This study performed a flood risk assessment using one of the multi criteria decision-making methods to identify the small stream basins with high risk of flooding and to determine the optimal small stream restoration measures by priority ranking for flood risk. The 12 representative factors for the flood risk assessment were carefully selected and constructed for the three main aspects, such as pressure factors, state factors and response factors including the government capacities under the pressure-state-response classification system for identifying the 212 small stream watersheds. The entropy weight coefficient method helps to reduce subjective judgments as well as calculate effective weighting coefficients. To evaluate the practical applications of the proposed method, the results from the preference ranking organization method for enrichment evaluation (PROMETHEE) with six preference functions are compared with the official priority ranking of flood risk assessment for the Small Stream Watershed Restoration Projects which is determined by the weighted method. Also, guidelines for the community-based restoration projects such as prevention or preparedness, sustainable development and resilient recovering have been suggested based on the three predicted priority ranking groups. It is expected that the flood risk assessment ranking ensured by full verification can help to establish optimal regional restoration plans against flooding disasters with respect to causes and characteristics of past flash flood.

Now, high intensity localized heavy rainfall is increasing in the pacific region which can cause massive flash floods causing enormous damage, especially in small stream watersheds and even in urban areas. Floods depend on precipitation intensity, volume, timing, antecedent conditions of streams and their drainage basins (Collins & Simpson 2007). Human encroachment into flood plains and lack of flood response plans increase the damage potential. Development activity, particularly deforestation and intensive crop production, as well as increasing impervious cover, may drastically change runoff conditions, thereby increasing stream flow during normal rainfall cycles and thus increasing the risk of flooding and soil degradation (Klein 1979; Bannerman et al. 1993; Coles et al. 2012). Intensive use of the floodplain, even under strict management, usually results in increased runoff rates. Small streams have a high risk for flash floods due to the presence of slopes thus, the rate of down cutting are high and the valley walls are often exposed to bedrock. Those in the mountains and steep narrow valleys generate rapid flowing waters which quickly raises water depths and thus resulting in a reduced evacuation time for residents in affected areas and an increase in damage. In addition, streams such as those in low water crossings, mountains and urban areas rampant with pavement and roof covers have a high risk for flash floods. Flood-related disasters in Korea are classified according to several considerations such as location, however, urbanized cities situated within the vicinity of small streams have become more susceptible and vulnerable to flash floods.

Among total streams of 26,595 (62,040 km) in Korea, 84 (3,258 km) are national streams whereas 3,847 streams (26,967 km) are local streams, both covered by the River Law (Han River Flood Control Office 2008). The small streams managed by the Small River Maintenance Act are 22,664 streams (35,815 km) which is 51.2% of the total number of streams. Table 1 shows the number of small streams and restoration ratio performed in each province over 16 years from 1995 to 2010. The mega cities such as Seoul, Jeju, Busan, Ulsan, Gwangju, Incheon, Daejeon and Daegu have a relatively small number of small streams, and provinces such as Jeonra-Buk-do, Gwangwon-do, Jeonra-Nam-do, Chungcheong-Nam-do, Gyunggi-do, Gyeongsang-Nam-do, Chungcheong-Buk-do and Gyeongsang-Buk-do have small streams evenly. The restoration lengths of small streams tasked to the national and metropolitan city government were 3,199 km (98.2%) and 18,417 km (68.3%) respectively while the restoration lengths of small streams tasked to the local government managed was 4,769 km (41.2%). The restoration ratio of small streams managed by local government is not high because the length of these small streams is long. The 14,769 km small streams out of the total length of 35,815 km were restored over 16 years from 1995 to 2012 and the total allocated budget for these projects was almost 310 billion US dollars. The comparative results of damage and expenses of the Small Stream Watershed Restoration Projects (SSWRPs) from 2001 to 2010 demonstrated convincingly that the SSWRPs can help to reduce the flood-related damage in the small stream watersheds (Cheong 2011). Despite its success, existing small streams restoration projects were facing significant resource allocation challenges as well as problems for selecting optimum measures for flood risk reduction considering community needs and available resources. Thus, the priority setting based on the flood risk assessment is needed for decision-making to allocate resources and select optimum community based restoration measures.

Table 1

The status of the SSWRPs during 16 years from 1995 to 2010

City and provinceStream numberTotal lengthRestoration ratio
Seoul 13 14.800 10.8 
Busan 37 46.600 47.9 
Daegu 135 208.60 89.0 
Daejeon 78 119.20 67.1 
Incheon 118 178.30 61.4 
Gwangju 25 49.100 58.4 
Ulsan 140 160.70 57.0 
Jeju 83 222.90 17.4 
Gyeongsang-Buk-do 3821 6851.0 55.8 
Chungcheong-Buk-do 2188 3569.8 47.1 
Gyeongsang-Nam-do 2949 3463.0 43.9 
Gyunggi-do 2224 3245.8 42.0 
Chungcheong-Nam-do 2455 3409.3 38.3 
Jeonra-Nam-do 3496 5324.8 36.0 
Gangwon-do 2427 5652.8 30.2 
City and provinceStream numberTotal lengthRestoration ratio
Seoul 13 14.800 10.8 
Busan 37 46.600 47.9 
Daegu 135 208.60 89.0 
Daejeon 78 119.20 67.1 
Incheon 118 178.30 61.4 
Gwangju 25 49.100 58.4 
Ulsan 140 160.70 57.0 
Jeju 83 222.90 17.4 
Gyeongsang-Buk-do 3821 6851.0 55.8 
Chungcheong-Buk-do 2188 3569.8 47.1 
Gyeongsang-Nam-do 2949 3463.0 43.9 
Gyunggi-do 2224 3245.8 42.0 
Chungcheong-Nam-do 2455 3409.3 38.3 
Jeonra-Nam-do 3496 5324.8 36.0 
Gangwon-do 2427 5652.8 30.2 

A priority setting approach based on flood risk assessment can be used for defining the relative importance of the SSWRPs which can be used to protect sensitive watershed resources or restore small stream watersheds for reducing flood risk (Cheong et al. 2011; Lee et al. 2011). Lim et al. (2010) suggested representative factors for the disaster risk assessment constructed by the P-S-R (pressure-state-response) classification system for identifying the watershed. UNISDR (2004) reported that hazards, vulnerabilities and capacity of local communities should be considered for flood-related disaster risk assessment. Substantial progress has been made in the last decade regarding the development of theoretical frameworks and practical strategies to guide and evaluate priority setting on various areas including flood control projects, water and sanitation improvement (Kang & Kim 2006; Choi et al. 2013), multi-object dam construction and small stream watershed restoration (Beechie et al. 2000; Beechie 2001; Roni et al. 2002; Mitton & Donaldson 2003; Gibson et al. 2004; Pess et al. 2005). Ridgley (1992) used an analytic hierarchy process method to define the ripple effects of drought on the water demand and supply and also presented analytic hierarchy process based on optimal water allocation method for reducing drought damage (Ridgley 1993). Bruen (2002) validates both methods of analytic hierarchy process and multi-attribute utility theory to develop the watershed management decision support system and Jandric & Srdjevic (2000) used an analytic hierarchy process and multi-attribute utility theory to find the optimal location for groundwater storage at NoviSad city in Yugoslavia. Jaber & Mohsen (2001) applied an analytic hierarchy process to find optimal solution on the water supply system. Udías et al. (2011) used a multi-objective evolutionary algorithm to identify efficient trade-offs between program of measures cost and water quality for selecting the most effective combinations of sewage treatment technologies.

