According to the European Directive 2007/60/CE, flood risk evaluation should include a cost–benefit analysis (CBA) on a long-term time horizon to evaluate the impact of mitigation measures. The standard CBA assumes to know in advance the events observed in the time horizon and a priori compares all mitigation measures by an economic metric. No change is supposed to be made to these measures throughout the time horizon. This modus operandi is not appropriate in the domain of flood risk management because several conditions are uncertain when the CBA is made (e.g., urban policies). This article faces these challenges by the integration of cost–benefit analysis and decision trees, to prescribe mitigation measures under uncertainty on the budget for mitigation actions because their funding can be modified after the conclusion of the CBA. The former integration is discussed in the real case of the lowland valley of the Coghinas River (Sardinia, Italy), for which the classical CBA compared five mitigation measures of infrastructural works. The integration into the decision tree also allows evaluation of mitigation measures with changes in infrastructural works and a lamination action. The outcomes advise decreasing the maximum storage level and increase the peak lamination.

  • Integrates decision tree into a cost-benefit analysis to prescribe optimal decisions for the planning of flood risk mitigation.

  • Investigates the introduction of uncertainty on budget availability by the probability of funding each configuration in the time horizon.

  • Defines optimal decisions under uncertainty and provides the authorities with strategic information about the flood mitigation measures to be implemented.

Climate change and expansion in urbanization increase the occurrences of flood events in anthropized areas. These critical events result in damages affecting people's safety, civil infrastructures, industries, crops, and the urban environment. Their growing impact on human life motivates the need to set up adequate flood mitigation plans prescribing mitigation measures (actions or configurations).

The Organizations of European Community Countries recently stressed the need to improve Flood Risk Management Plans to assess land vulnerabilities, define mitigation infrastructures, and face the adverse consequences of floods (European Commission 2007). Emergency and risk management plans should be proactive measures required for preparation, mitigation, and possible reconstruction when natural disasters occur (Price & Vojinovic 2008; Poljanšek et al. 2017).

The European Commission Flood Directive 2007/60 requires a preliminary assessment of damages to estimate the impact of floods (Albano et al. 2017). It states that ‘flood risk management plans have to take into account relevant aspects such as costs and benefits’ and recommends local authorities and policy-makers to decide upon the implementation of flood mitigation strategies by a cost–benefit analysis (CBA) (Bos & Zwaneveld 2017; Molinari et al. 2021). Hence, costs and benefits should both be evaluated. Costs are mostly due to the construction, operations, management, and replacement of the mitigation solutions. Benefits can be evaluated as a reduction of expected damages, which are avoided by the realization of specific scenario mitigation works (Ramirez et al. 1988; Gissing & Blong 2004; Jongman et al. 2012; Kind et al. 2017).

A correct CBA involves a deep knowledge of the rules in river systems management and flood flow estimation, which require a careful hydrological analysis (Sulis et al. 2020). This analysis could be based on a ‘return time’ Tr (i.e., the average time elapsed between two flood events reaching or overtaking the assessed flood value). However, when non-stationary effects are considered, one can refer to the probability of an event being exceeded in each year.

Furthermore, CBA compares the damages in the current configuration (i.e., ante-operam-scenario) and after the conclusion of works (i.e., post-operam-scenario) (Pistrika et al. 2014; Di Francesco et al. 2021; Napolitano et al. 2022). In the comparison, the water flow depth and velocity in flooded areas are key data, which can be obtained from hydraulic simulation models of flood flows. The ‘European JRC Flood Damages Functions’ in Huizinga (2007, Huizinga et al. 2017) can be applied to define the links among flood inundation features and potential losses in extreme flood scenarios and return a monetary estimation of damages from land uses and water depths (Dutta et al. 2003; Scawthorn et al. 2006; Frongia et al. 2015; Amadio et al. 2016; Martínez-Gomariz et al. 2020).

