Abstract
In this paper, one of the newest meta-heuristic algorithms, named artificial bee colony (ABC) algorithm, is used to solve the single-reservoir operation optimization problem. The simple and hydropower reservoir operation optimization problems of Dez reservoir, in southern Iran, have been solved here over 60, 240, and 480 monthly operation time periods considering two different decision variables. In addition, to improve the performance of this algorithm, two improved artificial bee colony algorithms have been proposed and these problems have been solved using them. Furthermore, in order to improve the performance of proposed algorithms to solve large-scale problems, two constrained versions of these algorithms have been proposed, in which in these algorithms the problem constraints have been explicitly satisfied. Comparison of the results shows that using the proposed algorithm leads to better results with low computational costs in comparison with other available methods such as genetic algorithm (GA), standard and improved particle swarm optimization (IPSO) algorithm, honey-bees mating optimization (HBMO) algorithm, ant colony optimization algorithm (ACOA), and gravitational search algorithm (GSA). Therefore, the proposed algorithms are capable algorithms to solve large reservoir operation optimization problems.
INTRODUCTION
Nowadays, due to increasing population and available water resources limitations, humans should attend to optimal use of various water resources. In general, surface and groundwater are the main water resources. In order to use these resources, different structures should be constructed. Water flows in rivers are the most important part of surface water resources and therefore dams can be constructed to store them (Winter et al. 1998).
Due to the above, in recent decades, finding the optimal operation of reservoirs has been of more interest for water resources researchers. However, finding an optimal solution for the reservoir operation optimization problem is not an easy task and, therefore, various optimization methods have been proposed for this problem. Generally, these methods are classified as linear programming (LP), non-linear programming (NLP), dynamic programming (DP), meta-heuristic algorithms (or evolutionary algorithms), and hybrid methods. Each of these methods has its own advantages and disadvantages (Moeini & Afshar 2009).
Nowadays, meta-heuristics algorithms are significantly used to solve optimization problems in which they have been proposed based on the natural behavior of organisms and real phenomenon (Ketabchi & Ataie-Ashtiani 2015a). These algorithms have some important advantages, such as no need for continuity, derivability, convexity of objective function and constraints. In addition, intelligent foraging behavior of these algorithms prevents the model from trapping in optimal local points. Owing to these capabilities, meta-heuristic algorithms have been greatly used to solve reservoir optimization problems for 40 years. Hossain & El-Shafie (2013), Ahmad et al. (2014), and Ketabchi & Ataie-Ashtiani (2015b) reviewed the capability of different meta-heuristic algorithms which are used to solve this optimization problem. In addition, many effective, improved and modified forms of these algorithms have been also proposed by many researchers. For example, different evolutionary and meta-heuristic algorithms such as genetic algorithm (GA), evolution strategy, ant colony optimization algorithm (ACOA), honey-bee mating optimization (HBMO) algorithm, elitist-mutated particle swarm optimization (EMPSO), shuffled frog leaping (SFL) algorithm, interactive multi-class algorithm, arc based constrained ant colony optimization algorithm (ABCACOA), particle swarm optimization (PSO) algorithm, harmony search (HS) algorithm, cuckoo search genetic algorithm (CSGA), and gravitational search algorithm (GSA) have been proposed and used for solving this problem, in which the details are presented in Table 1.
Methods . | Authors (year) . |
---|---|
GA | Esat & Hall (1994), Rani & Moreira (2010), Chang et al. (2010), Hınçal et al. (2011), Liu et al. (2011), Zhang et al. (2013) |
Evolution strategy | Runarsson & Yao (2005) |
ACOA | Jalali (2005), Kumar & Reddy (2006), Jalali et al. (2007), Afshar & Moeini (2008), Madadgar & Afshar (2009), Afshar (2012, 2013), Moeini & Afshar (2013) |
HBMO | Afshar et al. (2007), Bozorg-Haddad et al. (2008) |
EMPSO | Kumar & Reddy (2007) |
CSGA | Yasar (2016) |
SFL | Li et al. (2010) |
Interactive multi-class | Wang et al. (2011) |
ABCACOA | Moeini & Afshar (2011) |
HS | Bashiri-Atrabi et al. (2015) |
PSO | Zhang et al. (2011), Moeini & Babaei (2017) |
GSA | Moeini et al. (2017) |
Methods . | Authors (year) . |
---|---|
GA | Esat & Hall (1994), Rani & Moreira (2010), Chang et al. (2010), Hınçal et al. (2011), Liu et al. (2011), Zhang et al. (2013) |
Evolution strategy | Runarsson & Yao (2005) |
ACOA | Jalali (2005), Kumar & Reddy (2006), Jalali et al. (2007), Afshar & Moeini (2008), Madadgar & Afshar (2009), Afshar (2012, 2013), Moeini & Afshar (2013) |
HBMO | Afshar et al. (2007), Bozorg-Haddad et al. (2008) |
EMPSO | Kumar & Reddy (2007) |
CSGA | Yasar (2016) |
SFL | Li et al. (2010) |
Interactive multi-class | Wang et al. (2011) |
ABCACOA | Moeini & Afshar (2011) |
HS | Bashiri-Atrabi et al. (2015) |
PSO | Zhang et al. (2011), Moeini & Babaei (2017) |
GSA | Moeini et al. (2017) |
Reviewing the research literature shows the capabilities of meta-heuristic algorithms for solving reservoir operation optimization problems. Therefore, proposing a new meta-heuristic algorithm or improving and modifying the original form of meta-heuristic algorithm is an attractive research field for engineers. One of the new proposed meta-heuristic algorithms is artificial bee colony (ABC) algorithm, which was first proposed by Karaboga & Basturk (2007) and used to solve different engineering optimization problems. It is worth noting that the ABC algorithm is based on the natural behavior of a honey-bee colony which cooperates for food foraging. Akay & Karaboga (2010) proposed a modified ABC algorithm for parameter optimization problems and compared the performance of standard and modified versions of the ABC algorithm with other available algorithms. The results showed that the standard ABC algorithm was more effective to solve basic functions but using the modified ABC algorithm led to a better solution for combined functions. Sadhan & Subir (2012) used the ABC algorithm to optimize a dynamic power flow model for a pump reservoir system including stationary generator, wind speed, and hydropower reservoir. The obtained result showed better performance of the ABC algorithm in comparison with the GA and PSO algorithms with higher convergence rate. Sayyafzadeh et al. (2013) studied the reservoir operation optimization problem using the ABC algorithm and compared the results with the GA. Hossain & EI-shafie (2014a) solved the reservoir operation optimization using PSO, ABC, and GA. The results showed that the ABC algorithm was more appropriate for supplying water demand and management of water scarcity. Finally, Hossain & EI-shafie (2014b) determined the optimal policy of reservoir using the ABC algorithm and showed that the obtained policy could supply 98% of demands in the entire period of time.
Current research aims to assess and improve the capabilities of the ABC algorithm to solve the reservoir operation optimization problem. Here, two improved artificial bee colony algorithms (IABC) are proposed in order to increase the capabilities of ABC algorithm, in which they are denoted by suffix 1 and 2, IABC1 and IABC2, respectively. In addition, the characteristics of the proposed IABCs are used here to propose a constrained version of IABC applying the concept already used for other meta-heuristic algorithms (Afshar & Moeini 2008; Afshar 2012; Moeini et al. 2017; Moeini & Babaei 2017). Here, two constrained versions of IABC are proposed which are named partially and fully IABC, PCIABC and FCIABC, algorithms. In the PCIABC algorithm, local operation policies are created such that the continuity equation and the water release and storage volume constraints are satisfied simultaneously. However, in the FCIABC algorithm, the storage volume bounds are modified prior to the main search. It should be noted that in both constrained versions of IABC, only feasible operation of the reservoir is constructed. In other words, in the constrained algorithm, the feasible search space is constructed by recognizing infeasible components and excluding them from the search space. This proposed mechanism is very useful to solve large-scale optimization problems, in which it leads to smaller search space size. By considering water releases or storage volumes at each operation time period as a decision variable of the problem, two formulations are proposed here for each proposed algorithm, in which they are denoted by subscript R and S, respectively. Here, the simple and hydropower operation problems of Dez reservoir in Iran over 60, 240, and 480 monthly operation time periods are solved using the proposed algorithms and the results are presented and compared with other available results. The superior performance of the proposed algorithms is presented and highlighted in the section ‘Results and discussion’.
METHODOLOGY
In this paper, the improved version of the ABC algorithm named IABC has been proposed to solve the reservoir operation optimization problem which is based on the original form of ABC algorithm. Therefore, in this section, first the standard form of ABC algorithm and then the IABC algorithm are presented.