Various water allocation management problems were analyzed at operational level (Horboe 1992) which are also related to reservoir management (Ko et al. 1992, 1994) and in ground water management (Shafike et al. 1992; Woldt & Bogardi 1992). For flood disaster management, Akter & Simonovic (2002) used analytic hierarchy process and multi-attribute utility theory to analyze alternatives and make a group decision. Cetinkaya et al. (2007) used a dynamic simulation model with its associated databases and a water resources planning and optimization system for water management in a test basin within the scope of the EU-sponsored SMART and OPTIMA projects. Jason et al. (2007) used an analytic hierarchy process to establish flood hazard mitigation and emergency preparedness plan in the urban area. The outranking method is also applied for various cases in Europe. Raju et al. (2000) used the preference ranking organization method for enrichment evaluation (PROMETHEE) and elimination et choix traduisant la realité (elimination and choice expressing reality) (ELECTRE) to evaluate the possibility of developing irrigation areas on Flumen Monegros in Spain. Also, the PROMETHEE was used for water resources management, optimal flood mitigation plan and priority setting of river restoration (Hyde et al. 2004; Maragoudaki & Tsakiris 2005; Hermans et al. 2007). Khelifi et al. (2006) developed a decision support tool of Credence Clearwater Revival using the PROMETHEE II algorithm to assess the available technologies and select the preferred groundwater remedial options.

In Korea, most of the multi-criteria decision-making methods including PROMETHEE are limitedly applied in operation level but actively used for research purposes. Within these methods, analytic hierarchy process method is widely used in integrated water resources management (Kim et al. 2012). Park (2002) applied an analytic hierarchy process method to set the priority of current streams for adjustment of stream grade and enhancement of the efficiency of managing the river. For making decisions on the drought management, a decision tree method was developed (Kim 2001; Kang & Yoon 2002). Korea Water Resources Corporation (2002) and Lee & Shim (2002) used an analytic hierarchy process to determine the weight and priority of water allocation. Kim et al. (2009) performed priority setting research to determine the optimal location for development of small hydropower using the analytic hierarchy process method. Recently, Hong et al. (2006) performed risk assessment for the water distribution network using both the PROMETHEE and the analytic hierarchy process method. Kim (2006) proposed the new multi-criteria decision-making methods for priority setting of dam construction projects by using an analytic hierarchy process to determine the weights and added ELECTRE as a rank preferred technique. The PROMETHEE method was used for flood inundation risk assessment (Choi 2009) for increasing flood control capacities of the multi-objective reservoirs (Nam 2007) and for priority setting of non-point pollutants management methods (Min 2009). Park et al. (2005) and Kim et al. (2012) applied a multi-attribute utility theory for priority setting of government-funded research and development projects. However, despite current efforts to create a comprehensive approach for priority setting, there are no single or easy tools that can help government officials to evaluate SSWRPs and therefore guide them to select optimal measures for flood-related disaster risk reduction.

In this study, the 12 representative factors for flood risk assessment are carefully selected and constructed for the three main aspects under the pressure-state-response (P-S-R) classification system for identifying 212 small stream watersheds. The entropy weight coefficient method is used to determine unbiased weight of criteria. The official priority ranking on the SSWRPs is predicted by the weighted method. The priority ranking of the flood risk assessment estimated by the PROMETHEE with six alternative preference functions are compared with the official values to select best preference function. The priority ranking estimated by the proposed method are divided into three groups such as low priority group for prevention or preparedness projects, middle priority group for sustainable development project and high priority group for resilient recovering projects which can be used for decision-making to find local adapted SSWRPs for protecting sensitive watershed resources or restoring small streams. Also, this will serve as guidelines to establish measures for reducing flood-related damage due to localized heavy rainfall and massive flash flooding.

In Korea, the main goal of the SSWRPs is to recover stream channels to its natural states by means of sustaining hydraulic stability in the banks and streambeds as well as securing that the channels have enough capacity to transport and utilize its sediment and debris effectively. However, an extensive understanding of how ecosystems have changed according to possible alternates of restoration projects (Parker 1997; Beechie et al. 2000; Ehrenfeld 2000) and deep consideration of the major needs of the local communities (Ebersole & Liss 1997) are important for successful SSWRPs. Furthermore, changing of geographical features and channel shapes due to frequent local damage caused by flooding, sediment transport or urban development should be considered in the small stream restoration plans.

To reduce flood damage in the small stream watersheds, the Korean government legislated the Small Stream Development Act and has performed SSWRPs since 1995. The National Emergency Management Agency, Korea, established the master plan for the SSWRPs every year for the flood-related disaster risk reduction and resilient recovery. The main goals of watershed restoration projects includes rebuilding the channel banks or buying the land in the damaged areas along the stream. Since 2005, small stream restoration project types have been changing in order to cope with environmental changes as presented in Table 2. Despite the government efforts on watershed restorations, numerous stream and watershed restoration projects have failed to accomplish all their objectives, except for reducing flood damage (Cheong et al. 2011). However, the small stream restoration plans do not represent recent extreme disasters caused by localized heavy rainfall, massive flash flooding and current social and environment changes. Each failure has various causes such as: (i) damage of the natural environment due to channel maintenance, aggregate extraction, floodplain development; (ii) lack of animal and flora survey; (iii) adverse effect on ecosystems caused by sediment outflow during restoration; (iv) inconsistent small stream restoration between downstream and upstream areas; (v) disconnection of ecosystem by submerged weir and drop structures; (vi) simplification habitat for aquatic organisms and increased erosion due to the river straightening and riverbed flattening; (vii) lack of monitoring data such as water surface elevation and flow discharge for stream runoff analysis; (viii) insufficiency of water pollution reduction measures; (ix) lack of guidelines for more appropriate budget allocation for the SSWRPs; and (x) impaired flood control functions in downstream areas by basin or watershed units of a comprehensive disaster prevention restoration rather than prevention-oriented upstream restoration.