In the CBA, costs, damages, and expected benefits should be classified. Damages can be divided into two main categories: tangible (i.e., physical damages due to contact with water and loss of production and income) and intangible (i.e., loss of life and trauma). Both damages are direct or indirect (Jongman et al. 2012). In this study, direct tangible and indirect tangible damages are supposed to be monetary estimations of damages and benefits, which are evaluated as the reduction of damages owing to the realization of structural mitigation works or proactive management solutions (i.e., warning plans or reservoir operation rules to laminate flood peaks) (Meyer et al. 2012; Pesaro et al. 2018). All in all, the CBA is used by decision-makers to appraise the desirability of a given decision policy of mitigation measures, as well as the year in which benefits start overcoming costs by actualization procedures (Mechler et al. 2014).

However, a standard CBA concerns a long-term time horizon under a deterministic setting. This means that one assumes to know which uncertain data will be observed in the overall horizon, and a priori defines the possible mitigation measures with respect to these data. This modus operandi does not completely match the requirements of flood risk management plans because they must be made under uncertainty on both the climatic environment and financing availability and must be adapted in the case of unexpected data realizations.

This article investigates the possibility to face the former drawbacks by decision trees (DTs), which are logical and systematic ways to address decision problems with a single criterion under uncertainty (Bertsimas & Freund 2004). The criterion is the same economic metric adopted for the CBA (Shreve & Kelman 2014). The integration of a CBA into a DT results in the additional analysis of all configurations with changes among mitigation measures. These changes are made by decisions taken during the time horizon, whereas the classical CBA does not allow any change in the mitigation measures, which are a priori defined at the beginning of the same horizon. All in all, the integration between CBAs and DTs makes CBAs proactive and able to stand unexpected realizations of uncertain parameters.

This article is organized as follows. In Section 2, some essential recalls of CBA are given. In Section 3, a brief introduction to DTs is provided. In Section 4, we introduce the real case study of the Coghinas Basin in the Sardinia region (Italy). Different mitigation configurations are investigated to optimize the net benefit value in the case of uncertain funding.

CBA is a systematic approach for estimating the strengths and weaknesses of several alternatives (Woodward et al. 2014; Sulis et al. 2020). It aims to select the best alternative for achieving benefits while preserving savings (Nas 1996). This approach is widely used in economics and engineering to compare different projects or investments (Loucks & Van Beek 2017). In CBA, benefits and costs should be expressed in monetary terms and adjusted according to the time value of money. In this article, the comparison is made in terms of the net present value (NPV), but one could also adopt different metrics, such as the internal rate of return, the benefit–cost ratio, and the payback period.

In CBA, all streams of benefits and costs over time must be expressed on a common basis in terms of their present values, regardless of whether they are incurred at different times. The present value (PV) of future costs or benefit values represents today's value of a future stream of payments. The PV can be computed as follows:
(1)
where represents the net cash inflow/outflows in period t; r is the discount rate; and T is the length of the planning horizon.
The PV in (1) allows us to put all costs and benefits in a common temporal step, using time and money values (cost/benefit) occurrence estimations. The NPV of benefits can be computed by the difference between the future expected streams of awaited benefits (B) and costs (C) as follows:
(2)

In a CBA, the NPV should be maximized. Clearly, one is interested in the flood mitigation policy maximizing the NPV.

NPV assessment in flood risk management

To properly analyse a flood risk management problem, a fixed time horizon should be considered to make a correct and effective economic comparison between cost and benefit values.

Each infrastructure configuration can be considered as a flood mitigation solution (Haddad et al. 2015). These configurations have different costs and benefits per year, which can be set up by hydraulic simulation. The benefits of reservoir management are the reduction of the flood rate due to lamination and land flooding during the lifetime of the infrastructure. More formally, benefits are computed by the initial estimation of the expected annual value of flood damages and the evaluation of their reductions. The expected annual value of damages can be computed by Equation (3):
(3)
where represents the economic evaluation of flood damages of an expected flood flow with return period and occurrence probability .

The effectiveness of each alternative can be evaluated by the comparison between the mean annual value of flood damages in the actual configuration without intervention (denoted by Configuration (0)) and the damages in the case of a specific ith configuration (denoted by Configuration (i)).

In Figure 1, these damage functions are drawn for different values of the occurrence probability (or the related return periods Tr), as discussed by Frongia et al. (2015, 2018). The area between Configuration (0) and Configuration (i) represents the expected decrease in flood damages after the realization of the ith Configuration. The left part of these functions considers very exceptional flood events when Tr>200 years.
Figure 1

Flood damage comparison: configuration (0) – configuration (i).