Artificial bee colony (ABC) algorithm
ABC algorithm can be considered as one of the newest meta-heuristic algorithms due to the fact that it was proposed based on the natural behavior of real bees. However, this algorithm can also be considered as one of the evolutionary algorithms due to the fact that it generates a random initial population of possible solutions and improves it iteratively through evolutionary-type processes. This algorithm was proposed first by Karaboga & Basturk (2007). The algorithm is based on the natural behavior of a group of bees to find food together and it was modeled as an artificial system. In this algorithm, three categories of employed, onlooker, and scout bees are defined. In the ABC algorithm, employed bees are defined as moving to different food sources and gathering information, including amount of nectar, direction, and distance to the hive, so play a role in the cycle of bees searching for food. When employed bees return to the hive, they share information with other bees. This mechanism leads onlooker bees to find food sources which are more likely to have nectar. When these bees gather information, spectator bees move to the food sources that are more likely to have existent nectar. Finally, the scout bees task is started, in which, regardless of other bees’ information, the random search of food sources is done by these bees so that the bees do not miss a good food source (Karaboga & Basturk 2007).
In order to simulate the performance of bees in nature, in the ABC algorithm different parameters are defined. It is worth noting that in this algorithm, the numbers of defined parameters are less than other meta-heuristic algorithms. This fact is one of the main advantages of this algorithm. These parameters include the bees’ numbers (BN), the food sources’ numbers (SN), the number of repetitions (MCN), amount of variables that vary to produce new answer (Ndim), and the allowed number of failure of a source (Limit). This algorithm was fully described by Karaboga & Basturk (2007) and therefore it is not completely presented here. However, a brief description of this algorithm is presented as follows.
The three basic steps of finding the optimal solution process using the ABC algorithm are presented as follows:
- 1.
Sending the employed bees to food sources and determining their nectar.
- 2.
Choosing food resources by the onlooker bees. Then, sharing information with employed bees. Finally, determining the amount of nectar of food resources.
- 3.
Sending a scout bee to possible food sources.
Improved artificial bee colony (IABC) algorithm
It is worth nothing that the specific advantage of the proposed IABC algorithm in comparison with standard ABC is as follows. In the IABC algorithm, better interaction between the concept of exploration and exploitation is done using proposed approaches. It should be noted that exploration is the ability of the algorithm to extensively explore the space search of the problem. However, the exploitation is the ability of the algorithm to explore around the neighborhoods of local solutions. In other words, the previously obtained solutions are used to find the optimal solution. Although these concepts conflict with each other, effective interaction between these two concepts is one of the main challenges to provide new meta-heuristic algorithms. Here, by proposing two IABC algorithms this interaction is well established. The superior performance of the proposed IABC algorithms to solve optimization problems will be shown when they are used to solve benchmark test examples.
RESERVOIR OPERATION OPTIMIZATION PROBLEM
In this paper, the reservoir operation optimization problems for water supply and hydropower generation are solved using the proposed algorithms. The mathematical formulations of these problems are presented as follows. The mathematical formulation should be presented by defining decision variables, objective function and constraints.
Reservoir operation for water supply
Reservoir operation for hydropower generation
CONSTRAINED IMPROVED ARTIFICIAL BEE COLONY (CIABC) ALGORITHM
Some problems such as reservoir operation optimization problem are naturally sequential and therefore the trial solution can be incrementally constructed using a component by component approach. This approach is very useful for solving a large-scale reservoir operation optimization problem in which some of the problem constraints can be explicitly satisfied and therefore the search space size of the problem can be extremely reduced. This approach leads to better solutions and improves the convergence characteristics of the algorithm. Therefore, two constrained versions of IABC algorithms, named PCIABC and FCIABC, are proposed here based on this approach.
Generally, water releases or storage volumes at each operation time period can be considered as decision variables of the reservoir operation optimization problem. In this paper, two formulations are proposed for each proposed algorithm, considering water releases or storage volumes at each operation time period as decision variables of the problem, in which they are denoted by subscript R and S, respectively. It should be noted that each solution j from food source i, presents with a vector of decision variables where d (d = 1, L, D) is the number of decision variables (problem dimension). Here, the operation time periods define the dimensions of the problem solution (D=NT) in which the dimensions are treated in a sequence defined by the operation time periods. Furthermore, the storage volume at the beginning of the first operation time period is assumed to be pre-defined. A brief description of the proposed algorithms is presented as follows.
Partially constrained improved artificial bee colony (PCIABC) algorithm
Here, two partially constrained improved artificial bee colony (PCIABC) algorithms are proposed denoted by suffix 1 and 2 and therefore they are named PCIABC1 and PCIABC2.
It should be noted that using Equation (18), the resulting solutions are feasible.
Fully constrained improved artificial bee colony (FCIABC) algorithm
Sometimes, a condition might occur in the PCIABC algorithm that some of the solutions are infeasible. This condition generally depends on the magnitude of the inflow at any operation time period. In this condition, the new calculated bounds, Equation (14) or (17), are above or below the original bounds and therefore an empty allowable range is obtained (using Equations (15) and (18)). Here, this problem is resolved by proposing another algorithm, named fully constrained improved artificial bee colony (FCIABC) algorithm. Two FCIABC algorithms are proposed here denoted by suffix 1 and 2 and therefore they are named FCIABC1 and FCIABC2. In addition, two formulations are proposed for each FCIABC algorithm, named FCIABC1R (FCIABC2R) and FCIABC1S (FCIABC2S), considering water release or storage volume at each operation time period as decision variables of the problem, respectively.
These new calculated bounds are used by the PCIABC algorithm leading to an algorithm named FCIABC, in which no infeasible solutions will be created during the search process.
CASE STUDY
RESULTS AND DISCUSSION
In order to solve these optimization problems, at first, a set of preliminary runs should be done to find the proper values of the proposed algorithms’ parameters. Proper values of these parameters are presented in Table 2. A maximum number of 1,000 iterations and 100 populations amounting to 100,000 function evaluations for each run are used here to solve these problems. Tables 3 and 4 are presented to show the maximum, minimum, and average cost values, the scaled standard deviation of the solutions, and the number of feasible runs obtained in 10 runs for the simple and hydropower operation of Dez reservoir, respectively, over 60, 240, and 480 monthly operation time periods using all the proposed algorithms. Comparison of the results shows that all qualities of the solution are increased when the improved version of ABC is used to solve these problems, in which the quality of the solution of the second improved version is better than the first one due to the fact that effective interaction between exploration and exploitation concepts occurs by using the proposed improved versions. In addition, both fully and partially constrained versions of the proposed algorithms have the ability to produce better results in comparison with the original standard form of the proposed algorithms; the results of the fully constrained version are significantly better due to the fact that using the proposed mechanism leads to smaller search space size for the problem, especially for longer 480 monthly operation time periods.