Table 2

Brief description of three general strategies for prioritizing small stream restoration actions

StrategyPeriodsGeneral description
Embankment
Facility
Restoration 
1995–1999 
  • Focus on structural changes to prevent river bank

  • Lost original characteristics of natural streams by concrete embankment

  • Increase flood risk in downstream by changes in straight channel shape

  • Disconnect ecosystem by high cutting bank slope or retaining wall

  • Disharmonize with surrounding landscape by excessive changing channel pattern and geography

 
Landscape
Facility
Restoration 
2000–2004 
  • Focus on development of environmental friendly natural stream

  • Prevent pool-riffle structures in the channel

  • Use eco-friendly material such as wood, grass, stone, clay and other natural materials

  • Water as nature-friendly appearance, while very limited habitat features

 
Eco-river
Facility
Restoration 
2000–2004 
  • Use natural materials and prevent natural river sinuosity

  • Provide only part of the ecosystem as habitat

  • Lack of considering ecological characteristics of upper, middle and down parts in the small stream

 
StrategyPeriodsGeneral description
Embankment
Facility
Restoration 
1995–1999 
  • Focus on structural changes to prevent river bank

  • Lost original characteristics of natural streams by concrete embankment

  • Increase flood risk in downstream by changes in straight channel shape

  • Disconnect ecosystem by high cutting bank slope or retaining wall

  • Disharmonize with surrounding landscape by excessive changing channel pattern and geography

 
Landscape
Facility
Restoration 
2000–2004 
  • Focus on development of environmental friendly natural stream

  • Prevent pool-riffle structures in the channel

  • Use eco-friendly material such as wood, grass, stone, clay and other natural materials

  • Water as nature-friendly appearance, while very limited habitat features

 
Eco-river
Facility
Restoration 
2000–2004 
  • Use natural materials and prevent natural river sinuosity

  • Provide only part of the ecosystem as habitat

  • Lack of considering ecological characteristics of upper, middle and down parts in the small stream

 

Flood risk assessment results defined by priority ranking can support decision-making to allocate limited resources and select optimum small stream restoration projects fulfilling goals of SSWRPs and solve problems caused by many of the reasons listed above. The priority setting based on the flood risk assessment provides a useful tool to reduce indiscriminate projects and lead effective watershed restoration projects for protecting sensitive watershed resources and reducing flood-related damage due to localized heavy rainfall and massive flash flooding. For example, if a small stream in a mountainous or rural area has a low priority ranking on the flood risk assessment, building embankments to prevent high water from flooding the bordering land is sublated and diversity such as buying the agricultural lands along the stream to storage flood water is preferred for flood control on the small streams. The adaptable guideline is also needed for selecting more urgent or optimum restoration projects among various alternates of SSWRPs submitted by local governments. It is also expected that priority ranking can support the local government to establish optimal regional rehabilitation plans against flooding disasters with respect to the causes and characteristics of past floods and major needs of the local communities. Now, there is no flood related damage in small streams of urban areas because the restoration ratio of the small streams managed by the metropolitan city government is almost 70%. Thus guidelines are needed to provide a more appropriate budget allocation for SSWRPs to reduce flood related damage in small streams managed by local government and to increase the flood related disaster management capacity of local government.

MCDA is aimed at supporting decision makers faced with evaluating alternatives taking into account multiple, and often conflictive, criteria. The MCDA process consists of the following phases: problem identification and structuring, model building and use; and the development of action plans. MCDA modelling consists of four key elements: (1) the alternatives to be appraised; (2) the criteria (or attributes) against which the alternatives are appraised; (3) scores that reflect the value of an alternative's expected performance on the criteria; and (4) criteria weights that measure the relative values of each criterion as compared to others. For the priority setting of the SSWRPs based on flood risk assessment, a set of criteria was established to evaluate the needs of community, environmental effects and benefit of each small stream region. Evaluation criteria were determined by qualitative method to represent small stream characteristics such as: (i) reviewing existing river restoration plans developed by Ministry of Land, Transport and Marin Affairs (MLTM); (ii) discussion with government experts; (iii) deep consideration; and (iv) data availability. To minimize redundancy, some attributes such as two criteria should provide the same or very similar concepts or measures excluding the objectives. MLTM (1999) selected criteria such as: (i) the characteristics of the prone areas; (ii) the frequency of the flood-related damage; (iii) causes of damage; and (iv) the benefit to set the priority of the river restoration project on improving the flood prone area. MLTM (2005) also developed additional guidelines in selected criteria such as regional characteristics, frequency of past flooding, flood risk analysis and economic dimensions (benefit-cost ratio). The evaluation criterion shown in Table 3 was used to determine the priorities of the river restoration projects according to the river master plans.

Table 3

The priority of the river restoration project on improving the flood prone area

Generalized criterion
Evaluation criteria12345Weighting factor (%)
Location Mountainous Agricultural Rural Small urban Urban 10 
Completeness of restoration Complete Almost Half A little Incomplete 15 
Existing facilities condition Very good Good Fair Poor Very poor 15 
Future planned facilities Nothing A few Small Many So many 10 
Flooding damage during past 10 years 1–2 3–4 5–6 >7 20 
Civil complaint during past 10 years Nothing A few Occasionally Sometime Frequent 20 
Years after the river master plan 10 years 12 years 13 years 14 years 15 years 10 
Generalized criterion
Evaluation criteria12345Weighting factor (%)
Location Mountainous Agricultural Rural Small urban Urban 10 
Completeness of restoration Complete Almost Half A little Incomplete 15 
Existing facilities condition Very good Good Fair Poor Very poor 15 
Future planned facilities Nothing A few Small Many So many 10 
Flooding damage during past 10 years 1–2 3–4 5–6 >7 20 
Civil complaint during past 10 years Nothing A few Occasionally Sometime Frequent 20 
Years after the river master plan 10 years 12 years 13 years 14 years 15 years 10 

To solve the multi criteria problem on the SSWRPs priority setting based on flood risk assessment, the 12 representative factors were carefully selected and constructed. Detailed hierarchical structure for priority setting for the flood risk assessment were categorized such as: (i) number of poor facilities; (ii) number of disasters during past five years; (iii) total damage during past five years; (iv) type of damage; (v) watershed area; (vi) ratio of residential area to total watershed area; (vii) channel slope; (viii) restoration ratio of the restoration channel length to total channel length; (ix) number of residents; (x) waterfront revitalization area; (xi) number of public facilities; and (xii) establishment of master plan. For criteria evaluation analysis, 212 small streams data were collected from all stream watersheds of Korea, specifically 38 streams data from Gangwon-do, 65 streams data from Gyeongsang-Buk-do including three of Daegu, 41 streams data from Gyeongsang-Nam-do, 37 streams from Jeonra-Buk-do and 30 streams from Chungcheong-Buk-do. These small streams have a length distribution between 65,011,080 m with an average length of 3,851 m. The statistical values, such as the minimum, mean and maximum values of each criteria indicator collected in provinces, are listed in Table 4. The 12 evaluation criteria were constructed for the three main aspects, such as PF (pressure factors), SF (state factors), and RF (response factors including the capacities of local government) under the P-S-R classification system for identifying the SSWRPs.