Figure 1

Flood damage comparison: configuration (0) – configuration (i).

Close modal
Expected benefits in each configuration can be evaluated by (4). It computes the annual expected benefit for the ith configuration as the difference between the expected damages in Configuration (0) (denoted by ) and the expected damages in the ith configuration of mitigation works :
(4)
Then, one can derive the benefit of configuration i at time t.

Costs must account for construction, operation, maintenance, and replacement. When an upstream reservoir is devoted both to flood lamination and water regulation for users, additional costs must be considered. They mainly depend on the reservoir's operation rules, indeed the additional storage capacity generated by the lamination could decrease water demand fulfilment for the users in the case of drought.

In addition, it is of interest to include penalties for funded configurations, which are not made owing to unexpected changes in mitigation policies. It is worth noting that these penalties are not adopted in a standard CBA because they can be observed only after the beginning of the time horizon. However, they can be taken into account if a new mitigation configuration is selected. In the notation, a parameter is introduced: it takes value 1 if configuration i is selected at time t, 0 otherwise. In a standard CBA, takes value 1 for configuration i only if t is the first period of the time horizon, 0 otherwise. Moreover, the following notation is adopted for costs:
  • is the construction cost of configuration ith actualized at the building year .

  • are operation, maintenance, and replacement costs in configuration ith at year .

  • is the deficit cost for user uth in configuration ith of reservoir operating rules at year t.

  • is the penalty (actualized at year ) paid in the case of missing realization of configuration ith, even if the funds are available.

All costs and benefits are assessed, actualized, and cumulated along the time horizon of analysis. Since different configurations can be integrated into each possible system evolution throughout the planning horizon, one could compute the NPV as follows:
(5)
where I is the total number of configurations and T is the number of years in the planning horizon.

One computes NPV by (5) for all configurations and selects the configuration with maximum NPV.

DTs are analytical models to systematically define, structure, and analyse decision problems under uncertainty with a single criterion (Bertsimas & Freund 2004). Figure 2 lists the steps required for building a DT.
Figure 2

Decision tree steps.

Figure 2

Decision tree steps.

Close modal

In step 1, one must list all decisions to be made and all uncertain events. For example, a possible decision in this problem is to adopt or ignore the reservoir operation rules. A possible uncertain event is the possible change in the budget: in this study, it could increase or remain unchanged.

In step 2, one selects the criterion to compare mitigation policies. In this article, the criterion is the NPV, which is computed according to Equation (5), clearly preferring a higher net benefit to a lower net benefit.

In step 3, one represents decisions as branches emanating from decision nodes and uncertain outcomes as branches emanating from event nodes. The links between these nodes must be consistent with the problem dynamics. For example, in flood risk management, one could decide first if the reservoir rules must be adopted before observing if the budget for works is increased or unchanged. This can be shown in Figure 3, where time flows from left to right.
Figure 3

A DT with two possible decisions at node Y.

Figure 3

A DT with two possible decisions at node Y.

Close modal
In step 4, one must set or determine the probabilities of each branch emanating from event nodes, to quantify the possibility to observe the associated random outcome. For example, in Figure 4, two event nodes are reported after the decisions as shown in Figure 3, and the probabilities of branches leaving from event nodes are supposed to be 0.5.
Figure 4

A DT with two event nodes, each with two uncertain outcomes with equal probability.

Figure 4

A DT with two event nodes, each with two uncertain outcomes with equal probability.

Close modal

In step 5, one must compute the numerical value of the decision criterion in the final branches of the DT.

In step 6, one solves the DT by backward induction (or folding back algorithm). It starts from the final branches of the DT and moves toward the starting node. When an event node is visited, one computes the average value of the criterion from all possible outcomes. This means converting the distribution of possible net benefits to a single numerical value using the average, which weights all possible outcomes by their probability. When a decision node is visited, one chooses the branch emanating from this node with the best value of the criterion. In the CBA, this means crossing off the branches emanating from a node with a worse value of the NPV of benefits. Note that in a decision node, the decision-maker selects which branch to opt for according to the selected criterion, whereas this is not possible at event nodes because one cannot decide which outcome will be observed.