Operation time periods (month) . | Formulation . | Limit . | Ndim . | Percentage of employed bees . | A . | G . | R . |
---|---|---|---|---|---|---|---|
60 | I | 120 | 6 | 0.8 | 0.001 | 1 | 1 |
II | 6,000 | 1 | 0.67 | 0.001 | 1 | 1 | |
240 | I | 6,000 | 4 | 0.8 | 0.00001 | 1 | 1 |
II | 6,000 | 4 | 0.8 | 0.00001 | 1 | 1 | |
480 | I | 6,000 | 4 | 0.67 | 0.00001 | 1 | 1 |
II | 110 | 2 | 0.8 | 0.00001 | 1 | 1 |
Operation time periods (month) . | Formulation . | Limit . | Ndim . | Percentage of employed bees . | A . | G . | R . |
---|---|---|---|---|---|---|---|
60 | I | 120 | 6 | 0.8 | 0.001 | 1 | 1 |
II | 6,000 | 1 | 0.67 | 0.001 | 1 | 1 | |
240 | I | 6,000 | 4 | 0.8 | 0.00001 | 1 | 1 |
II | 6,000 | 4 | 0.8 | 0.00001 | 1 | 1 | |
480 | I | 6,000 | 4 | 0.67 | 0.00001 | 1 | 1 |
II | 110 | 2 | 0.8 | 0.00001 | 1 | 1 |
Algorithm (operation time period) . | Minimum . | Maximum . | Average . | Standard deviation . | Number of feasible solutions . |
---|---|---|---|---|---|
ABCR (60) | 1.049 | 1.1864 | 1.11886 | 0.040811 | 10 |
ABCS (60) | 0.86262 | 1.0735 | 0.950023 | 0.085447 | 10 |
ABCR (240) | 29.4198 | 1,247.776 | 167.5886 | 2.270481 | 8 |
ABCS (240) | 11.5443 | 16.9025 | 14.3858 | 0.132041 | 6 |
ABCR (480) | 3,685.781 | 6,47.194 | 5,199.72 | 0.200693 | – |
ABCS (480) | 59.7352 | 669.2162 | 293.2189 | 0.827879 | – |
IABC1R (60) | 0.91804 | 1.1588 | 1.027592 | 0.086565 | 10 |
IABC1S (60) | 0.82758 | 0.98054 | 0.89556 | 0.046508 | 10 |
IABC1R (240) | 27.3537 | 870.3015 | 116.5645 | 2.272028 | 9 |
IABC1S (240) | 10.1057 | 13.8914 | 11.91257 | 0.106541 | 7 |
IABC1R (480) | 1,237.615 | 4,549.996 | 2,993.546 | 0.361448 | – |
IABC1S (480) | 68.3634 | 251.9125 | 636.2861 | 0.712515 | 4 |
IABC2R (60) | 0.8723 | 1.1103 | 1.040184 | 0.073236 | 10 |
IABC2S (60) | 0.82888 | 0.97369 | 0.897984 | 0.053131 | 10 |
IABC2R (240) | 24.029 | 50.6253 | 34.3812 | 0.26071 | 8 |
IABC2S (240) | 9.7527 | 11.8684 | 10.68809 | 0.071266 | 8 |
IABC2R (480) | 1,237.592 | 4,549.945 | 2,971.977 | 0.371165 | – |
IABC2S (480) | 50.689 | 297.6383 | 102.6883 | 0.755918 | 5 |
PCABCR (60) | 0.87464 | 1.1418 | 1.005303 | 0.098996 | 10 |
PCABCS (60) | 0.83042 | 0.91752 | 0.86251 | 0.036191 | 10 |
PCABCR (240) | 10.653 | 13.0897 | 12.06441 | 0.074897 | 10 |
PCABCS (240) | 7.7916 | 9.2908 | 8.43671 | 0.053071 | 10 |
PCABCR (480) | 36.1205 | 52.1871 | 41.9684 | 0.136512 | 10 |
PCABCS (480) | 18.6388 | 21.2698 | 19.70712 | 0.045879 | 10 |
PCIABC1R (60) | 0.87063 | 1.071 | 0.953022 | 0.05323 | 10 |
PCIABC1S (60) | 0.80783 | 0.90785 | 0.866042 | 0.039072 | 10 |
PCIABC1R (240) | 10.1023 | 11.7898 | 11.19185 | 0.051275 | 10 |
PCIABC1S (240) | 7.4704 | 9.1638 | 8.3209 | 0.06928 | 10 |
PCIABC1R (480) | 35.097 | 41.1112 | 36.54984 | 0.047703 | 10 |
PCIABC1S (480) | 17.9201 | 19.5474 | 18.89014 | 0.03003 | 10 |
PCIABC2R (60) | 0.83087 | 0.90349 | 0.861378 | 0.040868 | 10 |
PCIABC2S (60) | 0.80726 | 0.97369 | 0.897984 | 0.042373 | 10 |
PCIABC2R (240) | 9.9851 | 12.1366 | 11.08865 | 0.062614 | 10 |
PCIABC2S (240) | 7.1631 | 9.091 | 8.1313 | 0.090821 | 10 |
PCIABC2R (480) | 34.9191 | 39.67999 | 37.65551 | 0.051027 | 10 |
PCIABC2S (480) | 17.9201 | 19.9127 | 18.8688 | 0.036662 | 10 |
FCABCR (60) | 0.74027 | 1.049 | 0.880873 | 0.105388 | 10 |
FCABCS (60) | 0.79309 | 1.0683 | 0.949524 | 0.101065 | 10 |
FCABCR (240) | 10.0326 | 12.8257 | 12.7806 | 0.078072 | 10 |
FCABCS (240) | 7.4924 | 8.4241 | 8.10631 | 0.035398 | 10 |
FCABCR (480) | 32.994 | 39.0395 | 36.56369 | 0.050851 | 10 |
FCABCS (480) | 18.1941 | 19.8948 | 19.02434 | 0.026817 | 10 |
FCIABC1R (60) | 0.73838 | 1.017 | 0.928392 | 0.102393 | 10 |
FCIABC1S (60) | 0.76829 | 0.86858 | 0.817643 | 0.03925 | 10 |
FCIABC1R (240) | 9.9898 | 12.769 | 11.48224 | .084602 | 10 |
FCIABC1S (240) | 7.2471 | 8.2881 | 7.86143 | 0.035911 | 10 |
FCIABC1R (480) | 31.3308 | 38.2045 | 35.74124 | 0.060099 | 10 |
FCIABC1S (480) | 17.9179 | 20.28247 | 19.28269 | 0.041335 | 10 |
FCIABC2R (60) | 0.72759 | 1.0408 | 0.8666424 | 0.115566 | 10 |
FCIABC2S (60) | 0.76349 | 0.88014 | 0.822284 | 0.048232 | 10 |
FCIABC2R (240) | 9.8091 | 12.0552 | 11.16271 | 0.070444 | 10 |
FCIABC2S (240) | 7.1107 | 8.3556 | 7.77864 | 0.061344 | 10 |
FCIABC2R (480) | 30.1656 | 37.0888 | 33.80038 | 0.083557 | 10 |
FCIABC2S (480) | 16.9104 | 19.7904 | 18.91875 | 0.043669 | 10 |
Algorithm (operation time period) . | Minimum . | Maximum . | Average . | Standard deviation . | Number of feasible solutions . |
---|---|---|---|---|---|
ABCR (60) | 1.049 | 1.1864 | 1.11886 | 0.040811 | 10 |
ABCS (60) | 0.86262 | 1.0735 | 0.950023 | 0.085447 | 10 |
ABCR (240) | 29.4198 | 1,247.776 | 167.5886 | 2.270481 | 8 |
ABCS (240) | 11.5443 | 16.9025 | 14.3858 | 0.132041 | 6 |
ABCR (480) | 3,685.781 | 6,47.194 | 5,199.72 | 0.200693 | – |
ABCS (480) | 59.7352 | 669.2162 | 293.2189 | 0.827879 | – |
IABC1R (60) | 0.91804 | 1.1588 | 1.027592 | 0.086565 | 10 |
IABC1S (60) | 0.82758 | 0.98054 | 0.89556 | 0.046508 | 10 |
IABC1R (240) | 27.3537 | 870.3015 | 116.5645 | 2.272028 | 9 |
IABC1S (240) | 10.1057 | 13.8914 | 11.91257 | 0.106541 | 7 |
IABC1R (480) | 1,237.615 | 4,549.996 | 2,993.546 | 0.361448 | – |
IABC1S (480) | 68.3634 | 251.9125 | 636.2861 | 0.712515 | 4 |
IABC2R (60) | 0.8723 | 1.1103 | 1.040184 | 0.073236 | 10 |
IABC2S (60) | 0.82888 | 0.97369 | 0.897984 | 0.053131 | 10 |
IABC2R (240) | 24.029 | 50.6253 | 34.3812 | 0.26071 | 8 |
IABC2S (240) | 9.7527 | 11.8684 | 10.68809 | 0.071266 | 8 |
IABC2R (480) | 1,237.592 | 4,549.945 | 2,971.977 | 0.371165 | – |
IABC2S (480) | 50.689 | 297.6383 | 102.6883 | 0.755918 | 5 |
PCABCR (60) | 0.87464 | 1.1418 | 1.005303 | 0.098996 | 10 |
PCABCS (60) | 0.83042 | 0.91752 | 0.86251 | 0.036191 | 10 |
PCABCR (240) | 10.653 | 13.0897 | 12.06441 | 0.074897 | 10 |
PCABCS (240) | 7.7916 | 9.2908 | 8.43671 | 0.053071 | 10 |
PCABCR (480) | 36.1205 | 52.1871 | 41.9684 | 0.136512 | 10 |
PCABCS (480) | 18.6388 | 21.2698 | 19.70712 | 0.045879 | 10 |
PCIABC1R (60) | 0.87063 | 1.071 | 0.953022 | 0.05323 | 10 |
PCIABC1S (60) | 0.80783 | 0.90785 | 0.866042 | 0.039072 | 10 |
PCIABC1R (240) | 10.1023 | 11.7898 | 11.19185 | 0.051275 | 10 |
PCIABC1S (240) | 7.4704 | 9.1638 | 8.3209 | 0.06928 | 10 |
PCIABC1R (480) | 35.097 | 41.1112 | 36.54984 | 0.047703 | 10 |
PCIABC1S (480) | 17.9201 | 19.5474 | 18.89014 | 0.03003 | 10 |
PCIABC2R (60) | 0.83087 | 0.90349 | 0.861378 | 0.040868 | 10 |
PCIABC2S (60) | 0.80726 | 0.97369 | 0.897984 | 0.042373 | 10 |
PCIABC2R (240) | 9.9851 | 12.1366 | 11.08865 | 0.062614 | 10 |