Table 4

Statistical chart of criteria collected from small steam watersheds in Korea

C6
RegionStatisticsC1C2C3C5PaddyFarmForestSiteResidentialC7C8C9C10C11
Gang won-do Mean 15 0.1940 6.99 9.46 7.82 78.8 1.64 4.60 0.0571 56.5 68 22.82 
Max. 39 0.6880 30.9 25.2 14.1 90.0 5.20 8.90 0.2865 100 482 171.5 
Min. 0.0010 0.70 0.04 0.07 57.1 0.10 0.18 0.0084 14.5 0.200 
Gyeong sang-Buk-do Mean 17 3.7200 7.28 15.9 6.85 71.0 3.25 4.85 0.0609 32.5 84 16.97 
Max. 64 25.790 41.1 58.9 16.9 96.3 15.1 15.6 0.3300 80.0 570 66.25 17 
Min. 0.0280 0.76 0.62 0.31 16.2 0.50 0.94 0.0055 0.80 1.000 
Gyeong sang-Nam-do Mean 12 108.28 28.6 18.9 7.41 68.1 4.38 3.65 0.0384 59.6 137 17.27 
Max. 38 106.72 1028 42.5 18.3 89.1 12.6 7.80 0.1429 100 1141 104.0 
Min. 0.0023 0.39 3.70 0.60 33.7 0.52 0.10 0.0019 0.7 17 0.210 
Jeonra-Buk-do Mean 11 106.32 3.24 19.0 8.19 62.3 4.79 8.09 0.0568 67.2 121 52.57 
Max. 29 655.29 9.95 50.0 27.7 86.2 19.9 26.4 0.2282 100 795 211.0 47 
Min. 0.1642 0.44 5.47 2.99 16.0 0.38 1.02 0.0058 35.5 17 0.260 
Chungcheong-Buk-do Mean 16 0.1236 4.50 16.5 13.3 64.2 4.44 8.35 0.1871 53.8 89 52.41 
Max. 41 15 0.3583 11.3 43.0 39.6 82.0 8.76 40.0 0.8839 100 292 296.0 
Min. 0.0075 0.98 3.00 2.90 13.6 0.04 1.68 0.0110 14.5 10 1.570 
Total Mean 19 10.416 66.2 22.5 11.8 58.9 6.01 8.81 0.1358 54.4 255 67.61 
Max. 64 15 106.72 1028 58.9 39.6 96.3 19.9 40.0 0.8839 100 1141 296.0 47 
Min. 0.0013 0.39 0.04 0.07 13.6 0.04 0.10 0.0019 0.7 0.200 
C6
RegionStatisticsC1C2C3C5PaddyFarmForestSiteResidentialC7C8C9C10C11
Gang won-do Mean 15 0.1940 6.99 9.46 7.82 78.8 1.64 4.60 0.0571 56.5 68 22.82 
Max. 39 0.6880 30.9 25.2 14.1 90.0 5.20 8.90 0.2865 100 482 171.5 
Min. 0.0010 0.70 0.04 0.07 57.1 0.10 0.18 0.0084 14.5 0.200 
Gyeong sang-Buk-do Mean 17 3.7200 7.28 15.9 6.85 71.0 3.25 4.85 0.0609 32.5 84 16.97 
Max. 64 25.790 41.1 58.9 16.9 96.3 15.1 15.6 0.3300 80.0 570 66.25 17 
Min. 0.0280 0.76 0.62 0.31 16.2 0.50 0.94 0.0055 0.80 1.000 
Gyeong sang-Nam-do Mean 12 108.28 28.6 18.9 7.41 68.1 4.38 3.65 0.0384 59.6 137 17.27 
Max. 38 106.72 1028 42.5 18.3 89.1 12.6 7.80 0.1429 100 1141 104.0 
Min. 0.0023 0.39 3.70 0.60 33.7 0.52 0.10 0.0019 0.7 17 0.210 
Jeonra-Buk-do Mean 11 106.32 3.24 19.0 8.19 62.3 4.79 8.09 0.0568 67.2 121 52.57 
Max. 29 655.29 9.95 50.0 27.7 86.2 19.9 26.4 0.2282 100 795 211.0 47 
Min. 0.1642 0.44 5.47 2.99 16.0 0.38 1.02 0.0058 35.5 17 0.260 
Chungcheong-Buk-do Mean 16 0.1236 4.50 16.5 13.3 64.2 4.44 8.35 0.1871 53.8 89 52.41 
Max. 41 15 0.3583 11.3 43.0 39.6 82.0 8.76 40.0 0.8839 100 292 296.0 
Min. 0.0075 0.98 3.00 2.90 13.6 0.04 1.68 0.0110 14.5 10 1.570 
Total Mean 19 10.416 66.2 22.5 11.8 58.9 6.01 8.81 0.1358 54.4 255 67.61 
Max. 64 15 106.72 1028 58.9 39.6 96.3 19.9 40.0 0.8839 100 1141 296.0 47 
Min. 0.0013 0.39 0.04 0.07 13.6 0.04 0.10 0.0019 0.7 0.200 

This study used rating the relative priority of the criteria divided by five scale sections from 1 (equal importance) to 5 (extreme importance) to determine the priority ranking of the flood risk assessment for the SSWRPs. Each scale section was divided due to the normal distribution of each criteria for all the attributes of each alternate shown in Table 5. The weight was determined by an entropy weight coefficient method followed by the procedure presented in Figure 1 to determine the unbiased weight of the criteria. The entropy weight coefficient method, in which weights are determined by attributes information only to avoid distorted assessment by subjective opinion of decision-makers, can be used for multi-criteria decision-making cases including various attributes and many alternates. This method sets the attribute matrix of alternates to calculate entropy from normalized attributes and then determine the weight of criteria. The results of the comparison of weights of all four categories were determined to be 0.401, 0.299, 0.195 and 0.105 for the disaster risk as a pressure factor, watershed characteristics as a state factor, restoration project benefits and establishment of master plan as a response factor, respectively. Based on the comparative results of the weights, factors regarding disaster risk were highly prioritized by SSWRPs rather than environmental or ecological factors. The responses were checked with a consistency index to obtain the weight for each criterion. The response on the consistency index was returned to the respondents for cross-checking answer the questions reasonably. Evaluation criteria was classified to give high weight on the flood-prone areas or the areas with an urgent need for restoration and low weight on the small stream watershed areas located in the mountainous and rural regions. If the SSWRP was planned for buying farmland to use for the floodplain, connected to the national river, and is established for the flood risk reduction plan and, flood damage recovery, a high priority will be given.