The folding back algorithm stops when the initial node of the tree is visited. The solution of the DT can also be represented as the subset of edges selected in the path emanating from this node.

The former procedure is applied to define the optimal assessment for flood risk mitigation in the real case of the Coghinas River lowland flood plain, located in the northern part of the Sardinia region (Italy).

Coghinas River is the third longest river in the region and has a drainage basin of 2,551 km2 (Figure 5). The river flows into the Mediterranean Sea crossing a lowland valley and has an upstream artificial reservoir with a capacity of 283 Mm3. This reservoir is determined by the 58 m high Muzzone dam. The reservoir stores almost the totality of water resources needed to fulfil the water request in the territories of north Sardinia.

In Coghinas lowland floodplain valley are located some urban settlements: Viddalba, Santa Maria Coghinas, and Valledoria (Figure 6). Moreover, the Coghinas lowland valley has a strategic relevance for tourism and agriculture.

Flood risk mitigation measures for the Coghinas floodplain

According to the Regional Plan for Flood Mitigation (ARDIS 2014) in the future, this valley could be highly exposed to flood events generating significant damages to civil properties, crops, livestock, infrastructures, and the environment. Therefore, public authorities and policy-makers defined some strategic structural and proactive reservoir management policies to mitigate the consequences of possible flood occurrences.

Structural flood risk mitigation measures

To reduce the impact of flood damages, the Sardinia region defined some structural solutions such as critical bridge demolition, levees and drainage channel improvements, and new constructions. The possible actions for flood damage reduction in the Coghinas floodplain area are reported in Table 1, with their construction costs, according to the Regional Plan for Flood Mitigation (ARDIS 2014).

Table 1

Structural flood risk mitigation actions

Work codeWork descriptionCC (M€)
New levee on the right bank to protect Viddalba town 2.38 
Adjustment of the levee on the left bank (up to Santa Maria Coghinas) 2.59 
New levee to protect Santa Maria Coghinas town 1.81 
Hydraulic arrangement of the hydrographic network upstream of the levee which protects Santa Maria Coghinas town 0.33 
Adjustment of all the levees on the left bank 15.67 
Demolition of the old bridge along the provincial road n° 146 over the Coghinas river near Viddalba town 0.09 
Demolition of the bridge along the provincial road n° 90 over the Coghinas river near Valledoria town 0.32 
Demolition of the bridge over Badu Crabile river along the provincial road n° 35 0.19 
Work codeWork descriptionCC (M€)
New levee on the right bank to protect Viddalba town 2.38 
Adjustment of the levee on the left bank (up to Santa Maria Coghinas) 2.59 
New levee to protect Santa Maria Coghinas town 1.81 
Hydraulic arrangement of the hydrographic network upstream of the levee which protects Santa Maria Coghinas town 0.33 
Adjustment of all the levees on the left bank 15.67 
Demolition of the old bridge along the provincial road n° 146 over the Coghinas river near Viddalba town 0.09 
Demolition of the bridge along the provincial road n° 90 over the Coghinas river near Valledoria town 0.32 
Demolition of the bridge over Badu Crabile river along the provincial road n° 35 0.19 

These structural mitigation actions can be clustered into five main project configurations.

As illustrated in Table 2, each project configuration includes different single works and aims to protect different areas along the Coghinas River (ARDIS 2014). Each project configuration gathers specific actions, which could be funded and built in different time steps, according to priorities and probabilities of funding that can be evaluated.

Table 2

Cluster of works related to each project configuration

Project configuration
Configuration 0Configuration 1Configuration 2Configuration 3Configuration 4
Work code 
 
 
  
    
    
Project configuration
Configuration 0Configuration 1Configuration 2Configuration 3Configuration 4
Work code 
 
 
  
    
    

Configuration 0 represents the non-intervention option. Nevertheless, it concerns the demolition of two existing bridges, and these actions are considered the highest priority and are also included in all the other possible configurations (while action with work code ‘O’ is aimed at protecting Viddalba only). Configuration 1 and Configuration 2 aim to safeguard the two towns of Viddalba and Santa Maria Coghinas, respectively. Configuration 3 aims to consider the protection of both these two towns. Configuration 4 is the most expensive in terms of costs, as it guarantees mitigation measures for the whole Coghinas lowland floodplain, also considering the territories of Viddalba.

The benefits of each configuration are estimated from the reduction of expected damages considering 12 categories of land use. They are listed in Table 3, which reports related values of maximum damage for surface units (Sulis et al. 2020). It is worth noting that the maximum flood damage cannot be always defined in a univocal way, such as for class with labels 9–12. Territories with labels 9–12 are considered restrictive for the construction of mitigation works and are not included in the CBA.

Table 3

Land-use classes and maximum damage values

LabelLand-use classMax damage value (€/m2)
Residential buildings 618 
Commercial 511 
Industry 440 
Agriculture 0.63 
Council roads 10 
Provincial roads 20 
Other roads 40 
Infrastructural (areas with water supply network, electric grid and similar systems) 40 
Dams, rivers, and similar areas – 
10 Environmental heritage areas – 
11 Historical and archaeological heritage areas – 
12 Area subjected of other intangible damages – 
LabelLand-use classMax damage value (€/m2)
Residential buildings 618 
Commercial 511 
Industry 440 
Agriculture 0.63 
Council roads 10 
Provincial roads 20 
Other roads 40 
Infrastructural (areas with water supply network, electric grid and similar systems) 40 
Dams, rivers, and similar areas – 
10 Environmental heritage areas – 
11 Historical and archaeological heritage areas – 
12 Area subjected of other intangible damages – 

The definition of the damage function was made by a flood damage assessment according to the evaluation of water depth resulting from the hydraulic simulation models (Frongia et al. 2015; Sulis et al. 2020). To predict the expected mean annual value of flood damages, three values of return time-period are considered: Tr = 50, 100, and 200 years, and related flood peaks and hydrographs have been evaluated. In this study, the residential depth-damage curve was taken from the study by Frongia et al. (2015), while the JRC damage curves were adopted for other land uses.

Reservoir operation rules for flood risk mitigation

In addition to new structural configurations, flood risk mitigation could be achieved, or even avoided, by planning in the upstream reservoir some proactive management rules workable for both uses of flow regulation and lamination. Two reservoir operation rules are here considered for the management of the Muzzone Dam (Figure 7):

  • Keep the maximum storage level, i.e.: 164 m above sea level (m a.s.l.) as the available capacity for flow regulation.

  • Decrease the maximum level to 162 m a.s.l. and increase the lamination volume of 35 million cubic meters, thus reducing the downstream flood peak.

The tree configurations can be clustered into the two main project configurations, L0 and L1, which are reported in Table 4.

Table 4

Cluster of works related to each project configuration – reservoir operation rules

Project configuration
Configuration L0Configuration L1
Work code 
  
  
  
  
  
Project configuration
Configuration L0Configuration L1
Work code 
  
  
  
  
  

Configuration L0 is based on the reduction of storage capacity and the increase in flood lamination volume. Additional costs are considered to guarantee annual levees maintenance in the current configuration. Meanwhile, Configuration L1 implements the new set of structural works listed in Table 5, which can completely avoid residual damages.

Table 5

Structural flood risk mitigation actions – reservoir operation rules

Work codeWork descriptionCC (M€)
Annual levees maintenance 0.16 
New levee on the right bank to protect Viddalba town 0.2 
Levee adjustment on left bank 6.04 
New levee section overflowable construction on the right bank 1.95 
Security adjustment of all the levee on the left bank 1.41 
Dune and bank protection operation 0.74 
Work codeWork descriptionCC (M€)
Annual levees maintenance 0.16 
New levee on the right bank to protect Viddalba town 0.2 
Levee adjustment on left bank 6.04 
New levee section overflowable construction on the right bank 1.95 
Security adjustment of all the levee on the left bank 1.41 
Dune and bank protection operation 0.74 

Both these configurations L0 and L1 consider a new cost term in (5), which is computed as the cost of deficit occurrences in water demand fulfilment. As reported in the lines of Table 6, the deficit in water demand fulfilment can be categorized into two classes: planned and unplanned. Planned deficits can be forecasted in advance for users, while unplanned deficits arise in the case of hydrological scenarios of unexpected water scarcity, thus affecting and harming users. To consider this possibility, for each kind of water use, an initial percentage (15% for irrigation use, 2% for civil, 5% for industrial) of the unsatisfied demand (deficit) is computed as a planned deficit, while remaining surpluses of shortages are considered as unplanned deficits.

