Typhoon events occur frequently in Taiwan resulting in flood-related disasters. A well-operated reservoir can reduce the severity of a disaster. This study incorporates a genetic algorithm, a river hydraulic model, an artificial neural network and a simulation model of Tseng-Wen Reservoir to propose a real-time flooding operation model. The model includes two parts: an optimal flooding operation model (OFOM) and a reservoir inflow forecasting. Given an inflow condition, the OFOM is run based on the safety of the dam structure, reservoir flooding operation rule, and minimization of the downstream loss due to flood. A simple and robust model for reservoir inflow forecasting, which automatically chooses the most similar event from a typhoon event database as the future inflow, is developed. This study compares the model results with the real operations during Typhoons Sepat, Krosa, Kalmaegi, Fung-wong, Sinlaku, and Jangmi. This study compares the performances of the proposed model with the practical operation operated by the management center of Tseng-Wen Reservoir. The proposed model indicates shorter flooding duration in the downstream area. For example, the flood durations of the model output are 4 and 3 hours shorter during Typhoon Krosa and Sinlaku, respectively, than the practical operations.
Skip Nav Destination
Article navigation
Research Article|
December 07 2013
The development of a real-time flooding operation model in the Tseng-Wen Reservoir
Yu-Wen Chen;
Yu-Wen Chen
1Department of Civil Engineering, National Chiao Tung University, Hsinchu City 300, Taiwan (ROC)
Search for other works by this author on:
Jui-Pin Tsai;
Jui-Pin Tsai
1Department of Civil Engineering, National Chiao Tung University, Hsinchu City 300, Taiwan (ROC)
Search for other works by this author on:
Liang-Cheng Chang;
1Department of Civil Engineering, National Chiao Tung University, Hsinchu City 300, Taiwan (ROC)
3EB311, 1001 University Rd, Hsinchu City, Taiwan 300, ROC
E-mail: [email protected]
Search for other works by this author on:
Chih-Chao Ho;
Chih-Chao Ho
2Construction and Disaster Prevention Research Center, Feng Chia University, Taichung City 40724, Taiwan
Search for other works by this author on:
You-Cheng Chen
You-Cheng Chen
1Department of Civil Engineering, National Chiao Tung University, Hsinchu City 300, Taiwan (ROC)
Search for other works by this author on:
Hydrology Research (2014) 45 (3): 490–503.
Article history
Received:
November 28 2012
Accepted:
October 22 2013
Citation
Yu-Wen Chen, Jui-Pin Tsai, Liang-Cheng Chang, Chih-Chao Ho, You-Cheng Chen; The development of a real-time flooding operation model in the Tseng-Wen Reservoir. Hydrology Research 1 June 2014; 45 (3): 490–503. doi: https://doi.org/10.2166/nh.2013.301
Download citation file: