Abstract
Improving flood forecasting performance is critical for flood management. Real-time flood forecasting correction techniques (e.g., proportional correction (PC) and Kalman filter (KF)) coupled with the Muskingum method improve the forecasting performance but have limitations (e.g., short lead times and inadequate performance, respectively). Here, particle filter (PF) and combination forecasting (CF) are coupled with the Muskingum method and then applied to 10 flood events along the Shaxi River, China. Two indexes (overall consistency and permissible range) are selected to compare the performances of PC, KF, PF and CF for 3 h lead time. The changes in overall consistency for different lead times (1–6 h) are used to evaluate the applicability of PC, KF, PF and CF. The main conclusions are as follows: (1) for 3 h lead time, the two indexes indicate that the PF performance is optimal, followed in order by KF and PC; CF performance is close to PF and better than KF. (2) The performance of PC decreases faster than that of KF and PF with increases in the lead time. PC and PF are applicable for short (1–2 h) and long lead times (3–6 h), respectively. CF is applicable for 1–6 h lead times; however, it has no advantage over PC and PF for short and long lead times, respectively, which may be due to insufficient training and increase in cumulative errors.
INTRODUCTION
Flood forecasting is a non-engineering measure for flood control development that resulted from the attempt to address the occurrence of flood disasters (Ryder 2009). Traditional forecasting (TF), based on a physically hydrological model using historical data, reflects only the general regularities of the forecasting area (Kan et al. 2017). TF errors may be generated and accumulated gradually for a variety of reasons, mainly including model structure errors, model parameter errors and the errors caused by water projects. These errors often increase over time and may eventually exceed the permissible range of precision specified by the standard or used in practice (Liu et al. 2015). With the development of automatic hydrological monitoring and information transmission technology, real-time flood forecasting is commonly achieved by proportional correction (PC) and Kalman filter (KF) to correct TF using real-time hydrological data (Calvo & Savi 2009; Liu et al. 2016). These two correction techniques have numerous advantages that improve the forecasting performance to some extent; for example, the PC approach boasts a low computational cost, and KF has an unbiased minimum variance (Ocio et al. 2017). However, some limitations, such as the short lead time of PC and the inadequate correction performance of KF, have been observed in practical applications, and the direct correction of TF values using PC may cause unexpected and unstable deviations (Perumal & Sahoo 2007).
Particle filter (PF), which has undergone considerable development in recent years, can be applied to any nonlinear and non-Gaussian system represented by a state-space model (Weerts & El Serafy 2006). Compared with the above correction techniques, PF updates only forecasting value weights and then maintains the actual forecasting values, which avoids the situations in which forecasting values exceed the physical range during the updating process (Peter & Luc 2009). Therefore, the researches on PF are valuable in hydrology. Since Moradkhani et al. (2005) applied PF to the evaluation of parameters and states in hydrological models, scholars have performed several studies on the same topic. Dechant & Moradkhani (2012) and Bi et al. (2015) used PF to estimate the discharge in two runoff models simultaneously (HyMod Model and the Sacramento Soil Moisture Accounting Model) and the soil moisture in a distributed variable infiltration capacity hydrological model, respectively. In the field of flood forecasting, Noh et al. (2014) and Xu et al. (2017) studied the combination of PF combined with distributed hydrological models to forecast short-term runoff and that of PF with a channel hydraulics model to construct a real-time probabilistic channel flood forecasting model, respectively.
Combination forecasting (CF) integrates the results of different models to obtain more stable and reliable results (Cloke & Pappenberger 2009). Many studies have reported that a single model can produce large forecasting uncertainty; accordingly, a multi-model approach has been shown to produce better results (Zsoter et al. 2016). Thus, CF has been increasingly utilized by forecasters; examples of this technique generally include the simple averaging method and the weighted averaging method (Ajami et al. 2006). In addition, Wu et al. (2015) applied a real-time correction CF to a case study of the Xiangjiaba station on the Jinsha River.
For updating schemes in the Muskingum model, Mazzoleni et al. (2018) compared different updating approaches (direct insertion, nudging, KF, Ensemble KF and Augmented Ensemble KF) in the Muskingum model using different assumptions on structure and error definition of the model. The result is that in case of lumped modelling, direct insertion performs best while nudging performs worst; KF is sensitive to model error estimation; and Ensemble KF and Augmented Ensemble KF are sensitive to ensemble spread definition and computationally expensive. However, PF and CF applied for updating the Muskingan method has not been reported yet.
It has been more than 30 years since the flood forecasting was carried out from the Yongan hydrological station to the Shaxian hydrological station along the Shaxi River; and abundant experience has been accumulated for reference. In the study area, direct insertion performs worse than PC and KF; however, there are problems to be solved for them. To improve the short lead time and the unstable discharge hydrograph of PC, as well as the inadequate correction performance of KF for practical forecasting, 10 typical flood events with the total time intervals of 1,155 h extending from the two stations are selected, and two real-time flood forecasting correction techniques (PF and CF) are introduced in this study.
First, the flood characteristics and error distribution of TF are analysed. Then, real-time flood forecasting models are constructed based on the three real-time flood forecasting correction techniques (PC, KF and PF) that are individually coupled with the Muskingum method, and CF is developed via a combination of these three correction techniques. The 6 h average flood travel time is used as the lead time for TF in practice. However, a loss in the lead time may occur during the real-time correction (Bao et al. 2014). Therefore, 3 h is set as the lead time for practical real-time forecasting. According to the basin characteristics, the correction performances of PC, KF, PF and CF for 3 h lead time are compared via two indexes: overall consistency and permissible range to discuss the advantages and disadvantages of these techniques in detail. In addition, the influence of different lead times (1–6 h) on the correction performances of these correction techniques is obtained by the change in overall consistency with the lead time. Finally, the applicability of each of these correction techniques individually coupled with the Muskingum method is discussed.