Table 6

Annual deficit (100 years) – reservoir operation rules

DeficitCost (€/m3)
Storage level (m a.s.l.)
164 (Mm3)162 (Mm3)
IrrigationCivilIndustrial
Planned 0.06 0.25 2.56 113 119 
Unplanned 0.6 2.5 256 132 138 
Total – –  245 257 
DeficitCost (€/m3)
Storage level (m a.s.l.)
164 (Mm3)162 (Mm3)
IrrigationCivilIndustrial
Planned 0.06 0.25 2.56 113 119 
Unplanned 0.6 2.5 256 132 138 
Total – –  245 257 

The annual total amounts and their costs are evaluated using regional studies to define the water rates for units of volume applied to different kinds of use. Deficit costs are evaluated through a multiplicative coefficient applied to water rates (RAS 2006).

The impact of this operation rule is assessed by evaluating the differences between the deficit in these two storage configurations. Table 7 summarizes the deficit evaluation over 100 years obtained using the WARGI DSS simulation tool (Sechi & Zuddas 2000; Sulis & Sechi 2013). WARGI-SIM is the simulation module developed by the Water Research Group at the University of Cagliari (Sulis & Sechi 2013). It provides a network representation of water systems and determines water flows based on operative rules, technological constraints, preferences, and priorities.

Table 7

Deficit evaluation over a planning horizon of 100 years

DeficitDeficit (Mm3)
Total deficit
IrrigationCivilIndustrialMm3M€
Planned 5.8 0.2 0.4 
Unplanned 5.86 0.14 3.5 
Total 11.66 0.34 12 3.9 
DeficitDeficit (Mm3)
Total deficit
IrrigationCivilIndustrialMm3M€
Planned 5.8 0.2 0.4 
Unplanned 5.86 0.14 3.5 
Total 11.66 0.34 12 3.9 

Table 7 shows that the total amount of evaluated deficit is nearly equally divided between planned and unplanned. However, the impact of unplanned shortages is much more relevant with respect to planned shortages. The total annual amount of the related costs should be actualized and cumulated year by year along the whole planning horizon.

After the analysis of Tables 2 and 4, a classical CBA was made to select the optimal flood mitigation measure for the Coghinas floodplain in a time horizon of 100 years (ARDIS 2014).

Table 8 reports the main outcomes of the standard CBA on structural mitigation measures only: the first year with positive NPV and the NPV itself.

Table 8

Standard CBA outcomes

Project configurationFirst year with positive NPVNPV (M€)
Configuration 0 Never −4.24 
Configuration 1 Never −7.05 
Configuration 2 7th 13.34 
Configuration 3 13th 10.02 
Configuration 4 40th 1.43 
Project configurationFirst year with positive NPVNPV (M€)
Configuration 0 Never −4.24 
Configuration 1 Never −7.05 
Configuration 2 7th 13.34 
Configuration 3 13th 10.02 
Configuration 4 40th 1.43 

Clearly, Configuration 2 was selected as opposed to each structural project configuration. However, this decision assumed a priori knowledge of budget availability throughout the planning horizon and ignored the opportunity to upgrade Configuration 2 if the budget increases in the time horizon. Moreover, the standard CBA did not consider any lamination action. The integration of CBA into DTs overcomes these limits and returns a more reliable planning strategy.
Figure 5

Sardinia island and the Coghinas River Basin location.

Figure 5

Sardinia island and the Coghinas River Basin location.

Close modal
Figure 6

Coghinas lowland floodplain with original levees configuration.

Figure 6

Coghinas lowland floodplain with original levees configuration.

Close modal
Figure 7

North Sardinia water supply system.

Figure 7

North Sardinia water supply system.

Close modal

CBA and DTs in the Coghinas floodplain

At the beginning of the planning horizon, the budget is supposed to be sufficient to implement all possible configurations listed in Table 2, as in a standard CBA. Nevertheless, funding availability could be uncertain in the future. A new update about the budget is supposed to be observed in the 10th and 20th years:

  • - It could increase (higher budget) with a probability of 0.5 and allow an upgrade to a more expensive configuration or keep the current one.