PCIABC2S (240) | 7.1631 | 9.091 | 8.1313 | 0.090821 | 10 |
PCIABC2R (480) | 34.9191 | 39.67999 | 37.65551 | 0.051027 | 10 |
PCIABC2S (480) | 17.9201 | 19.9127 | 18.8688 | 0.036662 | 10 |
FCABCR (60) | 0.74027 | 1.049 | 0.880873 | 0.105388 | 10 |
FCABCS (60) | 0.79309 | 1.0683 | 0.949524 | 0.101065 | 10 |
FCABCR (240) | 10.0326 | 12.8257 | 12.7806 | 0.078072 | 10 |
FCABCS (240) | 7.4924 | 8.4241 | 8.10631 | 0.035398 | 10 |
FCABCR (480) | 32.994 | 39.0395 | 36.56369 | 0.050851 | 10 |
FCABCS (480) | 18.1941 | 19.8948 | 19.02434 | 0.026817 | 10 |
FCIABC1R (60) | 0.73838 | 1.017 | 0.928392 | 0.102393 | 10 |
FCIABC1S (60) | 0.76829 | 0.86858 | 0.817643 | 0.03925 | 10 |
FCIABC1R (240) | 9.9898 | 12.769 | 11.48224 | .084602 | 10 |
FCIABC1S (240) | 7.2471 | 8.2881 | 7.86143 | 0.035911 | 10 |
FCIABC1R (480) | 31.3308 | 38.2045 | 35.74124 | 0.060099 | 10 |
FCIABC1S (480) | 17.9179 | 20.28247 | 19.28269 | 0.041335 | 10 |
FCIABC2R (60) | 0.72759 | 1.0408 | 0.8666424 | 0.115566 | 10 |
FCIABC2S (60) | 0.76349 | 0.88014 | 0.822284 | 0.048232 | 10 |
FCIABC2R (240) | 9.8091 | 12.0552 | 11.16271 | 0.070444 | 10 |
FCIABC2S (240) | 7.1107 | 8.3556 | 7.77864 | 0.061344 | 10 |
FCIABC2R (480) | 30.1656 | 37.0888 | 33.80038 | 0.083557 | 10 |
FCIABC2S (480) | 16.9104 | 19.7904 | 18.91875 | 0.043669 | 10 |
Algorithm (operation time period) . | Minimum . | Maximum . | Average . | Standard deviation . | Number of feasible solutions . |
---|---|---|---|---|---|
ABCR (60) | 7.9845 | 10.3801 | 9.69217 | 0.078141 | 10 |
ABCS (60) | 9.4005 | 10.3313 | 9.86679 | 0.035238 | 10 |
ABCR (240) | 36.1193 | 54.5524 | 41.57314 | 0.152168 | 8 |
ABCS (240) | 42.5412 | 63.3729 | 49.9541 | 0.164008 | 8 |
ABCR (480) | 141.518 | 1,730.324 | 607.2727 | 0.825621 | – |
ABCS (480) | 97.1981 | 103.192 | 99.85743 | 0.021523 | – |
IABC1R (60) | 7.628 | 10.2991 | 9.6871 | 0.100425 | 10 |
IABC1S (60) | 8.0585 | 10.0486 | 9.43491 | 0.076251 | 10 |
IABC1R (240) | 35.5495 | 42.3033 | 37.89781 | 0.053643 | 8 |
IABC1S (240) | 40.8285 | 62.3627 | 47.44364 | 0.162969 | 9 |
IABC1R (480) | 124.1598 | 197.5901 | 377.9581 | 0.34356 | 6 |
IABC1S (480) | 93.9587 | 102.6383 | 98.60451 | 0.022746 | 5 |
IABC2R (60) | 7.5543 | 10.5822 | 8.78804 | 0.110237 | 10 |
IABC2S (60) | 8.0531 | 9.94501 | 8.87048 | 0.058631 | 10 |
IABC2R (240) | 35.2872 | 41.3792 | 37.81296 | 0.053078 | 9 |
IABC2S (240) | 40.2496 | 60.7114 | 46.26197 | 0.147072 | 8 |
IABC2R (480) | 123.9756 | 834.6815 | 298.3928 | 0.73599 | 5 |
IABC2S (480) | 93.5975 | 101.8695 | 98.35106 | 0.043561 | 5 |
PCABCR (60) | 7.60801 | 8.768 | 8.20586 | 0.048159 | 10 |
PCABCS (60) | 8.0273 | 9.98661 | 8.4726 | 0.066694 | 10 |
PCABCR (240) | 35.13 | 41.0809 | 39.4709 | 0.046272 | 10 |
PCABCS (240) | 28.4836 | 30.9068 | 29.6338 | 0.027533 | 10 |
PCABCR (480) | 104.5659 | 110.7172 | 107.2959 | 0.017487 | 10 |
PCABCS (480) | 84.7147 | 102.2468 | 95.21455 | 0.063369 | 10 |
PCIABC1R (60) | 7.4498 | 8.1106 | 7.78571 | 0.027833 | 10 |
PCIABC1S (60) | 7.9335 | 9.1527 | 8.559967 | 0.04161 | 10 |
PCIABC1R (240) | 34.7391 | 40.5617 | 38.36536 | 0.049174 | 10 |
PCIABC1S (240) | 27.7312 | 29.1691 | 28.79674 | 0.014851 | 10 |
PCIABC1R (480) | 104.0206 | 109.1881 | 106.7662 | 0.015627 | 10 |
PCIABC1S (480) | 83.7037 | 101.827 | 93.30147 | 0.084055 | 10 |
PCIABC2R (60) | 7.3789 | 7.94 | 7.66611 | 0.027504 | 10 |
PCIABC2S (60) | 7.7457 | 9.1375 | 8.636944 | 0.030578 | 10 |
PCIABC2R (240) | 34.2363 | 38.76664 | 37.0185 | 0.039611 | 10 |
PCIABC2S (240) | 27.631 | 29.0833 | 28.75991 | 0.01518 | 10 |
PCIABC2R (480) | 103.7 | 108.2621 | 106.2968 | 0.014971 | 10 |
PCIABC2S (480) | 81.7538 | 100.3918 | 90.86011 | 0.087466 | 10 |
FCABCR (60) | 7.3695 | 8.92 | 8.69172 | 0.051976 | 10 |
FCABCS (60) | 7.7305 | 9.1001 | 8.27981 | 0.049975 | 10 |
FCABCR (240) | 33.9958 | 37.9021 | 35.87202 | 0.038547 | 10 |
FCABCS (240) | 26.993 | 29.0105 | 28.15381 | 0.0230534 | 10 |
FCABCR (480) | 84.6598 | 89.8492 | 87.12874 | 0.021458 | 10 |
FCABCS (480) | 67.4359 | 70.6739 | 68.78317 | 0.012923 | 10 |
FCIABC1R (60) | 7.2921 | 8.2284 | 7.75551 | 0.036499 | 10 |
FCIABC1S (60) | 7.6949 | 9.0692 | 8.22376 | 0.052063 | 10 |
FCIABC1R (240) | 33.6455 | 36.5682 | 34.72254 | 0.037113 | 10 |
FCIABC1S (240) | 26.3232 | 28.9238 | 27.71237 | 0.03437 | 10 |
FCIABC1R (480) | 83.744 | 89.8085 | 87.71257 | 0.023147 | 10 |
FCIABC1S (480) | 67.0775 | 70.5848 | 68.65065 | 0.013286 | 10 |
FCIABC2R (60) | 7.1814 | 8.2503 | 7.555167 | 0.049637 | 10 |
FCIABC2S (60) | 7.6401 | 9.0316 | 8.14697 | 0.051156 | 10 |
FCIABC2R (240) | 32.0582 | 36.5682 | 33.98562 | 0.037525 | 10 |
FCIABC2S (240) | 26.245 | 28.877 | 27.86639 | 0.030269 | 10 |
FCIABC2R (480) | 83.0658 | 89.3052 | 86.23375 | 0.020504 | 10 |
FCIABC2S (480) | 67 | 70.303 | 68.75653 | 0.0122544 | 10 |
Algorithm (operation time period) . | Minimum . | Maximum . | Average . | Standard deviation . | Number of feasible solutions . |
---|---|---|---|---|---|
ABCR (60) | 7.9845 | 10.3801 | 9.69217 | 0.078141 | 10 |
ABCS (60) | 9.4005 | 10.3313 | 9.86679 | 0.035238 | 10 |
ABCR (240) | 36.1193 | 54.5524 | 41.57314 | 0.152168 | 8 |
ABCS (240) | 42.5412 | 63.3729 | 49.9541 | 0.164008 | 8 |
ABCR (480) | 141.518 | 1,730.324 | 607.2727 | 0.825621 | – |
ABCS (480) | 97.1981 | 103.192 | 99.85743 | 0.021523 | – |
IABC1R (60) | 7.628 | 10.2991 | 9.6871 | 0.100425 | 10 |
IABC1S (60) | 8.0585 | 10.0486 | 9.43491 | 0.076251 | 10 |
IABC1R (240) | 35.5495 | 42.3033 | 37.89781 | 0.053643 | 8 |
IABC1S (240) | 40.8285 | 62.3627 | 47.44364 | 0.162969 | 9 |
IABC1R (480) | 124.1598 | 197.5901 | 377.9581 | 0.34356 | 6 |
IABC1S (480) | 93.9587 | 102.6383 | 98.60451 | 0.022746 | 5 |
IABC2R (60) | 7.5543 | 10.5822 | 8.78804 | 0.110237 | 10 |
IABC2S (60) | 8.0531 | 9.94501 | 8.87048 | 0.058631 | 10 |
IABC2R (240) | 35.2872 | 41.3792 | 37.81296 | 0.053078 | 9 |
IABC2S (240) | 40.2496 | 60.7114 | 46.26197 | 0.147072 | 8 |
IABC2R (480) | 123.9756 | 834.6815 | 298.3928 | 0.73599 | 5 |
IABC2S (480) | 93.5975 | 101.8695 | 98.35106 | 0.043561 | 5 |
PCABCR (60) | 7.60801 | 8.768 | 8.20586 | 0.048159 | 10 |
PCABCS (60) | 8.0273 | 9.98661 | 8.4726 | 0.066694 | 10 |
PCABCR (240) | 35.13 | 41.0809 | 39.4709 | 0.046272 | 10 |
PCABCS (240) | 28.4836 | 30.9068 | 29.6338 | 0.027533 | 10 |
PCABCR (480) | 104.5659 | 110.7172 | 107.2959 | 0.017487 | 10 |
PCABCS (480) | 84.7147 | 102.2468 | 95.21455 | 0.063369 | 10 |
PCIABC1R (60) | 7.4498 | 8.1106 | 7.78571 | 0.027833 | 10 |