MATERIALS AND METHODS
Study area and flood characteristics
The studied river reach extends from the upstream boundary at the Yongan hydrological station to the downstream boundary at the Shaxian hydrological station, which is located in the middle and lower reaches of the Shaxi River, China (Figure 1). The average annual temperature and precipitation of the basin are 19.9 °C and 1,706.5 mm, respectively, and surface water is derived mainly from precipitation. The study area is 2,619 km2, and the channel length is 78 km between the two stations. The section widths of the two stations are 186 and 242 m, respectively. The average flood travel time is 6 h, and there are five run-of-river hydropower stations with incomplete daily regulations. Ten typical flood events between the two stations, with observed time intervals of 1–5 h from 2002 to 2010, are analysed in this study. The first flood event occurred in 2002, the second and third flood events occurred in 2005, the fourth through sixth flood events occurred in 2006 and the remaining flood events occurred in 2010.
Based on the analysis of a total of 15 peaks from the 10 studied flood events between the two stations, 6 single-peak flood events, 3 double-peak flood events and 1 significant double-peak flood event with a hidden single-peak are observed. In addition, the relative size of a peak in the same double-peak flood event differs between the two stations. The peak times for five peaks observed at the Yongan hydrological station and almost all of the rise times occur later than the peak times and rise times observed at the Shaxian hydrological station. After the rainfall forecasting is implemented, the hydropower stations are pre-discharged before the flood to increase their storage capacity, which results in an early flood rise time observed at the Shaxian hydrological station. Additionally, the peak generated by the pre-discharge process occurs earlier than that of a natural flood, causing the peak time at the Shaxian hydrological station to occur earlier than that at the Yongan hydrological station. However, long-duration flood events cannot be completely controlled because of the incomplete daily regulation capacities at the five run-of-river hydropower stations. Consequently, the flood events observed at the Shaxian hydrological station still largely retain natural flood characteristics.
where u represents the location parameter; σ represents the scale parameter and v represents the degree of freedom. The maximum likelihood estimation results of the three parameters are u= − 130, σ= 287 and v = 4, which are accepted at the 0.05 significance level. Therefore, the error distribution is considered to fit the t location-scale distribution. Figure 2 shows the error frequency histograms and the corresponding Gaussian and t location-scale fits.
Muskingum method and real-time correction techniques
Performance indexes
Experimental setup
The observed data of 1–5 h time intervals are interpolated into a 1 h interval; and the time interval between the two next corrections is also 1 h. The flood forecasting begins with a 24 h warm-up period; that is, the forecasting begins to forecast without real-time correction for 24 h before the flood rise start time. The purpose of this step is to ensure that the precipitation affecting the flood process can be considered, thereby making the channel discharge obtained by the Muskingum method more reliable.
Based on the forecasting scheme of the Hydrologic and Water Resources Survey Bureau, Sanming Branch, the initial parameters of the Muskingum method for TF are set as constants for the total reach (K= 6), the weighted factor of the total reach (x= 0.4), the routing time (Δt = 1 h) and the number of unit reaches (n= 6). Then, the unit reach parameters are Kl = Δt = 1 h and xl = −0.1, which are determined according to the observations during the calibration period (before 2002). Ten typical flood events with a total time interval of 1,155 h are used for TF in this study. The same observations are then used to measure the performance of the correction methods.
PC does not have initial parameters to set. The initial parameters of KF include the discharge Q and matrixes P, O and R. In general, Q is set as the observed value, while the elements of P are set as large values, and O and R are determined according to the observations during the calibration period (before 2002). The initial parameters of PF include the number of particles and the resampling threshold. Theoretically, the greater the number of particles is, the better the correction performance; however, the calculation time increases considerably with greater numbers of particles (Snyder et al. 2008). Moreover, high resampling frequencies not only increase the computational costs but also reduce the particle diversity (Zuo 2013). Accordingly, one flood event is selected here to analyse the computing time of PF. The number of particles is set to 100, 1,000 and 10,000, and the required computation times are 0.9, 2.8 and 19.2 s, respectively. However, the change in the NSE is negligible, and the largest number of effective particles is greater than two-thirds of the total. Therefore, the number of particles is set to 1,000, and the resampling threshold is two-third of the number of particles.
RESULTS AND DISCUSSION
Correction performance for 3 h lead time
For 3 h lead time, TF results are corrected by the real-time correction techniques of PC, KF and PF. The performances of these techniques, in terms of the overall consistency and permissible range indexes, are shown in Table 1.
No. . | Overall consistency . | Permissible range . | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
NSE (precision grade) . | Peak discharge error (%) . | Peak time error (h) . | Process pass rate (%) . | |||||||||||||
TF . | PC . | KF . | PF . | TF . | PC . | KF . | PF . | TF . | PC . | KF . | PF . | TF . | PC . | KF . | PF . | |
1 | 0.88 (B) | 0.97 (A) | 0.95 (A) | 0.96 (A) | −5.4 | 0.1 | −3.5 | −2.5 | 0 | −2 | −1 | 3 | 73 | 85 | 81 | 84 |
2 | 0.82 (B) | 0.77 (B) | 0.89 (B) | 0.88 (B) | −8.9 | 54.0 | −1.3 | −6.9 | 2 | −5 | 0 | 2 | 53 | 69 | 74 | 56 |
11.8 | 7.4 | 9.2 | 9.6 | 2 | −1 | 0 | 1 | |||||||||
3 | 0.73 (B) | 0.77 (B) | 0.85 (B) | 0.89 (B) | −4.5 | 12.6 | 2.6 | 7.7 | 3 | −3 | −2 | −2 | 44 | 60 | 60 | 70 |
−4.4 | 6.1 | −0.9 | 4.9 | 5 | 3 | 4 | 3 | |||||||||
4 | 0.68 (C) | 0.77 (B) | 0.72 (B) | 0.79 (B) | −26.4 | 0.2 | −4.7 | −13.6 | 1 | 3 | −2 | 3 | 57 | 54 | 57 | 54 |
5 | 0.97 (A) | 0.97 (A) | 0.98 (A) | 0.98 (A) | 1.5 | 4.5 | 3.1 | 3.6 | 4 | 3 | 3 | 3 | 82 | 81 | 86 | 82 |
6 | 0.83 (B) | 0.95 (A) | 0.92 (A) | 0.93 (A) | −0.8 | 5.7 | 0.2 | 0.2 | −1 | −4 | −3 | −3 | 32 | 65 | 49 | 64 |
7 | 0.66 (C) | 0.77 (B) | 0.76 (B) | 0.82 (B) | 3.2 | 22.5 | 5.4 | 3.3 | 6 | 2 | 2 | 2 | 44 | 70 | 64 | 55 |
8 | 0.40 (D) | 0.47 (D) | 0.65 (C) | 0.70 (B) | 15.9 | 52.7 | 18.3 | 26.4 | 5 | 2 | 3 | 2 | 12 | 49 | 21 | 49 |
9 | 0.85 (B) | 0.90 (A) | 0.92 (A) | 0.95 (A) | −11.3 | 2.6 | −4.6 | −0.6 | 2 | 2 | 2 | 1 | 45 | 63 | 65 | 73 |
−10.6 | 13.9 | −2.5 | −0.5 | 7 | 5 | 5 | 5 | |||||||||
10 | 0.55 (C) | 0.62 (C) | 0.77 (B) | 0.87 (B) | −0.6 | 40.6 | 26.6 | 9.4 | 8 | −1 | −1 | 0 | 65 | 69 | 76 | 84 |
18.3 | 24.6 | −7.6 | −9.1 | 7 | 3 | 3 | 2 | |||||||||
2.6 | 13.8 | 6.5 | 6.2 | 0 | −1 | −1 | 0 |
No. . | Overall consistency . | Permissible range . | ||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
NSE (precision grade) . | Peak discharge error (%) . | Peak time error (h) . | Process pass rate (%) . | |||||||||||||
TF . | PC . | KF . | PF . | TF . | PC . | KF . | PF . | TF . | PC . | KF . | PF . | TF . | PC . | KF . | PF . | |
1 | 0.88 (B) | 0.97 (A) | 0.95 (A) | 0.96 (A) | −5.4 | 0.1 | −3.5 | −2.5 | 0 | −2 | −1 | 3 | 73 | 85 | 81 | 84 |
2 | 0.82 (B) | 0.77 (B) | 0.89 (B) | 0.88 (B) | −8.9 | 54.0 | −1.3 | −6.9 | 2 | −5 | 0 | 2 | 53 | 69 | 74 | 56 |
11.8 | 7.4 | 9.2 | 9.6 | 2 | −1 | 0 | 1 | |||||||||
3 | 0.73 (B) | 0.77 (B) | 0.85 (B) | 0.89 (B) | −4.5 | 12.6 | 2.6 | 7.7 | 3 | −3 | −2 | −2 | 44 | 60 | 60 | 70 |
−4.4 | 6.1 | −0.9 | 4.9 | 5 | 3 | 4 | 3 | |||||||||
4 | 0.68 (C) | 0.77 (B) | 0.72 (B) | 0.79 (B) | −26.4 | 0.2 | −4.7 | −13.6 | 1 | 3 | −2 | 3 | 57 | 54 | 57 | 54 |
5 | 0.97 (A) | 0.97 (A) | 0.98 (A) | 0.98 (A) | 1.5 | 4.5 | 3.1 | 3.6 | 4 | 3 | 3 | 3 | 82 | 81 | 86 | 82 |
6 | 0.83 (B) | 0.95 (A) | 0.92 (A) | 0.93 (A) | −0.8 | 5.7 | 0.2 | 0.2 | −1 | −4 | −3 | −3 | 32 | 65 | 49 | 64 |
7 | 0.66 (C) | 0.77 (B) | 0.76 (B) | 0.82 (B) | 3.2 | 22.5 | 5.4 | 3.3 | 6 | 2 | 2 | 2 | 44 | 70 | 64 | 55 |
8 | 0.40 (D) | 0.47 (D) | 0.65 (C) | 0.70 (B) | 15.9 | 52.7 | 18.3 | 26.4 | 5 | 2 | 3 | 2 | 12 | 49 | 21 | 49 |
9 | 0.85 (B) | 0.90 (A) | 0.92 (A) | 0.95 (A) | −11.3 | 2.6 | −4.6 | −0.6 | 2 | 2 | 2 | 1 | 45 | 63 | 65 | 73 |
−10.6 | 13.9 | −2.5 | −0.5 | 7 | 5 | 5 | 5 | |||||||||
10 | 0.55 (C) | 0.62 (C) | 0.77 (B) | 0.87 (B) | −0.6 | 40.6 | 26.6 | 9.4 | 8 | −1 | −1 | 0 | 65 | 69 | 76 | 84 |
18.3 | 24.6 | −7.6 | −9.1 | 7 | 3 | 3 | 2 | |||||||||
2.6 | 13.8 | 6.5 | 6.2 | 0 | −1 | −1 | 0 |
For the NSE index of the overall consistency, the NSE of PC is larger than that of TF (except for the second flood event), and the number of flood events with the highest NSE is 2. KF improves the NSE for all flood events to varying degrees, and the number of flood events with the highest NSE is 2 (1 parallel). The NSE of PF is also improved for all flood events, and the number of flood events with the highest NSE is 7 (1 parallel). For the precision grade of the overall consistency, the precision grade of 1 flood event is A and those of 5 flood events are grade B using TF; the precision grades of 4 flood events are A using PC, KF and PF; and the precision grades of 4, 5 and 6 flood events are B using PC, KF and PF, respectively. Compared with TF, these three correction techniques improve the performance significantly, and the use of PF improves the precision grades of all flood events to at least a grade of B. In summary, for the overall consistency index, the performance of PF obviously exceeds those of the other two correction techniques, followed by KF, while PC performs the worst.
For the peak discharge index of the permissible range, the qualified numbers of flood events using TF, PC, KF and PF are 12, 10, 13 and 14, respectively; the numbers of peaks with the absolute error percentages below 5% are 7, 4, 9 and 7, respectively; the numbers of peaks with percentages between 5 and 10% are 2, 3, 4 and 6, respectively. Therefore, the performances of KF and PF are similar in terms of the peak discharge index; KF performs slightly better, whereas PC performs even worse than TF. For the peak time index of the permissible range, the qualified numbers of flood events using TF, PC, KF and PF are 8, 12, 13 and 14, respectively, and the numbers of flood events with the minimum absolute error values are 4 (2 parallel), 5 (3 parallel), 6 (3 parallel) and 9 (6 parallel), respectively. Therefore, in terms of the peak time index, the performance of PF is optimal; none of the remaining correction techniques shows obvious advantages, but they perform better than TF. For the process discharge index of the permissible range, the numbers of flood events with qualified rates in the 75–90% range are 1, 2, 3 and 3 for TF, PC, KF and PF, respectively, and the numbers of flood events with qualified rates in the 60–75% range are 2, 6, 4 and 3, respectively, while the numbers of flood events with the highest qualified rates are 1 (1 parallel), 4 (1 parallel), 3 (1 parallel) and 4 (1 parallel), respectively. Therefore, for the process discharge index, the performances of PC and PF are better than that of KF. In conclusion, for the permissible range index, the order of performance is the same as that for the overall consistency.
The discharge processes and performances of TF, PC, KF and PF for the 10 flood events are shown in Figure 3. Table 1 and Figure 3 show that the discharge hydrographs of TF and KF are more stable than those of PC and PF, which exhibit sudden discharge fluctuations. The best performance is observed for the first and fifth flood events, which is consistent with the typical discharge process. The error in the first peak of the second flood event using PC is excessively large. The observed values at time intervals 60–70 suddenly plateau after an abrupt increase; as a result, PC forecasting values are only one-half of the observed values, with an error of 54% after proportional upscaling. The performances for the third and tenth flood events using PC are similar to those of the second flood event. The duration of the fourth flood event is relatively short, and the local inflow peak occurs much earlier than the observed peak. Therefore, the forecasting values from the three correction techniques all oscillate near the peak, which creates a large forecasting error in the peak time. The eighth flood event resembles the fourth flood event to an extent. The difference between them is that the local inflow peak in the eighth flood event occurs later than the observed peak, and the fluctuation is also inconsistent, leading to the worst performances for all indexes among the tenth flood events both before and after correction. Due to the small local inflow during the sixth flood event, the forecasting values obtained using TF are all smaller than the observed values during the rising flood stage; additionally, as a consequence of the lag effect during the lead time, none of the three correction techniques match the fluctuation trend of observed values. The local inflow peak time of the seventh flood event does not correspond to the observed peak time; hence, the three correction techniques oscillate significantly near the observed values during the rising stage. In addition, the performance of the ninth flood event is similar to that of the seventh flood event.
Based on the flood events 1–8 used for training, the weights of PC, KF and PF are 0.1467, 0.0811 and 0.7655, respectively, which are verified with the evaluation results of the two indexes in the above section. The CF performance for the ninth to tenth flood events is shown in Table 2.