Table 5

The indicators, subindicators and criteria to set the priority of the SSWRPs

Generalized criterion
Evaluation criteria12345Weight
Pressure factors Number of poor facilities C1 − 1 2–10 11–20 20–30 31 0.10 
Number of disasters during past 5 years C2 2 ∼ 3 4–5 0.10 
Total damage during past 5yrs (M$) C3 0.1–0.5 0.6–5 6–50 51 0.10 
Type of damage C4 Agricultural land inundation (AI) Agricultural land lost (AL) House inundation (HI) House lost (HL) Public facilities damage 0.10 
State factors Watershed area (km2C5 0–1.0 1.1–2.0 2.1–5.0 5.1–8.0 8.1 0.05 
Residential area Ratioa C6 0–20% 21–40% 41–60% 61–80% 81–100% 0.15 
Channel slope C7 − 0.100 0.101–0.070 0.071–0.040 0.041–0.010 0.011–0.000 0.05 
Restoration ratiob   C8 0–20% 21–40% 41–60% 61–80% 81–100% 0.05 
Response factors Number of residents C9 0–10 11–40 41–80 81–160 161 0.05 
Waterfront revitalization area (ha) C10 0–1.0 1.1–5.0 5.1–10.0 10.1–50.0 50.1 0.10 
Number of public facilities C11 1–2 3–4 5–7 0.05 
Others Establishment of master plan C12 – Unfinished master plan (U) Finished master plan (P) Ongoing project (O) Last year project (L) 0.10 
Total   1.00 
Generalized criterion
Evaluation criteria12345Weight
Pressure factors Number of poor facilities C1 − 1 2–10 11–20 20–30 31 0.10 
Number of disasters during past 5 years C2 2 ∼ 3 4–5 0.10 
Total damage during past 5yrs (M$) C3 0.1–0.5 0.6–5 6–50 51 0.10 
Type of damage C4 Agricultural land inundation (AI) Agricultural land lost (AL) House inundation (HI) House lost (HL) Public facilities damage 0.10 
State factors Watershed area (km2C5 0–1.0 1.1–2.0 2.1–5.0 5.1–8.0 8.1 0.05 
Residential area Ratioa C6 0–20% 21–40% 41–60% 61–80% 81–100% 0.15 
Channel slope C7 − 0.100 0.101–0.070 0.071–0.040 0.041–0.010 0.011–0.000 0.05 
Restoration ratiob   C8 0–20% 21–40% 41–60% 61–80% 81–100% 0.05 
Response factors Number of residents C9 0–10 11–40 41–80 81–160 161 0.05 
Waterfront revitalization area (ha) C10 0–1.0 1.1–5.0 5.1–10.0 10.1–50.0 50.1 0.10 
Number of public facilities C11 1–2 3–4 5–7 0.05 
Others Establishment of master plan C12 – Unfinished master plan (U) Finished master plan (P) Ongoing project (O) Last year project (L) 0.10 
Total   1.00 

aResidential area : residential area/total watershed area

bRestoration ratio : restoration length/total channel length.

Figure 1

Concept diagram of the entropy weight calculation procedure.

Figure 1

Concept diagram of the entropy weight calculation procedure.

Close modal
The objective of the multi criteria decision is as follows:
1
where A is a finite set of n alternates and to are k criteria, is the evaluation of alternate a on criterion . In order to achieve this objective, it is essential to have some information about the preferences and the priorities of the decision-maker. The two different MCDA approaches of the weighted method and the PROMETHEE approach are applied to demonstrate the potential advantages and pitfalls of using the different MCDA modelling approaches. A very common way to solve multi-criteria decision-making is to compute a weighted sum of the evaluations as where is the weight allocated to criterion , is the resulting score of alternate . This weighted method has several limits for the following reasons: (i) bad evaluation on one criterion can always be compensated by better values on other criteria; (ii) the weights of the criteria are linked to the scales of measurement of the criteria in a way that is difficult to manage; and (iii) for reducing an alternate to a single score, a lot of information should be lost about the conflicts among the criteria. For this reason, Roy (1991) proposed to build outranking relations including only realistic enrichments of the dominance relation.

The PROMETHEE method is an outranking method based on the principle of pairwise comparison of the attributes. In this model, the weighting vector W represents the relative importance of criteria for the problem. The decision matrix X represents the performance ratings of alternates with respect to criteria . Given the weighting vector and decision matrix , the objective is to rank or select the alternatives by giving each of them an overall preference value with respect to all criteria shown in Figure 2. The decision maker perceives the measurement scale of the criterion in order to make a model, the PROMETHEE method, however, requires associating a preference function to each criterion as in which and for which . To maximize a criterion, this function is giving the preference of a over b for observed deviations between their evaluations on criterion . The six types of preference functions presented in Table 6 (Brans & Mareschal 2005; Podvezko & Podviezko 2009) can be used to predict priority ranking.

Table 6

Six types of preference functions for the PROMETHEE method

TypesFunctionShape
Type I (Usual)   
Type II (U-shape)   
Type III (V-shape)   
Type IV (Discrete)   
Type V (Linear)   
Type VI (Gaussian)   
TypesFunctionShape
Type I (Usual)   
Type II (U-shape)   
Type III (V-shape)   
Type IV (Discrete)   
Type V (Linear)   
Type VI (Gaussian)   
Figure 2

Concept diagram of the PROMETHEE procedure.

Figure 2

Concept diagram of the PROMETHEE procedure.

Close modal
For pairwise comparison of more than two criteria with a given weight, preference indices are as follows:
2
3
where in the expression degree a is preferred to b over all the criteria and in b is preferred over a. In most cases, there are criteria for which a is better than b, and criteria for which b is better than a. Consequently, and are usually positive. If , a weak global preference of a over b is implied, and if , a strong global preference of a over b is implied. As each alternate a is facing alternates in A, the positive outranking flow, and the negative outranking flow, , can be calculated by using the following equations
4
5
The positive outranking flow expresses how an alternate is outranking the others. The PROMETHEE I use partial ranking obtained from the positive and the negative outranking flows. are variables for preference, indifference and incomparability, respectively
6
7
8
For complete ranking, the PROMETHEE II uses the net outranking flow as . It is the balance between the positive and the negative outranking flows. The higher the net flow, the better the alternate, such as and . indicates that a is outranking all the alternates on all the criteria, however, if , others are more outranking than a. The complete ranking is easy to use, but the analysis of the incomparability often helps to finalize a proper decision. As the net flow provides a complete ranking, it may be compared with a utility function. One advantage of is that it is built on clear and simple preference information and that it relies on comparative statements rather than absolute ones.

Official priority ranking predicted by the value measurement model

The priority of alternatives for selecting optimum SSWRPs was determined by a weighted method in which the priority ranking was calculated by multiplying the weight and scale section values determined from attributes of alternates. For the analysis, attribute information of 93 SSWRPs applied from local government in 2012 were collected which were specifically composed of 16 from Gangwon-do, 26 from Gyeongsang-Buk-do including three of Daegu, 25 from Gyeongsang-Nam-do, 11 from Jeonra-Buk-do and 15 from Chungcheong-Buk-do. The predicted results of priority ranking officially determined by the weighted method showed that A01 has the highest priority with net outranking flow of 0.4712 which mean that this stream is urgently needed for small stream watershed restoration followed by A13, A24 and A52, while A54 was the lowest priority with a net outranking flow of − 0.4296. Among the alternates, 42 small streams have positive net outranking flow and 51 small streams have negative net outranking flow. For comparison between the evaluation criteria and the net outranking flow values predicted by the weighted method, the alternates were divided into three groups: the upper rank group with the net outranking flow values from 0.2503 to 0.4712, the middle rank group with the net outranking flow values from 0.0108 to 0.2467 and the lower rank group with the net outranking flow values from − 0.4296 to − 0.0032 as shown in Table 7. To define the main criteria affecting the priority setting of the SSWRPs, correlation coefficients of each criteria to the net outranking flow values were calculated and listed in Table 8. The results show that the number of poor facilities (C1), type of damage (C4) and establishment of master plan (C12) were significantly correlated with the priority setting in the upper and middle rank groups. In the lower group, the number of disasters during the past five years (C2), total damage during the past five years (C3), watershed area (C4) and restoration ratio (C8) were correlated with priority setting of SSWRPs.

