/10.2166/aqua.2013.008
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00