No. . | Overall consistency . | Permissible range . | ||||||
---|---|---|---|---|---|---|---|---|
NSE (precision grade) . | Peak discharge error (%) . | Peak time error (h) . | Process pass rate (%) . | |||||
CF . | Order . | CF . | Order . | CF . | Order . | CF . | Order . | |
9 | 0.95 (A) | 1* (1*) | −1.2 | 2 (1) | 1 | 1* (1*) | 74 | 1 (2) |
0.8 | 2 (1) | 5 | 1* (1*) | |||||
10 | 0.87 (B) | 1* (1*) | 12.7 | 3 (2) | 0 | 1* (1*) | 84 | 1* (1*) |
−5.7 | 1 (3) | 2 | 1* (1*) | |||||
6.4 | 3 (2) | −1 | 3* (1*) |
No. . | Overall consistency . | Permissible range . | ||||||
---|---|---|---|---|---|---|---|---|
NSE (precision grade) . | Peak discharge error (%) . | Peak time error (h) . | Process pass rate (%) . | |||||
CF . | Order . | CF . | Order . | CF . | Order . | CF . | Order . | |
9 | 0.95 (A) | 1* (1*) | −1.2 | 2 (1) | 1 | 1* (1*) | 74 | 1 (2) |
0.8 | 2 (1) | 5 | 1* (1*) | |||||
10 | 0.87 (B) | 1* (1*) | 12.7 | 3 (2) | 0 | 1* (1*) | 84 | 1* (1*) |
−5.7 | 1 (3) | 2 | 1* (1*) | |||||
6.4 | 3 (2) | −1 | 3* (1*) |
Note: *Parallel; the number in parentheses: the order of PF.
Compared with PF, which boasts the best correction performance, the performance of the weighted average CF is not comprehensively better, and the differences among most indexes are not large. For the NSE index of the overall consistency, all 2 flood events are the top 1 (parallel). For the peak discharge index of the permissible range, the poor performance is influenced mainly by large peak discharge errors of PC. For the peak time index of the permissible range, the orders of 4 peaks are the top 1 (parallel), and the order of the remaining peak is the last (parallel); however, the absolute error is only 1 h. Both flood events account for more than 70% of the process discharge index of the permissible range. In total, although there is no direct comparison between CF and KF in Table 2, the performance of CF is clearly better than KF.
Correction performance for different lead times
For different lead times (1–6 h), the overall consistency index values of the three correction techniques and CF are shown in Table 3. However, comparing these three techniques individually is difficult because there are 10 flood events and 6 lead times. Therefore, the following three indexes are generalized: the slope of the average decrease in NSE, the number of the largest NSE values and the number of grade A precision categorizations in each lead time.
LT (h) . | WT . | CT . | 1 . | 2 . | 3 . | 4 . | 5 . | 6 . | 7 . | 8 . | 9 . | 10 . |
---|---|---|---|---|---|---|---|---|---|---|---|---|
/ . | / . | TF . | 0.88 (B) . | 0.82 (B) . | 0.73 (B) . | 0.68 (C) . | 0.97 (A) . | 0.83 (B) . | 0.66 (C) . | 0.40 (D) . | 0.85 (B) . | 0.55 (B) . |
1 | 0.7561 | PC | 0.99 (A) | 0.97 (A) | 0.97 (A) | 0.95 (A) | 0.99 (A) | 0.99 (A) | 0.97 (A) | 0.94 (A) | 0.99 (A) | 0.96 (A) |
0.0245 | KF | 0.94 (A) | 0.90 (A) | 0.85 (B) | 0.84 (B) | 0.98 (A) | 0.91 (A) | 0.82 (B) | 0.67 (C) | 0.93 (A) | 0.78 (B) | |
0.2093 | PF | 0.99 (A) | 0.94 (A) | 0.98 (A) | 0.96 (A) | 0.99 (A) | 0.98 (A) | 0.89 (B) | 0.81 (B) | 0.95 (A) | 0.90 (A) | |
/ | CF | / | / | / | / | / | / | / | / | 0.99 (A) | 0.97 (A) | |
2 | 0.5535 | PC | 0.98 (A) | 0.90 (A) | 0.89 (B) | 0.85 (B) | 0.98 (A) | 0.96 (A) | 0.91 (A) | 0.77 (B) | 0.95 (A) | 0.84 (B) |
0.0526 | KF | 0.93 (A) | 0.90 (A) | 0.84 (B) | 0.81 (B) | 0.99 (A) | 0.90 (A) | 0.80 (B) | 0.64 (C) | 0.92 (A) | 0.76 (B) | |
0.3844 | PF | 0.96 (A) | 0.90 (A) | 0.92 (A) | 0.86 (B) | 0.99 (A) | 0.93 (A) | 0.89 (B) | 0.70 (B) | 0.96 (A) | 0.84 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.97 (A) | 0.90 (A) | |
3 | 0.1467 | PC | 0.97 (A) | 0.77 (B) | 0.77 (B) | 0.77 (B) | 0.97 (A) | 0.95 (A) | 0.77 (B) | 0.47 (D) | 0.90 (A) | 0.62 (C) |
0.0811 | KF | 0.95 (A) | 0.91 (A) | 0.85 (B) | 0.72 (B) | 0.98 (A) | 0.92 (A) | 0.76 (B) | 0.65 (C) | 0.92 (A) | 0.77 (B) | |
0.7655 | PF | 0.96 (A) | 0.88 (B) | 0.89 (B) | 0.79 (B) | 0.98 (A) | 0.93 (A) | 0.82 (B) | 0.70 (B) | 0.95 (A) | 0.87 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.95 (A) | 0.87 (B) | |
4 | 0.0232 | PC | 0.94 (A) | 0.58 (B) | 0.62 (B) | 0.70 (B) | 0.96 (A) | 0.93 (A) | 0.65 (B) | 0.13 (D) | 0.84 (A) | 0.35 (C) |
0.1267 | KF | 0.93 (A) | 0.87 (B) | 0.80 (B) | 0.70 (B) | 0.97 (A) | 0.89 (B) | 0.67 (C) | 0.42 (D) | 0.91 (A) | 0.68 (B) | |