Table 7

Categorization of alternates for comparison between the evaluation criteria and the net outranking flow values

GroupNet outranking flowAlternatives
Upper rank Positive (+) A01, A13, A24, A52, A50, A30, A33, A22, A21, A18, A23, A35, A62, A55, A31 
Middle rank Positive (+) A49, A87, A76, A93, A32, A70, A43, A26, A51, A46, A27, A28, A07, A08, A11, A69, A68, A59, A75, A72, A42, A80, A84, A64, A67, A65, A57 
Lower rank Negative (−) A74, A88, A53, A73, A90, A82, A03, A47, A34, A02, A10, A16, A05, A81, A77, A78, A61, A85, A36, A25, A15, A45, A37, A17, A19, A40, A38, A04, A09, A39, A41, A89, A86, A92, A44, A48, A20, A29, A66, A56, A79, A06, A91, A58, A83, A71, A60, A63, A14, A12, A54 
GroupNet outranking flowAlternatives
Upper rank Positive (+) A01, A13, A24, A52, A50, A30, A33, A22, A21, A18, A23, A35, A62, A55, A31 
Middle rank Positive (+) A49, A87, A76, A93, A32, A70, A43, A26, A51, A46, A27, A28, A07, A08, A11, A69, A68, A59, A75, A72, A42, A80, A84, A64, A67, A65, A57 
Lower rank Negative (−) A74, A88, A53, A73, A90, A82, A03, A47, A34, A02, A10, A16, A05, A81, A77, A78, A61, A85, A36, A25, A15, A45, A37, A17, A19, A40, A38, A04, A09, A39, A41, A89, A86, A92, A44, A48, A20, A29, A66, A56, A79, A06, A91, A58, A83, A71, A60, A63, A14, A12, A54 
Table 8

The correlation coefficient of each criteria to the net outranking flow values

GroupCorrelation coefficient
C1C2C3C4C5C6C7C8C9C10C11C12
Upper rank 0.632 0.284 0.363 0.483 0.054 0.325 0.019 0.270 0.291 0.408 0.239 0.615 
Middle rank 0.314 0.396 0.254 0.695 0.147 0.102 0.033 0.007 0.041 0.198 0.236 0.024 
Lower rank 0.145 0.443 0.435 0.420 0.096 0.008 0.150 0.495 0.003 0.398 0.181 0.162 
GroupCorrelation coefficient
C1C2C3C4C5C6C7C8C9C10C11C12
Upper rank 0.632 0.284 0.363 0.483 0.054 0.325 0.019 0.270 0.291 0.408 0.239 0.615 
Middle rank 0.314 0.396 0.254 0.695 0.147 0.102 0.033 0.007 0.041 0.198 0.236 0.024 
Lower rank 0.145 0.443 0.435 0.420 0.096 0.008 0.150 0.495 0.003 0.398 0.181 0.162 

Priority ranking predicted by the outranking approach

This study used PROMETHEE to evaluate the given criteria in the process of determining the investment priorities, the positive outranking flow, , the negative outranking flow, and the net outranking flow as were calculated. The PROMETHEE uses preference indices for pairwise comparison of more than two criteria with given weight. Preference indices determined by Equations (2) and (3) with predetermined weights, preference functions and criteria were all calculated. For predicting priority ranking by the PROMETHEE, entropy weight coefficient method was also used to determine unbiased weight of the criteria. The estimation results of weights for the application of the PROMETHEE show that the residential area ratio (C6) had the highest value of 0.167 and the total damage during the past five years (C3) had 0.108 and both of the waterfront revitalization area (C10) and the establishment of master plan (C12) had 0.105. To determine the preference function of PROMETHEE, the characteristics of each attributes should be considered. The specific property of indicator consists of attributes represented by six types of distribution: Usual, U-shape, V-shape, Discrete, Linear and Gaussian distributions as shown in Table 2. To verify the present approach, the official priority ranking on the flood risk assessment for the SSWRPs from the weighted method are also compared with the values simulated with the PROMETHEE with six preference functions as shown in Figure 3. The predicted ranking of the PROMETHEE with Gaussian preference function (Type VI) clearly predicts the official priority ranking. This is in contrast to the usual preference function (Type I) which seems to overestimate the official priority ranking. The PROMETHEE predictions with four types of preference functions (Types II–V) are also in good agreement with the priority ranking obtained by the weighted method. For comparison between the evaluation criteria and the net outranking flow values estimated by the PROMETHEE with Gaussian preference function, the net outranking flow values of 93 alternates were plotted as shown in Figure 4. The results of priority ranking predicted by the PROMETHEE with Gaussian preference function show that A02 have the highest priority which mean that this stream is urgently needed for small stream watershed restoration followed by A11, A22 and A68, while A59 was the lowest priority as shown in Figure 4.

Figure 3

Comparisons of determined priority ranking based on flood risk assessment with official ranking data used in verification.

Figure 3

Comparisons of determined priority ranking based on flood risk assessment with official ranking data used in verification.

Close modal
Figure 4

The results of the investment priorities, the positive outranking flow, the negative outranking flow and the net outranking flow.

Figure 4

The results of the investment priorities, the positive outranking flow, the negative outranking flow and the net outranking flow.

Close modal

Evaluations of multi criteria decision approaches on the SSWRPs

To evaluate the difference between the official and the predicted values of the flood risk assessment priority ranking more quantitatively, the discrepancy ratio defined by Cheong & Seo (2003) was used as a measure of error
9
in which is the discrepancy ratio, is the predicted value and is the official value. If the discrepancy ratio is 0, the predicted value is identical to the official values. If the discrepancy ratio is larger than 0, the predicted value is overestimated and if the discrepancy ratio is smaller than 0, the predicted value is underestimated Accuracy is defined as the proportion of numbers for which the discrepancy ratio is between − 0.05 and 0.05 for the total number of data. Figure 5 shows the histogram of discrepancy ratios for the proposed method used in the analysis of the 93 official priority ranking set. The discrepancy ratio distributions for the proposed method with Gaussian function presented a range of values between − 0.3 and 0.3. The accuracy of the proposed method with the usual preference function was 35%, with the u-shape preference function as 60%, v-shape preference function as 57%, discrete preference function as 53%, and linear preference function as 61%, while that of the proposed method with the Gaussian preference function at 73%. Overall, the accuracy of the proposed method with the Gaussian preference function was the highest amongst all preference functions tested.
Figure 5

Comparison of discrepancy ratios of the PROMETHEE with six preference functions for official priority ranking used in verification.

Figure 5

Comparison of discrepancy ratios of the PROMETHEE with six preference functions for official priority ranking used in verification.