PCIABC1S (60) | 7.9335 | 9.1527 | 8.559967 | 0.04161 | 10 |
PCIABC1R (240) | 34.7391 | 40.5617 | 38.36536 | 0.049174 | 10 |
PCIABC1S (240) | 27.7312 | 29.1691 | 28.79674 | 0.014851 | 10 |
PCIABC1R (480) | 104.0206 | 109.1881 | 106.7662 | 0.015627 | 10 |
PCIABC1S (480) | 83.7037 | 101.827 | 93.30147 | 0.084055 | 10 |
PCIABC2R (60) | 7.3789 | 7.94 | 7.66611 | 0.027504 | 10 |
PCIABC2S (60) | 7.7457 | 9.1375 | 8.636944 | 0.030578 | 10 |
PCIABC2R (240) | 34.2363 | 38.76664 | 37.0185 | 0.039611 | 10 |
PCIABC2S (240) | 27.631 | 29.0833 | 28.75991 | 0.01518 | 10 |
PCIABC2R (480) | 103.7 | 108.2621 | 106.2968 | 0.014971 | 10 |
PCIABC2S (480) | 81.7538 | 100.3918 | 90.86011 | 0.087466 | 10 |
FCABCR (60) | 7.3695 | 8.92 | 8.69172 | 0.051976 | 10 |
FCABCS (60) | 7.7305 | 9.1001 | 8.27981 | 0.049975 | 10 |
FCABCR (240) | 33.9958 | 37.9021 | 35.87202 | 0.038547 | 10 |
FCABCS (240) | 26.993 | 29.0105 | 28.15381 | 0.0230534 | 10 |
FCABCR (480) | 84.6598 | 89.8492 | 87.12874 | 0.021458 | 10 |
FCABCS (480) | 67.4359 | 70.6739 | 68.78317 | 0.012923 | 10 |
FCIABC1R (60) | 7.2921 | 8.2284 | 7.75551 | 0.036499 | 10 |
FCIABC1S (60) | 7.6949 | 9.0692 | 8.22376 | 0.052063 | 10 |
FCIABC1R (240) | 33.6455 | 36.5682 | 34.72254 | 0.037113 | 10 |
FCIABC1S (240) | 26.3232 | 28.9238 | 27.71237 | 0.03437 | 10 |
FCIABC1R (480) | 83.744 | 89.8085 | 87.71257 | 0.023147 | 10 |
FCIABC1S (480) | 67.0775 | 70.5848 | 68.65065 | 0.013286 | 10 |
FCIABC2R (60) | 7.1814 | 8.2503 | 7.555167 | 0.049637 | 10 |
FCIABC2S (60) | 7.6401 | 9.0316 | 8.14697 | 0.051156 | 10 |
FCIABC2R (240) | 32.0582 | 36.5682 | 33.98562 | 0.037525 | 10 |
FCIABC2S (240) | 26.245 | 28.877 | 27.86639 | 0.030269 | 10 |
FCIABC2R (480) | 83.0658 | 89.3052 | 86.23375 | 0.020504 | 10 |
FCIABC2S (480) | 67 | 70.303 | 68.75653 | 0.0122544 | 10 |
It is worth noting that the results of the first (second) formulation of the IABC1 algorithm are improved 12.5% (4.1%) and 7.03% (12.46%) in comparison with the first (second) formulation of ABC algorithm over 60 and 240 monthly operations time periods of simple reservoir operation, respectively. Furthermore, using the ABC algorithm leads to an infeasible solution for longer operation time periods (480 months) of simple reservoir operation problem; however, using the IABC1S algorithm for this problem leads to four feasible solutions in 10 runs. In addition, the results of the first (second) formulation of the IABC1 algorithm are improved 4.46% (14.28%) and 1.6% (4.03%) in comparison with the first (second) formulation of the ABC algorithm over 60 and 240 monthly operations time periods of hydropower reservoir operation, respectively. Furthermore, using the ABC algorithm leads to an infeasible solution for longer operation time periods (480 month) of hydropower reservoir operation problem. However, using IABC1R (IABC1S) algorithms for this problem leads to six (five) feasible solutions in 10 runs. It should be noted that this improvement is particularly remarkable when the second improved version (IABC2) is used to solve these problems. Here, the results of the first (second) formulation of the IABC2 algorithm are improved 16.85% (3.92%) and 18.32% (15.52%) in comparison with the first (second) formulation of the ABC algorithm over 60 and 240 monthly operations time periods of simple reservoir operation, respectively. Furthermore, using the ABC algorithm leads to an infeasible solution for longer operation time periods (480 months) of simple reservoir operation problem. However, using the IABC1S algorithm for this problem leads to five feasible solutions in 10 runs. In addition, the results of the first (second) formulation of the IABC2 algorithm are improved 5.39% (14.33%) and 2.31% (5.39%) in comparison with the first (second) formulation of the ABC algorithm over 60 and 240 monthly operation time periods of hydropower reservoir operation, respectively. Using the ABC algorithm leads to an infeasible solution for longer operation time periods (480 months) of hydropower reservoir operation problem; however, using IABC1R (IABC1S) algorithms for this problem leads to five (five) feasible solutions in 10 runs.
Comparison of the results of Tables 3 and 4 shows the remarkable performance of the constrained version of the proposed algorithms and especially the fully constrained version in comparison with the original standard form of these algorithms. In other words, the results of the first (second) formulation of the PCIABC2 algorithm are improved 4.75% (2.61%), 58.46% (26.55%), and (64.65%) in comparison with the first (second) formulation of the IABC2 algorithm over 60, 240, and 480 monthly operation time periods of simple reservoir operation, respectively. In addition, the results of the first (second) formulation of the FCIABC2 algorithm are improved 16.59% (7.89%), 59.18% (27.09%), and (66.64%) in comparison with the first (second) formulation of the IABC2 algorithm over 60, 240, and 480 monthly operation time periods of simple reservoir operation, respectively. Furthermore, by using both formulations of the constrained versions (PCIABC2 and FCIABC2) to solve simple reservoir operation optimization problem, all results are always feasible. However, by using IABC2R (IABC2S) to solve this problem over 60, 240, and 480 monthly operation time periods, the number of feasible solutions are 10 (10), eight (eight), and zero (five), respectively. In addition, the results of the first (second) formulation of the PCIABC2 algorithm are improved 2.32% (3.82%), 2.98% (31.35%), and 16.35% (12.65%) in comparison with the first (second) formulation of the IABC2 algorithm over 60, 240, and 480 monthly operation time periods of hydropower reservoir operation, respectively. In addition, the results of the first (second) formulation of the FCIABC2 algorithm are improved 4.94% (5.13%), 9.15% (34.79%), and 33% (28.42%) in comparison with the first (second) formulation of the IABC2 algorithm over 60, 240, and 480 monthly operation time periods of hydropower reservoir operation, respectively. Furthermore, by using both formulations of the constrained versions (PCIABC2 and FCIABC2) to solve hydropower reservoir operation optimization problem, all results are always feasible; however, by using IABC2R (IABC2S) to solve this problem over 60, 240, and 480 monthly operation time periods, the number of feasible solutions are 10 (10), nine (eight), and five (five), respectively.