0.8452 | PF | 0.95 (A) | 0.90 (A) | 0.82 (B) | 0.73 (B) | 0.97 (A) | 0.94 (A) | 0.74 (B) | 0.53 (C) | 0.93 (A) | 0.82 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.93 (A) | 0.82 (B) | |
5 | 0.0075 | PC | 0.92 (A) | 0.32 (D) | 0.46 (D) | 0.59 (D) | 0.94 (A) | 0.91 (A) | 0.44 (D) | −0.43 (D) | 0.78 (B) | −0.03 (D) |
0.1354 | KF | 0.93 (A) | 0.84 (B) | 0.79 (B) | 0.81 (B) | 0.97 (A) | 0.89 (B) | 0.61 (C) | 0.39 (D) | 0.90 (A) | 0.60 (C) | |
0.8525 | PF | 0.94 (A) | 0.86 (B) | 0.84 (B) | 0.76 (B) | 0.96 (A) | 0.92 (A) | 0.67 (C) | 0.38 (D) | 0.91 (A) | 0.77 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.91 (A) | 0.77 (B) | |
6 | 0.0001 | PC | 0.89 (B) | 0.02 (D) | 0.31 (D) | 0.56 (C) | 0.93 (A) | 0.89 (B) | 0.32 (D) | −0.90 (D) | 0.70 (B) | −0.42 (D) |
0.1517 | KF | 0.92 (A) | 0.80 (B) | 0.79 (B) | 0.91 (A) | 0.97 (A) | 0.87 (B) | 0.49 (D) | 0.18 (D) | 0.89 (B) | 0.51 (C) | |
0.8419 | PF | 0.90 (A) | 0.85 (B) | 0.82 (B) | 0.76 (B) | 0.95 (A) | 0.90 (A) | 0.65 (C) | 0.30 (D) | 0.88 (B) | 0.56 (C) | |
/ | CF | / | / | / | / | / | / | / | / | 0.89 (B) | 0.59 (C) |
LT (h) . | WT . | CT . | 1 . | 2 . | 3 . | 4 . | 5 . | 6 . | 7 . | 8 . | 9 . | 10 . |
---|---|---|---|---|---|---|---|---|---|---|---|---|
/ . | / . | TF . | 0.88 (B) . | 0.82 (B) . | 0.73 (B) . | 0.68 (C) . | 0.97 (A) . | 0.83 (B) . | 0.66 (C) . | 0.40 (D) . | 0.85 (B) . | 0.55 (B) . |
1 | 0.7561 | PC | 0.99 (A) | 0.97 (A) | 0.97 (A) | 0.95 (A) | 0.99 (A) | 0.99 (A) | 0.97 (A) | 0.94 (A) | 0.99 (A) | 0.96 (A) |
0.0245 | KF | 0.94 (A) | 0.90 (A) | 0.85 (B) | 0.84 (B) | 0.98 (A) | 0.91 (A) | 0.82 (B) | 0.67 (C) | 0.93 (A) | 0.78 (B) | |
0.2093 | PF | 0.99 (A) | 0.94 (A) | 0.98 (A) | 0.96 (A) | 0.99 (A) | 0.98 (A) | 0.89 (B) | 0.81 (B) | 0.95 (A) | 0.90 (A) | |
/ | CF | / | / | / | / | / | / | / | / | 0.99 (A) | 0.97 (A) | |
2 | 0.5535 | PC | 0.98 (A) | 0.90 (A) | 0.89 (B) | 0.85 (B) | 0.98 (A) | 0.96 (A) | 0.91 (A) | 0.77 (B) | 0.95 (A) | 0.84 (B) |
0.0526 | KF | 0.93 (A) | 0.90 (A) | 0.84 (B) | 0.81 (B) | 0.99 (A) | 0.90 (A) | 0.80 (B) | 0.64 (C) | 0.92 (A) | 0.76 (B) | |
0.3844 | PF | 0.96 (A) | 0.90 (A) | 0.92 (A) | 0.86 (B) | 0.99 (A) | 0.93 (A) | 0.89 (B) | 0.70 (B) | 0.96 (A) | 0.84 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.97 (A) | 0.90 (A) | |
3 | 0.1467 | PC | 0.97 (A) | 0.77 (B) | 0.77 (B) | 0.77 (B) | 0.97 (A) | 0.95 (A) | 0.77 (B) | 0.47 (D) | 0.90 (A) | 0.62 (C) |
0.0811 | KF | 0.95 (A) | 0.91 (A) | 0.85 (B) | 0.72 (B) | 0.98 (A) | 0.92 (A) | 0.76 (B) | 0.65 (C) | 0.92 (A) | 0.77 (B) | |
0.7655 | PF | 0.96 (A) | 0.88 (B) | 0.89 (B) | 0.79 (B) | 0.98 (A) | 0.93 (A) | 0.82 (B) | 0.70 (B) | 0.95 (A) | 0.87 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.95 (A) | 0.87 (B) | |
4 | 0.0232 | PC | 0.94 (A) | 0.58 (B) | 0.62 (B) | 0.70 (B) | 0.96 (A) | 0.93 (A) | 0.65 (B) | 0.13 (D) | 0.84 (A) | 0.35 (C) |
0.1267 | KF | 0.93 (A) | 0.87 (B) | 0.80 (B) | 0.70 (B) | 0.97 (A) | 0.89 (B) | 0.67 (C) | 0.42 (D) | 0.91 (A) | 0.68 (B) | |
0.8452 | PF | 0.95 (A) | 0.90 (A) | 0.82 (B) | 0.73 (B) | 0.97 (A) | 0.94 (A) | 0.74 (B) | 0.53 (C) | 0.93 (A) | 0.82 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.93 (A) | 0.82 (B) | |
5 | 0.0075 | PC | 0.92 (A) | 0.32 (D) | 0.46 (D) | 0.59 (D) | 0.94 (A) | 0.91 (A) | 0.44 (D) | −0.43 (D) | 0.78 (B) | −0.03 (D) |
0.1354 | KF | 0.93 (A) | 0.84 (B) | 0.79 (B) | 0.81 (B) | 0.97 (A) | 0.89 (B) | 0.61 (C) | 0.39 (D) | 0.90 (A) | 0.60 (C) | |
0.8525 | PF | 0.94 (A) | 0.86 (B) | 0.84 (B) | 0.76 (B) | 0.96 (A) | 0.92 (A) | 0.67 (C) | 0.38 (D) | 0.91 (A) | 0.77 (B) | |
/ | CF | / | / | / | / | / | / | / | / | 0.91 (A) | 0.77 (B) | |
6 | 0.0001 | PC | 0.89 (B) | 0.02 (D) | 0.31 (D) | 0.56 (C) | 0.93 (A) | 0.89 (B) | 0.32 (D) | −0.90 (D) | 0.70 (B) | −0.42 (D) |
0.1517 | KF | 0.92 (A) | 0.80 (B) | 0.79 (B) | 0.91 (A) | 0.97 (A) | 0.87 (B) | 0.49 (D) | 0.18 (D) | 0.89 (B) | 0.51 (C) | |
0.8419 | PF | 0.90 (A) | 0.85 (B) | 0.82 (B) | 0.76 (B) | 0.95 (A) | 0.90 (A) | 0.65 (C) | 0.30 (D) | 0.88 (B) | 0.56 (C) | |
/ | CF | / | / | / | / | / | / | / | / | 0.89 (B) | 0.59 (C) |
Note: LT: lead time; WT: weight; CT: correction technique; /: not applicable.