Close modal

Development of the guideline for selecting the optimum SSWRPs

The small stream restoration projects are facing challenges regarding resources allocation and also selection of optimum measures on how to reduce flooding risk in their watershed areas. Flood risk assessment results defined by priority ranking of the SSWRPs could help decision-makers for planning future disaster risk reduction projects and to design future SSWRPs coping with extreme events such as flash floods and localized heavy rainfall. Efficiency of the priority setting of flood risk assessment could be evaluated by considering the following: (i) whether priority setting has an improved capacity for making decision on the cost- and environment-effective small stream restoration measures; and (ii) whether stakeholders and decision-makers felt that the priority setting process provided the needs of the community on resilient recovering and sustainable development. In this study, the optimal restoration project guideline was developed based on the priority ranking predicted by PROMETHEE with Gaussian preference function for decision-making in which alternates were divided into three ranking groups such as the upper rank, the middle rank and the lower rank as shown in Figure 4. To make a decision on the optimal SSWRPs, the decision-maker can select one management option among prevention or preparedness, sustainable development and resilient recovery by predicting the priority ranking and then determine the optimum restoration measure listed in Table 9. The guideline can be used to rebuild the small streams to be in harmony with the natural environment and to prepare the floodplain to minimize future flood damage and to maximize natural stream habitat. This guideline can also help the government and the community in their decision-making regarding the protection of the sensitive watershed by means of floodplain or restoration of small stream watersheds for reducing flood risk. Reducing the embankment facility-oriented restoration project and increasing the landscape facility restoration project as well as the eco-river facility restoration project are some of the expected outcomes of this guideline.

Table 9

Guideline for the restoration measures for the flood related disaster risk management

GroupUpper rankMiddle rankLower rank
Management Resilient recovering Sustainable development Prevention/preparedness 
Restoration Ecology, community stream City, culture and theme stream Channel and bank restoration 
Measures Purchase of lands for floodplain Establishment of artificial park area Bridge reconstruction 
GroupUpper rankMiddle rankLower rank
Management Resilient recovering Sustainable development Prevention/preparedness 
Restoration Ecology, community stream City, culture and theme stream Channel and bank restoration 
Measures Purchase of lands for floodplain Establishment of artificial park area Bridge reconstruction 

Flood-related disasters on small streams caused by high intensity localized rainfall and flash floods has been continuously increasing, especially in residential areas. Recent survey results showed that the SSWRPs, as one of the disaster risk reduction measures, could contribute to reduce flood-related damage in small streams. However, the existing restoration plans did not develop good responses in terms of extreme disasters and current social and environment changes due to geographical and physical features of stream channels like flooding, sediment transport or urban development. Furthermore, the SSWRPs were facing significant resource allocation challenges as well as problems for the selection of optimum measures for flood risk reduction considering community needs such as prevention or preparedness, sustainable development, resilient recovery and available resources. Flood risk assessment results defined by priority ranking can be used for decision-making to allocate resources and select optimum community based restoration measures. The 12 representative factors for the flood risk assessment are carefully selected and constructed for the three main aspects under the P-S-R classification system for identifying the 212 small stream watershed. The entropy weight coefficient method is also applied to calculate the weight of flood risk factors in order to reduce subjective judgments on the effects of the weight coefficients. The weighted method was used to predict the official priority ranking based on the flood risk assessment of 93 SSWRPs and the PROMETHEE with six preference functions was used here to validate predicted results with official values. To evaluate the practical application of the PROMETHEE for identifying the flood prone area, the results with six preference functions are compared with official priority ranking predicted by weighted method. The predicted priority ranking from the PROMETHEE with Gaussian preference function clearly predicts quite well the official priority ranking while the usual preference function overestimates the official values. The accuracy of the proposed method with the Gaussian preference function is the highest amongst all preference functions tested. Also the optimal restoration guideline for decision-making such as prevention or preparedness, sustainable development and resilient recovering has been suggested by the determined three priority ranking groups. The guideline can be used to rebuild the small streams to be in harmony with the natural environment and to establish the floodplain to minimize future flood damage and to maximize natural stream habitat. It is expected that the flood risk assessment ranking ensured by full verification can support the optimal regional rehabilitation plans against flooding disasters with respect to the causes and characteristics of past floods. The procedures in this study can be used to establish evaluation criteria considering the weights in the decision-making process for similar projects using various alternates in small stream watershed restoration.