The convergence curves of minimum solution cost values for the simple and hydropower operation problems over 240 operation time periods are shown in Figures 1 and 2, respectively, using the original and two improved versions of ABC (IABC1 and IABC2) algorithms. It is seen from these figures that the best solution cost values obtained with improved ABC algorithms stays way below that of the original standard ABC algorithm in which the improvement of the second ones (IABC2) are better due to effective interaction between exploration and exploitation concepts.
Figures 3 and 4 show the convergence curves of minimum solution cost values for the simple and hydropower operation problems over 240 operation time periods, respectively, using the second formulation of FCIABC2, PCIABC2, and IABC2. These figures indicate that the solution cost of the FCIABC2 algorithm always stays way below that of PCIABC2 and IABC2 algorithms due to a unique feature of the proposed mechanism in which it leads feasible and smaller search space for the problem to be created.
It is worth noting that the simple and hydropower operation problems of Dez reservoir were solved using different methods. Table 5 is presented to compare the best obtained results using FCIABC2 with other available results. It should be noted that 200,000 and 1,000,000 function evaluations (for ACOA and IACOA of Jalali (2005), 6,000,000 function evaluations (for GA and HBMO of Bozorg-Haddad et al. (2006)), 400,000 function evaluations (for FCACOA of Afshar & Moeini (2008)) and 100,000 function evaluations (for GA and FCPSO of Afshar (2012), FCGSA of Moeini et al. (2017), and FCIPSO of Moeini & Babaei (2017)) were used to solve these optimization problems. Here, the best solutions of the proposed algorithms, such as FCIABC2, are obtained with 100,000 function evaluations. Comparison of the results of Table 5 shows the superiority of the proposed FCIABC2 algorithm to the other available results in nearly all operation time periods of simple and hydropower operation problems of Dez reservoir except for 240 and 480 month time periods of simple reservoir operation using FCGSA.
Operation time periods . | Methods . | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
ACOA (Jalali 2005) . | IACOA (Jalali 2005) . | HBMO (Bozorg-Haddad et al. 2006) . | GA (Bozorg-Haddad et al. 2006) . | FCACOA (Afshar & Moeini 2008) . | GA (Afshar 2012) . | FCPSO (Afshar 2012) . | FCIPSO (Moeini & Babaei 2017) . | FCGSA (Moeini et al. 2017) . | FCIABC2 (present work) . | |
Simple reservoir operation problem | ||||||||||
60 | 0.926 | 0.804 | 0.81 | 1.1 | 0.782 | 0.807 | 0.744 | 0.7356 | 0.731 | 0.72759 |
240 | – | – | – | – | 6.798 | 38 | 10.7 | 5.9101 | 4.892 | 7.1107 |
480 | Ina | 36.46 | – | – | 18.706 | In | 33.9 | 18.542 | 11.801 | 16.9104 |
Hydropower reservoir operation problem | ||||||||||
60 | In | 7.504 | – | – | 7.889 | 8.29 | 7.72 | 7.571 | 7.386 | 7.1814 |
240 | – | – | – | – | 25.785 | 53.1 | 33.7 | 25.303 | 26.730 | 26.245 |
480 | In | In | – | – | 66.809 | In | 85.7 | 71.104 | 67.957 | 67 |
Operation time periods . | Methods . | |||||||||
---|---|---|---|---|---|---|---|---|---|---|
ACOA (Jalali 2005) . | IACOA (Jalali 2005) . | HBMO (Bozorg-Haddad et al. 2006) . | GA (Bozorg-Haddad et al. 2006) . | FCACOA (Afshar & Moeini 2008) . | GA (Afshar 2012) . | FCPSO (Afshar 2012) . | FCIPSO (Moeini & Babaei 2017) . | FCGSA (Moeini et al. 2017) . | FCIABC2 (present work) . | |
Simple reservoir operation problem | ||||||||||
60 | 0.926 | 0.804 | 0.81 | 1.1 | 0.782 | 0.807 | 0.744 | 0.7356 | 0.731 | 0.72759 |
240 | – | – | – | – | 6.798 | 38 | 10.7 | 5.9101 | 4.892 | 7.1107 |
480 | Ina | 36.46 | – | – | 18.706 | In | 33.9 | 18.542 | 11.801 | 16.9104 |
Hydropower reservoir operation problem | ||||||||||
60 | In | 7.504 | – | – | 7.889 | 8.29 | 7.72 | 7.571 | 7.386 | 7.1814 |
240 | – | – | – | – | 25.785 | 53.1 | 33.7 | 25.303 | 26.730 | 26.245 |
480 | In | In | – | – | 66.809 | In | 85.7 | 71.104 | 67.957 | 67 |
aInfeasible solution.
Finally, it should be noted that the performance of the proposed algorithm to solve models of water resource systems can be evaluated by performance criteria calculation. The most common criteria are reliability (how likely a system is to fail), resiliency (how quickly it recovers from failure), and vulnerability (how severe are the consequences of failure) proposed by Hashimoto et al. (1982). Therefore, a reservoir should be managed such as to have maximum reliability and resiliency and minimum vulnerability during an operation time period. In addition, all the components in the system should also be in balance in order to achieve sustainability. Therefore, Loucks (1997) defined a new criterion named the sustainability index (SI). Tables 6 and 7 are presented here to show the values of these criteria for the simple and hydropower operation of Dez reservoir, respectively, over 60, 240, and 480 monthly operation time periods using all the proposed algorithms. Comparison of the results shows that all criteria values are improved when the improved version of ABC is used to solve these problems and in which the values of the second improved version are better that first ones. In addition, using both fully and partially constrained versions of the proposed algorithms leads to better values in comparison with the original standard form of the proposed algorithms and the values of the fully constrained versions are significantly better.
Algorithm (operation time period) . | Reliability . | Vulnerability . | Resiliency . | Sustainability index . |
---|---|---|---|---|
ABCR (60) | 58.33% | 25.67% | 44% | 19.07694% |
ABCS (60) | 63.33% | 23.25% | 45% | 21.8726% |
ABCR (240) | 41.67% | 36.33% | 41% | 10.87783% |
ABCS (240) | 43.75% | 34.83% | 42% | 11.97499% |
ABCR (480) | – | – | – | – |
ABCS (480) | – | – | – | – |
IABC1R (60) | 63.33% | 24.33% | 50% | 23.96091% |
IABC1S (60) | 66.67% | 22.67% | 50% | 25.77796% |
IABC1R (240) | 45.67% | 35.71% | 47.70% | 14.00531% |
IABC1S (240) | 47.50% | 34.33% | 49% | 15.28469% |
IABC1R(480) | 41.67% | 53.33% | 46.40% | 9.023588% |
IABC1S (480) | 42.71% | 51.04% | 48% | 10.03719% |
IABC2R (60) | 68.33% | 23.83% | 53% | 27.58489% |
IABC2S (60) | 71.67% | 21.67% | 53% | 29.75373% |
IABC2R (240) | 47.50% | 35.04% | 49% | 15.11944% |
IABC2S (240) | 50% | 33.83% | 51.60% | 17.07186% |