When the lead time increases from 1 to 6 h, the NSE values of all three correction techniques decrease. For PC, the slope of the average decrease in NSE is −0.131, the number of largest NSE values decreases from 8 to 0 and the number of grade A precision categorizations decreases from 10 to 1; for KF, the respective categories are −0.026, from 0 to 4 and from 5 to 3; for PF, the respective categories are −0.036, from 4 (2 parallel) to 6 and from 8 to 3. In general, for the overall consistency index, the decline in the performance of PC is much faster than that for KF and PF. For 1 and 2 h lead times, the order of correction performance is PC, PF and KF, but for 3–6 h lead times, the order is PF, KF and PC.
When the lead time increases from 1 to 6 h, the NSE values of CF decrease; and the weights of PC decrease from 0.7561 to 0.0001, while those of KF and PF increase from 0.0245 and 0.2093 to 0.1517 and 0.8419, respectively. For 1 and 2 h lead times, the NSE values of CF are higher than those of PC, KF and PF; and the weights of PC are the largest and far greater than those of KF and PF. For 3–6 h lead times, the NSE values of CF are also the top 1 (but parallel); and the weights of PF are the largest and far greater than those of PC and KF. The weights also reflect that PC performs significantly better for 1–2 h lead time, while PF performs significantly better for 3–6 h lead time.
For NSE values of correction techniques lower than that of TF, when the proportion reaches 40% (i.e., the number reaches 4 for PC, KF and PF and 1 for CF), the correction technique is considered to be inapplicable during the corresponding lead time. For 3 h lead time, the number of flood events is 1 using PC, while for 4 h lead time, the number is 7; therefore, PC is applicable for only 1–3 h lead times. Using KF, the number for 5 h lead time is 2, while for 6 h lead time, the number is 4; therefore, KF is applicable in only 1–5 h lead times. Using PF, the number is only 3 for 6 h lead time; therefore, PF is applicable for all lead times (1–6 h). Using CF, the number is 0 for all lead times; therefore, CF is applicable for all lead times (1–6 h).
DISCUSSION
For 3 h lead time, for the peak discharge index, the peak discharges of 6, 15 (6 are the same as TF), 8 (6 are the same as TF) and 9 (5 are the same as TF) flood events obtained by TF, PC, KF and PF, respectively, are larger than the observed values. The reason is that the TF forecasting values are small and the forecasting errors are large when the observed values rise sharply with rising flood waters. However, the TF forecasting errors decrease approaching the flood peak because the rate of increase in the observed values will slow down. The correction values by PC are not involved in the subsequent calculations. When the forecasting error of TF is large at time t and small at time t+t0, or vice versa, a large PC correction error is observed, especially for the peak. The similarity between KF and PF is that the correction value at time t+t0 is involved in subsequent calculations. In addition, their correction performance is less affected by TF forecasting error, and the changes in their correction values are relatively stable over time for a flood event. Therefore, the positive and negative peak discharge errors of KF are essentially the same as those of TF. The changes in the correction values by PF are larger than that by KF because PF uses a large number of particles to approximate the true value. For the peak time index, the peak times by TF, PC, KF and PF of 12, 8, 7 and 11 h, respectively, occur later, indicating that the forecasted peak time is unfavourably delayed. Nevertheless, the change trend is not obvious and needs further study. For the process discharge index, PC has the largest number of events with the highest qualified rates. The correction performances of KF and PF are affected mainly by the gain matrix and the importance probability density function, respectively. The responses to sudden discharge fluctuations are slower when using KF and PF than when using PC, which leads to low qualified rates for process discharge forecasting. The large peak discharge error for CF is affected mainly by the large error in the peak discharge for PC. PC performs better in the process discharge index of the permissible range, and thus, the weight obtained by the least square method when considering this index is relatively large. However, the poor correction performance of PC in the peak discharge index combined with the large weight leads to the above results.