  • - It could have no change (constant budget) with a probability of 0.5 and allow the current configuration to be kept.

First, one must decide if reservoir operation rules must be followed. Therefore, the overall DT can be split into two main parts, one for each branch in Figure 8.
Figure 8

The initial part of the DT.

Figure 8

The initial part of the DT.

Close modal

In the following sections, we build two subtrees generated after the former branches. Clearly, we will opt for the subtree with the maximum net benefit value, to decide if the reservoir rules must be adopted.

DT – maximum storage level for flow regulation

In this section, we describe the decision subtree after the branch denoted by ‘NO RESERVOIR OPERATION RULES’ in Figure 8. This subtree is reported in Figure 9.
Figure 9

The subtree of structural configurations.

Figure 9

The subtree of structural configurations.

Close modal

In Figure 9, the initial decision is modelled by a decision node, which is drawn by a small box with the label A′ at year t = 0. Each possible decision at node A′ is a configuration in Table 2 and is represented by a branch emanating from node A′: the branch in red shows the selection of Configuration 0, the branch in green shows Configuration 1, the branch in orange shows Configuration 2, the branch in yellow shows Configuration 3, and the branch in purple shows Configuration 4.

If Configuration 0 is selected, one must face the uncertainty of whether the budget will increase or be constant at year t = 10. Since it may be constant with probability 0.5 or increase with probability 0.5, this uncertain event is modelled by an event node, which is represented by a small cycle with label B at year t = 10. Each possible outcome of this event is represented by a branch emanating from B. More precisely, if the budget does not change, one joins node D4 from node B; if the budget increases, one joins node C from B.

If a constant budget is observed at node B, the only possible decision at year t = 10 is to keep Configuration 0. This decision is represented by a red arc emanating from node B and joining node D4. However, the budget could also change 10 years later (i.e., 20 years after the beginning of the planning horizon). It may be constant with a probability of 0.5 or higher with a probability of 0.5. In the first case, one joins node E9 from event node D4 and can only decide to keep Configuration 0. The value of the criterion at year 100 in paths A′, B, D4, E9 is −4.24 M€. If a budget increase is observed after node D4, one moves to decision node E8. Here, one can opt for all five possible configurations with different net benefit values associated with each branch. For the sake of clarity, Figure 10 zooms in these configurations at year t = 20.
Figure 10

Zooming on the branch A-B of DT.

Figure 10

Zooming on the branch A-B of DT.

Close modal

If a budget increase is observed at node B (year t = 10), one moves to decision node C, where one can choose all five possible configurations. More precisely, one can switch directly to Configuration 4, up to the end of the planning horizon, because the downgrade to a lower configuration is not allowed. In this case, the final value of the NPV is −0.39 M€.

If Configurations 0, 1, 2, or 3 are selected at node C, one needs to face budget uncertainty at year t = 20. It may be ‘constant’ with a probability of 0.5 or ‘higher’ with a probability of 0.5. This uncertainty is represented by event nodes D, D1, D2, and D3. After these nodes, there are two possible decision nodes: if there is a ‘constant’ budget, one moves up to the end of the planning horizon just with the current configuration; else, if the budget is ‘higher’, one can choose the best configuration.

It is worth noting that the DT in Figure 9 also includes all configurations of the classical CBA in Table 8:

  • Path A′, B, D4, E9 is Configuration 0 in the classical CBA (NPV = −4.24 M€)

  • Path A′, B1, D8, E17 is Configuration 1 in the classical CBA (NPV = −7.05 M€);

  • Path A′, B2, D11, E23 is Configuration 2 in the classical CBA (NPV = 13.34 M€);

  • Path A′, B3, D13, E27 is Configuration 3 in the classical CBA (NPV = 10.02 M€);

  • The purple leaving from A′ is Configuration 4 (NPV = 1.43 M€).

The additional scenarios in the DT present decision nodes at time t = 10 or t = 20, i.e., decisions modifying the initial mitigation strategy.

The optimal sequence of configurations can be determined by the folding back algorithm. One must start from the final branches and choose that branch emanating from the decision node with the best value of the criterion (for the sake of clarity, one can write this value above the node and cross off the branches with lower values of the criterion).