IABC2R (480) | 43.75% | 52.83% | 48.84% | 10.07905% |
IABC2S (480) | 45.83% | 50.50% | 50% | 11.34293% |
PCABCR (60) | 75% | 22.67% | 60% | 34.7985% |
PCABCS (60) | 80% | 20.83% | 58.30% | 36.92489% |
PCABCR (240) | 49.58% | 34.33% | 52.80% | 17.19125% |
PCABCS (240) | 53.33% | 33.04% | 53.60% | 19.14044% |
PCABCR (480) | 45.83% | 51.33% | 50.03% | 11.15942% |
PCABCS (480) | 47.92% | 49.83% | 52% | 12.50156% |
PCIABC1R (60) | 76.67% | 21.33% | 64% | 38.60242% |
PCIABC1S (60) | 81.67% | 20% | 63% | 41.16168% |
PCIABC1R (240) | 52.08% | 33.92% | 53% | 18.23967% |
PCIABC1S (240) | 56.67% | 32.67% | 54.50% | 20.79497% |
PCIABC1R (480) | 47.92% | 51.04% | 51.20% | 12.01236% |
PCIABC1S (480) | 50% | 49.33% | 53.30% | 13.50356% |
PCIABC2R (60) | 80% | 20% | 66% | 42.24% |
PCIABC2S (60) | 83.33% | 19.67% | 70% | 46.85729% |
PCIABC2R (240) | 54.58% | 33.67% | 54% | 19.54957% |
PCIABC2S (240) | 56.97% | 33.33% | 55.70% | 21.15592% |
PCIABC2R (480) | 48.95% | 50.08% | 53% | 12.951% |
PCIABC2S (480) | 51.67% | 48.50% | 53.80% | 14.31621% |
FCABCR (60) | 80% | 20% | 66.60% | 42.624% |
FCABCS (60) | 83% | 18.83% | 70% | 47.15977% |
FCABCR (240) | 52.93% | 32.04% | 56.60% | 20.35895% |
FCABCS (240) | 60.42% | 31.33% | 57.80% | 23.98146% |
FCABCR (480) | 52.08% | 50.13% | 54.30% | 14.10296% |
FCABCS (480) | 54.17% | 48.33% | 54.50% | 15.25435% |
FCIABC1R (60) | 83.33% | 19.33% | 70% | 47.05562% |
FCIABC1S (60) | 86.67% | 18.33% | 75% | 53.08754% |
FCIABC1R (240) | 58.75% | 31.33% | 60.60% | 24.44824% |
FCIABC1S (240) | 68.33% | 29.83% | 59.20% | 28.38472% |
FCIABC1R (480) | 54.17% | 49.04% | 58.60% | 16.17655% |
FCIABC1S (480) | 58.33% | 46.17% | 59% | 18.52543% |
FCIABC2R (60) | 88.33% | 18.67% | 71.40% | 51.2929% |
FCIABC2S (60) | 90% | 18.04% | 83.30% | 61.44541% |
FCIABC2R (240) | 62.50% | 30.75% | 62.30% | 26.96422% |
FCIABC2S (240) | 71.25% | 29.17% | 60.80% | 30.68356% |
FCIABC2R (480) | 57.30% | 48.13% | 56% | 16.64259% |
FCIABC2S (480) | 61.04% | 45.83% | 60.40% | 19.97148% |
Algorithm (operation time period) . | Reliability . | Vulnerability . | Resiliency . | Sustainability index . |
---|---|---|---|---|
ABCR (60) | 58.33% | 25.67% | 44% | 19.07694% |
ABCS (60) | 63.33% | 23.25% | 45% | 21.8726% |
ABCR (240) | 41.67% | 36.33% | 41% | 10.87783% |
ABCS (240) | 43.75% | 34.83% | 42% | 11.97499% |
ABCR (480) | – | – | – | – |
ABCS (480) | – | – | – | – |
IABC1R (60) | 63.33% | 24.33% | 50% | 23.96091% |
IABC1S (60) | 66.67% | 22.67% | 50% | 25.77796% |
IABC1R (240) | 45.67% | 35.71% | 47.70% | 14.00531% |
IABC1S (240) | 47.50% | 34.33% | 49% | 15.28469% |
IABC1R(480) | 41.67% | 53.33% | 46.40% | 9.023588% |
IABC1S (480) | 42.71% | 51.04% | 48% | 10.03719% |
IABC2R (60) | 68.33% | 23.83% | 53% | 27.58489% |
IABC2S (60) | 71.67% | 21.67% | 53% | 29.75373% |
IABC2R (240) | 47.50% | 35.04% | 49% | 15.11944% |
IABC2S (240) | 50% | 33.83% | 51.60% | 17.07186% |
IABC2R (480) | 43.75% | 52.83% | 48.84% | 10.07905% |
IABC2S (480) | 45.83% | 50.50% | 50% | 11.34293% |
PCABCR (60) | 75% | 22.67% | 60% | 34.7985% |
PCABCS (60) | 80% | 20.83% | 58.30% | 36.92489% |
PCABCR (240) | 49.58% | 34.33% | 52.80% | 17.19125% |
PCABCS (240) | 53.33% | 33.04% | 53.60% | 19.14044% |
PCABCR (480) | 45.83% | 51.33% | 50.03% | 11.15942% |
PCABCS (480) | 47.92% | 49.83% | 52% | 12.50156% |
PCIABC1R (60) | 76.67% | 21.33% | 64% | 38.60242% |
PCIABC1S (60) | 81.67% | 20% | 63% | 41.16168% |
PCIABC1R (240) | 52.08% | 33.92% | 53% | 18.23967% |
PCIABC1S (240) | 56.67% | 32.67% | 54.50% | 20.79497% |
PCIABC1R (480) | 47.92% | 51.04% | 51.20% | 12.01236% |
PCIABC1S (480) | 50% | 49.33% | 53.30% | 13.50356% |
PCIABC2R (60) | 80% | 20% | 66% | 42.24% |
PCIABC2S (60) | 83.33% | 19.67% | 70% | 46.85729% |
PCIABC2R (240) | 54.58% | 33.67% | 54% | 19.54957% |
PCIABC2S (240) | 56.97% | 33.33% | 55.70% | 21.15592% |
PCIABC2R (480) | 48.95% | 50.08% | 53% | 12.951% |
PCIABC2S (480) | 51.67% | 48.50% | 53.80% | 14.31621% |
FCABCR (60) | 80% | 20% | 66.60% | 42.624% |
FCABCS (60) | 83% | 18.83% | 70% | 47.15977% |
FCABCR (240) | 52.93% | 32.04% | 56.60% | 20.35895% |
FCABCS (240) | 60.42% | 31.33% | 57.80% | 23.98146% |
FCABCR (480) | 52.08% | 50.13% | 54.30% | 14.10296% |
FCABCS (480) | 54.17% | 48.33% | 54.50% | 15.25435% |
FCIABC1R (60) | 83.33% | 19.33% | 70% | 47.05562% |
FCIABC1S (60) | 86.67% | 18.33% | 75% | 53.08754% |
FCIABC1R (240) | 58.75% | 31.33% | 60.60% | 24.44824% |
FCIABC1S (240) | 68.33% | 29.83% | 59.20% | 28.38472% |
FCIABC1R (480) | 54.17% | 49.04% | 58.60% | 16.17655% |
FCIABC1S (480) | 58.33% | 46.17% | 59% | 18.52543% |
FCIABC2R (60) | 88.33% | 18.67% | 71.40% | 51.2929% |
FCIABC2S (60) | 90% | 18.04% | 83.30% | 61.44541% |
FCIABC2R (240) | 62.50% | 30.75% | 62.30% | 26.96422% |
FCIABC2S (240) | 71.25% | 29.17% | 60.80% | 30.68356% |
FCIABC2R (480) | 57.30% | 48.13% | 56% | 16.64259% |
FCIABC2S (480) | 61.04% | 45.83% | 60.40% | 19.97148% |
Algorithm (operation time period) . | Reliability . | Vulnerability . | Resiliency . | Sustainability index . |
---|---|---|---|---|
ABCR (60) | 60.00% | 23.33% | 46% | 21.16092% |
ABCS (60) | 66.67% | 21.16% | 47% | 24.70444% |
ABCR (240) | 50.00% | 34.00% | 42% | 13.86% |
ABCS (240) | 52.33% | 32.83% | 43% | 15.23052% |
ABCR (480) | – | – | – | – |
ABCS (480) | – | – | – | – |
IABC1R (60) | 65.00% | 21.83% | 51.00% | 25.91336% |
IABC1S (60) | 68.00% | 20.00% | 52.67% | 28.65248% |
IABC1R (240) | 51.67% | 32.67% | 48.00% | 16.69892% |
IABC1S (240) | 54.33% | 31.16% | 50.00% | 18.70039% |
IABC1R (480) | 48.66% | 37.16% | 47.66% | 14.57345% |
IABC1S(480) | 50.00% | 35.83% | 48.33% | 15.50658% |
IABC2R (60) | 67.66% | 20.00% | 53.33% | 28.86646% |
IABC2S (60) | 70.00% | 19.67% | 53.33% | 29.98799% |
IABC2R (240) | 53.66% | 31.33% | 48.66% | 17.93039% |
IABC2S (240) | 55% | 30.00% | 51.66% | 19.8891% |
IABC2R (480) | 50.00% | 36.67% | 48.00% | 15.1992% |
IABC2S (480) | 51.66% | 35.00% | 50.00% | 16.7895% |
PCABCR (60) | 70% | 19.16% | 55.00% | 31.1234% |
PCABCS (60) | 75% | 18.83% | 57.66% | 35.10197% |
PCABCR (240) | 55.00% | 30.00% | 50.00% | 19.25% |
PCABCS (240) | 58.33% | 28.67% | 52.16% | 21.7021% |
PCABCR (480) | 53.33% | 35.00% | 50.00% | 17.33225% |
PCABCS (480) | 55.00% | 33.33% | 51.33% | 18.82194% |
PCIABC1R (60) | 75.00% | 18.33% | 58.33% | 35.72858% |
PCIABC1S (60) | 78.33% | 18% | 60.00% | 38.52426% |
PCIABC1R (240) | 57.67% | 29.16% | 52.33% | 21.3786% |