Akter
T.
Simonovic
S. P.
2002
A general overview of multiobjective multiple-participant decision making for flood management
.
Water Resour. Res. Report No.
041
,
65
.
Bannerman
R. T.
Owens
D. W.
Dodds
R. B.
Hornewer
N. J.
1993
Sources of pollution in Wisconsin stormwater
.
Water Sci. Technol.
28
,
241
259
.
Beechie
T. J.
Pess
G.
Kennard
P.
Bilby
R. E.
Bolton
S.
2000
Modeling recovery rates and pathways for woody debris recruitment in northwestern Washington streams
.
North Am. J. Fish. Manage.
20
,
436
452
.
Brans
J. P.
Mareschal
B.
2005
PROMETHEE methods
. In:
Multiple Criteria Decision Analysis
(
Figueira
J. R.
Greco
S.
Ehrgott
M.
, eds).
State of the Art Surveys, Chapter 5
.
Springer
,
New York
,
163
195
.
Bruen
M.
2002
Multiple criteria and decision support systems in water resources planning and river basin management
.
Proceedings of Irish National Hydrology Seminar. Irish National Committees
,
Tullamore
, pp.
25
35
.
Cetinkaya
C. P.
Fistikoglu
O.
Harmancioglu
N. B.
Fedra
K.
2007
Optimization methods applied for sustainable management of water-scarce basins
.
J. Hydroinform.
10
(
1
),
69
95
.
Cheong
E. S.
2011
Ranking abnormality occurs by using the AHP techniques
.
J. Korea Water Resour. Assoc.
44
(
10
),
72
79
.
Cheong
T. S.
Seo
I. W.
2003
Parameter estimation of transient storage model by routing for river mixing
.
Water Resour. Res.
39
(
4
),
HWC 1
HWC 11
.
Cheong
T. S.
Kang
B.
Jeong
S.
2011
Study on guideline for the selection of small stream implementation projects
.
J. Korean Soc. Haz. Mitig.
11
(
2
),
163
170
.
Choi
H. I.
Park
S. Y.
Song
J. H.
Park
M. J.
2013
Identification of flood risk areas using a multi-criteria decision making method
.
J. Korean Soc. Haz. Mitig.
13
(
2
),
237
243
.
Choi
S.
2009
Method to Evaluate Inundation Risk Using Multi Criteria Decision Making
.
MS Thesis
,
Hanseo University
.
Coles
J. F.
McMahon
G.
Bell
A. H.
Brown
L. R.
Fitzpatrick
F. A.
Eikenberry
B. C.
Woodside
M. D.
Cuffney
T. F.
Bryant
W. L.
Cappiella
K.
Fraley-McNeal
L.
Stack
W. P.
2012
Effects of urban development on stream ecosystems in nine metropolitan study areas across the United States. Circular 1373
.
U.S. Geological Survey
.
Collins
E.
Simpson
L.
2007
The Impact of Climate Change on Insuring Flood Risk
.
Institute of Actuaries of Australia
,
New Zealand
, pp.
1
38
.
Gibson
J. L.
Martin
D. K.
Singer
P. A.
2004
Setting priorities in health care organizations: criteria, processes, and parameters of success
.
BMC Health Serv. Res.
4
(
25
),
1
8
.
Han River Flood Control Office
2008
Hydrological Annual Report in Korea
.
Han River Flood Control Office, MLTM
.
Hong
S. J.
Lee
Y. D.
Kim
S. K.
Kim
J. H.
2006
Evaluation of risk factors to detect anomaly in water supply networks – based on the PROMETHEE and ANP
.
J. Korea Water Resour. Assoc.
39
(
1
),
35
46
.
Hyde
K. M.
Maier
H. R.
Colby
C. B.
2004
Reliability-based approach to multicriteria decision analysis for water resources
.
J. Water Resour. Plan. Manage.
130
(
6
),
429
438
.
Jandric
Z.
Srdjevic
B.
2000
Analytic hierarchy process in selecting best groundwater pond
.
31st International Geological Congress
.
Rio de Janeiro, Brazil
, pp.
1
9
.
Jason
K. L.
Hartmann
J.
Li
K. W.
An
Y.
Asgary
A.
2007
Multi-criteria decision support systems for flood hazard mitigation and emergency response in urban watersheds
.
J. Am. Water Resour. Assoc.
43
(
2
),
346
358
.
Kang
M. G.
Kim
W. G.
2006
Use of index and indicator for assessment on water resources and environment in a watershed
.
Water Future
39
(
3
),
37
48
.
Khelifi
O.
Lodolo
A.
Vranes
S.
Centi
G.
Miertus
S.
2006
A web-based decision support tool for groundwater remediation technologies selection
.
J. Hydroinform.
8
,
91
100
.
Kim
C.
2001
A Study on the Decision-making for Drought Management using the Drought Indices
.
MS Thesis
,
Inha University
,
South Korea
.
Kim
G.
Lee
C.
Yeo
G.
Shim
M.
2009
Priority decision of small hydropower development using spatial multi-criteria decision making
.
J. Korea Water Resour. Assoc.
42
(
12
),
1029
1038
.
Kim
G. H.
Sun
S. P.
Yeo
K. D.
Kim
H. S.
2012
Determination of investment priority for river improvement project at downstream of dams using PROMETHEE
.
J. Korea Water Resour. Assoc.
32
(
1B
),
41
51
.
Kim
W.
2006
Determination of Investment Priority for Dams Projects using Multi Criteria Decision Methods
.
Ph.D. Theses
,
Chungnam National University
,
South Korea
.
Klein
R. D.
1979
Urbanization and stream impairment. Water Resources Bulletin
.
Am. Water Resour. Assoc.
15
,
948
963
.
Ko
S. K.
Kee
K. M.
Ko
I. H.
1992
Comparative evaluation of multipurpose reservoir operating rules using multicriterion decision analysis techniques
.
J. Korea Water Resour. Assoc.
25
(
1
),
83
92
.
Korea Water Resources Corporation
2002
A Study on Water Rights Adjustments through the Existing Dam Reasonable Water Allocation
.
Korea Water Resources Corporation
,
Daejeon, South Korea
.
Lee
J. H.
Jun
H. D.
Park
M. J.
Jung
J. H.
2011
Flash flood risk assessment using PROMETHEE and Entropy method
.
J. Korean Soc. Haz. Mitig.
11
(
3
),
151
156
.
Lim
K. S.
Choi
S. J.
Lee
D. R.
Moon
J. W.
2010
Development of flood risk index using casual relationships of flood indicators
.
J. Korean Soc. of Civ. Eng.
30
(
1B
),
61
70
.
Maragoudaki
R.
Tsakiris
G.
2005
Flood mitigation planning using PROMETHEE
.
Eur. Water
9
(
10
),
51
58
.
Min
W.
2009
Decision on Priority of Controlling Non-Point Source Pollution in Upper Stream of Soyang Lake by Using Multicriteria Decision Making Techniques
.
MS Thesis
,
Seoul National University
.
MLTM
1999
Phase Three Basic Plan Report on Prone Area Improvement Project
.
Ministry of Land, Transport and Marin Affairs, MLTM
.
MLTM
2005
Phase Four Basic Plan Report on Prone Area Improvement Project
.
Ministry of Land, Transport and Marin Affairs, MLTM
.
Nam
D. S.
2007
Selection of Flood Control Capability Increase Alternative for Multi-Purpose Reservoir using Multi-Criteria Decision Analysis
.
MS Thesis
,
Ajou University
,
South Korea
.
Park
S. Y.
Kim
J. H.
Kim
S. K.
2005
A mixed-integer programming model to draw the concordance level and the kernel set for the implementation of ELECTRE IS
.
J. Korean Inst. Indust. Eng.
31
(
4
),
265
276
.
Park
T. S.
2002
The evaluation perspective of stream weight in AHP
.
J. Korea Water Resour. Assoc.
35
(
6
),
685
692
.
Pess
G.
Morley
S.
Roni
P.
2005
Evaluating fish response to culver replacement and other methods for reconnecting isolated aquatic habitats
. In:
Methods for Monitoring Stream and Watershed Restoration
(
Roni
P.
, ed.).
American Fisheries Society
,
Bethesda, Maryland
, pp.
267
276
.
Podvezko
V.
Podviezko
A.
2009
PROMETHEE I method application for identification of the best alternative
.
Business Theory Pract.
10
(
2
),
84
92
.
Raju
K. S.
Ducjstein
L.
Arondel
C.
2000
Multicriterion analysis for sustainable water resources planning: A case study in Spain
.
Water Resour. Manage.
14
(
6
),
435
456
.
Ridgley
M. A.
1992
Selection of water-supply projects under drought
.
J. Environ. Syst.
21
(
3
),
207
221
.
Ridgley
M. A.
1993
A multicriteria approach to allocating water during drought
.
Resour. Manage. Optim.
9
(
2
),
135
149
.
Roni
P.
Beechie
T. J.
Bilby
R. E.
Leonetti
F. E.
Pollock
M. M.
Pess
G. P.
2002
A review of stream restoration techniques and a hierarchical strategy for prioritizing restoration in Pacific Northwest watersheds
.
North Am. J. Fish. Manage.
22
,
1
20
.
Shafike
N. G.
Duckstein
L.
Maddock
T.
1992
Multicriterion analysis of groundwater contamination management
.
Water Resour. Bull.
28
(
1
),
33
42
.
Udías
A.
Galbiati
L.
Elorza
F. J.
Efremov
R.
Pons
J.
Borras
G.
2011
Framework for multi-criteria decision management in watershed restoration
.
J. Hydroinform.
14
(
2
),
395
411
.