For different lead times (1–6 h), the assumption of the same ratio between the times t and t+t0 in PC is difficult to satisfy with an increase in the lead time; as a result, a decline is observed in the correction performance in conjunction with poor results. Both KF and PF are applicable for long lead times. The difference between KF and PF lies in their different realization methods. The KF gain matrix, which can be regarded simply as a ‘coefficient’, is computed by an error covariance matrix; this ‘coefficient’ is multiplied by the error at time t and added to the forecasting value at time t+t0 to obtain the correction value at time t+t0. For PF, the particle weight corresponding to the forecasting value is calculated according to the error at time t. The error probability is obtained from the importance probability density function (i.e., the TF error distribution in the section ‘Study area and flood characteristics’). In addition, the error probability is multiplied by the initial weight of 1/N and normalized to obtain the updated weight; and the correction value at time t+t0 is obtained by multiplying the forecasting value at time t+t0 by the updated weight and summing the results. Therefore, the correction performances of KF and PF are less affected by the lead times than that of PC.
One of the reasons why CF does not perform best for 3–6 h lead time is probably that the number of flood events used for training is too small. In addition, the cumulative errors of the eight flood events used for training by different correction techniques vary regularly with the increase in the lead time. When the lead time increases from 1 to 6 h, the cumulative errors of PC decrease from 7,610 to −78,036 m3/s, and those of KF decrease from 60,247 to 41,386 m3/s, while those of PF increase from −18,416 to 37,492 m3/s; as a result, the weighted average cumulative error increase from 3,376 to 37,834 m3/s, which may be one of the reasons why CF does not perform well enough for 3–6 h lead time.
CONCLUSIONS
Real-time flood forecasting correction techniques play a considerable role in fully utilizing real-time observed hydrologic data, improving forecasting performance and creating strategies to optimize disaster prevention and better make decisions. However, there are some limitations when using PC and KF coupled with the Muskingum method; for example, PC suffers from a short lead time, and KF displays an inadequate correction performance. In this study, PF is introduced into the field of real-time flood forecasting and coupled with the Muskingum method. PC, KF and PF are applied to the real-time forecasting of 10 flood events from the Yongan hydrological station to the Shaxian hydrological station along the Shaxi River in China to compare their performances and evaluate their applicability. In addition, the performance of the weighted average CF method is studied. The main conclusions are as follows:
For 3 h lead time, the performance of PF in the overall consistency index, including the NSE value and the precision grade, is optimal, followed by those of KF and PC. For the permissible range index, the peak discharge performances using KF and PF are similar and those using PF are slightly superior; however, PC performs the worst among these techniques. The peak time performance using PF is better than that using the other two techniques, which exhibit similar performances. The process discharge performance of PC is slightly better than that of PF and much better than that of KF. Furthermore, the weighted average CF including the three correction techniques is constructed. The CF weights decrease in the order of PF, PC and KF, and its performance is similar to PF. Generally, the comprehensive performances of all the considered techniques (from adequate to poor) are in the order of PF, CF, KF and PC.
When the lead time increases from 1 to 6 h, the decline in the performance of PC is much faster than those of KF and PF, indicating that the influence of the lead time on PC is much larger than those on the other two techniques. The performance of PC is optimal for 1 and 2 h lead times, while the performance of PF is optimal for 3–6 h lead times. For 1 and 2 h lead times, the NSE values of CF are higher than those of PC, KF and PF; and the weights of PC are the largest and far greater than those of KF and PF. For 3–6 h lead times, the NSE values of CF are also the top 1 (but parallel); PC, KF, PF and CF are applicable for 1–3, 1–5, 1–6 and 1–6 h lead times, respectively. For short lead times (1 and 2 h), PC is applicable; its performance is the best except for CF, and the computation requires minimal time for accurate forecasting. For long lead times (3–6 h), PF is applicable because of its highest performance. In contrast, CF, with its long computation time, should not be selected for short and long lead times. PC and KF lead times are increased by 3 and 1 h, respectively, by using PF. Furthermore, PF coupled with the Muskingum method can provide high-precision forecasting results for longer lead times to support flood control strategies.
The importance of flood peak discharge and peak time forecasting is self-evident, but their performance is not satisfactory. Therefore, improving the performance of real-time correction techniques for peak discharge and peak time forecasting should be the focus of future studies. Comparisons among extended KF, Ensemble KF and PF applied to nonlinear systems should be performed, and the application of PF in channels with longer flood travel times should also be further studied. In addition, the impacts of the methods on the uncertainty estimates and the uncertainties arising from the quality and amount of observed data should be considered. A greater number of flood events are needed to study the performance of CF and multimethod CF (i.e., different indexes should be evaluated by a combination of results from different forecasting methods), which represent two methods of forecasting using different techniques.
ACKNOWLEDGEMENTS
This research was funded by the National Key Research and Development Program of China (grant no. 2017YFC0404701) and the National Natural Science Foundation of China (grant nos 51779271 and 51509267). The authors thank the Hydrologic and Water Resources Survey Bureau, Sanming Branch for providing the hydrologic database.