PCIABC1S (240) | 60.00% | 27.16% | 54.16% | 23.67009% |
PCIABC1R (480) | 55.00% | 34.16% | 52.67% | 19.07286% |
PCIABC1S (480) | 57% | 32.63% | 54.16% | 20.91834% |
PCIABC2R (60) | 78% | 18% | 60.00% | 38.29236% |
PCIABC2S (60) | 80.00% | 17.67% | 65.00% | 42.8116% |
PCIABC2R (240) | 58.33% | 28.00% | 53.67% | 22.54011% |
PCIABC2S (240) | 62.66% | 26.67% | 55.00% | 25.27172% |
PCIABC2R (480) | 56.67% | 33.67% | 54.33% | 20.42222% |
PCIABC2S (480) | 60.00% | 32.00% | 58.16% | 23.72928% |
FCABCR (60) | 81% | 17% | 63.16% | 42.80498% |
FCABCS (60) | 83.670% | 16.16% | 67.66% | 47.46276% |
FCABCR (240) | 62.33% | 26.16% | 58.00% | 26.69419% |
FCABCS (240) | 65.00% | 25.00% | 60.00% | 29.25% |
FCABCR (480) | 60.00% | 31.16% | 58.33% | 24.09262% |
FCABCS (480) | 62.00% | 30.00% | 60.00% | 26.04% |
FCIABC1R (60) | 82.25% | 16.33% | 65.00% | 44.73207% |
FCIABC1S (60) | 85.00% | 15.83% | 70.00% | 50.08115% |
FCIABC1R (240) | 64.66% | 25.67% | 60.00% | 28.83707% |
FCIABC1S (240) | 67.00% | 24.67% | 63.16% | 31.87755% |
FCIABC1R (480) | 61.16% | 30.00% | 60.00% | 25.6872% |
FCIABC1S (480) | 65.00% | 28.83% | 62.16% | 28.75553% |
FCIABC2R (60) | 85.33% | 15.16% | 67.16% | 48.61979% |
FCIABC2S (60) | 88.67% | 15.00% | 72.33% | 54.51476% |
FCIABC2R (240) | 67.67% | 25.00% | 63.33% | 32.14156% |
FCIABC2S (240) | 70.00% | 24.33% | 66.16% | 35.04429% |
FCIABC2R (480) | 63.33% | 29.16% | 62.67% | 28.11562% |
FCIABC2S (480) | 66.67% | 27.43% | 65.00% | 31.44857% |
Algorithm (operation time period) . | Reliability . | Vulnerability . | Resiliency . | Sustainability index . |
---|---|---|---|---|
ABCR (60) | 60.00% | 23.33% | 46% | 21.16092% |
ABCS (60) | 66.67% | 21.16% | 47% | 24.70444% |
ABCR (240) | 50.00% | 34.00% | 42% | 13.86% |
ABCS (240) | 52.33% | 32.83% | 43% | 15.23052% |
ABCR (480) | – | – | – | – |
ABCS (480) | – | – | – | – |
IABC1R (60) | 65.00% | 21.83% | 51.00% | 25.91336% |
IABC1S (60) | 68.00% | 20.00% | 52.67% | 28.65248% |
IABC1R (240) | 51.67% | 32.67% | 48.00% | 16.69892% |
IABC1S (240) | 54.33% | 31.16% | 50.00% | 18.70039% |
IABC1R (480) | 48.66% | 37.16% | 47.66% | 14.57345% |
IABC1S(480) | 50.00% | 35.83% | 48.33% | 15.50658% |
IABC2R (60) | 67.66% | 20.00% | 53.33% | 28.86646% |
IABC2S (60) | 70.00% | 19.67% | 53.33% | 29.98799% |
IABC2R (240) | 53.66% | 31.33% | 48.66% | 17.93039% |
IABC2S (240) | 55% | 30.00% | 51.66% | 19.8891% |
IABC2R (480) | 50.00% | 36.67% | 48.00% | 15.1992% |
IABC2S (480) | 51.66% | 35.00% | 50.00% | 16.7895% |
PCABCR (60) | 70% | 19.16% | 55.00% | 31.1234% |
PCABCS (60) | 75% | 18.83% | 57.66% | 35.10197% |
PCABCR (240) | 55.00% | 30.00% | 50.00% | 19.25% |
PCABCS (240) | 58.33% | 28.67% | 52.16% | 21.7021% |
PCABCR (480) | 53.33% | 35.00% | 50.00% | 17.33225% |
PCABCS (480) | 55.00% | 33.33% | 51.33% | 18.82194% |
PCIABC1R (60) | 75.00% | 18.33% | 58.33% | 35.72858% |
PCIABC1S (60) | 78.33% | 18% | 60.00% | 38.52426% |
PCIABC1R (240) | 57.67% | 29.16% | 52.33% | 21.3786% |
PCIABC1S (240) | 60.00% | 27.16% | 54.16% | 23.67009% |
PCIABC1R (480) | 55.00% | 34.16% | 52.67% | 19.07286% |
PCIABC1S (480) | 57% | 32.63% | 54.16% | 20.91834% |
PCIABC2R (60) | 78% | 18% | 60.00% | 38.29236% |
PCIABC2S (60) | 80.00% | 17.67% | 65.00% | 42.8116% |
PCIABC2R (240) | 58.33% | 28.00% | 53.67% | 22.54011% |
PCIABC2S (240) | 62.66% | 26.67% | 55.00% | 25.27172% |
PCIABC2R (480) | 56.67% | 33.67% | 54.33% | 20.42222% |
PCIABC2S (480) | 60.00% | 32.00% | 58.16% | 23.72928% |
FCABCR (60) | 81% | 17% | 63.16% | 42.80498% |
FCABCS (60) | 83.670% | 16.16% | 67.66% | 47.46276% |
FCABCR (240) | 62.33% | 26.16% | 58.00% | 26.69419% |
FCABCS (240) | 65.00% | 25.00% | 60.00% | 29.25% |
FCABCR (480) | 60.00% | 31.16% | 58.33% | 24.09262% |
FCABCS (480) | 62.00% | 30.00% | 60.00% | 26.04% |
FCIABC1R (60) | 82.25% | 16.33% | 65.00% | 44.73207% |
FCIABC1S (60) | 85.00% | 15.83% | 70.00% | 50.08115% |
FCIABC1R (240) | 64.66% | 25.67% | 60.00% | 28.83707% |
FCIABC1S (240) | 67.00% | 24.67% | 63.16% | 31.87755% |
FCIABC1R (480) | 61.16% | 30.00% | 60.00% | 25.6872% |
FCIABC1S (480) | 65.00% | 28.83% | 62.16% | 28.75553% |
FCIABC2R (60) | 85.33% | 15.16% | 67.16% | 48.61979% |
FCIABC2S (60) | 88.67% | 15.00% | 72.33% | 54.51476% |
FCIABC2R (240) | 67.67% | 25.00% | 63.33% | 32.14156% |
FCIABC2S (240) | 70.00% | 24.33% | 66.16% | 35.04429% |
FCIABC2R (480) | 63.33% | 29.16% | 62.67% | 28.11562% |
FCIABC2S (480) | 66.67% | 27.43% | 65.00% | 31.44857% |
CONCLUDING REMARKS
The artificial bee colony (ABC) algorithm was used here for solving the operation optimization problem of single-reservoir system which is based on the natural behavior of a group of bees to find food together. In addition, in this paper, two IABC algorithms were proposed in order to improve the performance of this algorithm. Finally, in order to improve the performance of the proposed algorithms to solve large-scale problems, here, two constrained versions of these algorithms were also proposed, in which in these algorithms the problem constraints were satisfied explicitly. Here, two formulations were proposed for each proposed algorithm considering water release or storage volumes as decision variables of the problem. The simple and hydropower operation optimization problems of Dez reservoir, in southern Iran, were solved over 60, 240, and 480 monthly operation time periods and the results were presented and compared. Comparison of the results showed that using the proposed improved versions of the ABC algorithm led to better results with low computational costs in comparison with the standard form of the ABC algorithm, especially for longer operation period. In other words, using the ABC algorithm led to an infeasible solution for 480 monthly operation period of simple and hydropower reservoir operation problems; however, using IABC algorithms led to some feasible solutions for both problems. In addition, by using the constrained versions, this improvement was remarkable and therefore the proposed constrained improved ABC algorithm was capable of solving large reservoir operation problems. In other words, the results of the second formulation of the FCIABC2 algorithm were improved 2.61% (5.13%), 26.55% (34.79%), and 64.65% (28.42%) in comparison with the second formulation of IABC2 algorithm over 60, 240, and 480 monthly operation time periods of simple (hydropower) reservoir operation, respectively.