For example, in Figure 10, at decision node E8 Configuration 2 is selected and the other configurations are disregarded. For each event node, we compute the average of the criterion over each branch weighted by its probability (for the sake of clarity, we write this number above the event node). For example, at decision node D4, we compute the average between 4.06 M€ and −4.24 M€: −4.24 * 0.5 + 4.06 * 0.5 = -0.09 M€. This algorithm is iterated until all nodes of the DT are visited.

The solution of this DT is reported in Figure 11. According to the solution, one should select Configuration 2 at the beginning of the planning horizon (i.e., move along the branch from A′ to B2). Then, if a higher budget is available after 10 years (in the branch from B2 to C3), select Configuration 2. This selection must be repeated at year t = 20 regardless of the variation in the budget. If the budget is constant, keep Configuration 2 for 10 more years (move along the branch from B2 to D11). If the budget becomes higher (in the branch from D11 to E22), keep Configuration 2, else (in the branch from D11 to E23) select again Configuration 2. The overall value of this decision strategy is the value of the criterion computed in the initial node A′.
Figure 11

Optimal paths on the DT with structural configurations.

Figure 11

Optimal paths on the DT with structural configurations.

Close modal

DT – storage level reduction for flow regulation and increase in lamination

In this section, we describe the decision subtree after the branch denoted by ‘RESERVOIR OPERATION RULES’ in Figure 9. This subtree is reported in Figure 12. Two possible configurations L0 and L1 can be selected, as detailed in Table 4. They are both characterized by the reduction of regulation capacity and maximum storage level at 162 m a.s.l.
Figure 12

The subtree with storage level reduction.

Figure 12

The subtree with storage level reduction.

Close modal

The decision subtree starts from node A″ at the time t = 0 and splits up into two possible paths: Configuration L0 in golden colour and Configuration L1 in blue. If Configuration L1 is selected, one moves directly to the end of the time horizon at year t = 100 with a final value of the net benefit equal to 54.43 M€. If Configuration L0 is selected, one moves along the golden branch to the event node B′. In case of a higher budget, one moves to node C′, where the maximum benefit is 66.06 M€ if configuration L0 is kept.

If a constant budget is observed, the only possible decision at year t = 10 is to keep Configuration L0. After 20 years, the uncertain budget is described by node E′. One moves to node in case of low budget and node F′ in case of high budget.

The optimal path in the case of storage level reduction is reported in Figure 13. The optimal value of the expected net benefit is 66.33 M€.
Figure 13

Optimal paths on the DT with storage level reduction.

Figure 13

Optimal paths on the DT with storage level reduction.

Close modal

Since , it is clearly recommended to decrease the maximum storage level for flow regulation and increase the peak lamination instead of making infrastructural works in case of the maximum storage level.

This article investigated the integration of a DT into a CBA to prescribe optimal decisions for the planning of flood risk mitigation.

The analysis starts from a classical CBA for optimizing the net value of expected benefits, which was chosen as the decision criterion. However, this CBA is made under the unrealistic assumption of knowing which uncertain parameter will be observed in a long-term planning horizon.

This drawback can be removed by the introduction of DTs in the CBA. More precisely, the article investigated the introduction of uncertainty on budget availability by the probability of funding each configuration in the time horizon. The optimization criterion of the proposed DT was the maximization of expected net benefit and accounts for construction costs, operation, maintenance, and replacement costs. Moreover, this article introduced deficit penalties in the case of operation rules changing water availability for users, as well as additional penalties when constructions are not made, even if funds could be available.

The proposed methodology was tested on a real case study of the Coghinas River floodplain, which is in the north of Sardinia (Italy). Mitigation actions were clustered into different configurations by merging different works along the river in a fixed horizon of 100 years.

The optimal solution was determined by folding back the DT, which maximizes the expected value of the selected criterion (in this case the NPV). The proposed methodology shows that net benefits due to operation rules are much higher than those related to structural solutions. This outcome depends on the higher amount of expected benefit per year due to the substantial reduction of expected flood damages, in the case of a reasonable reduction in the fulfilment of users' water demands.

Although the integration of CBAs and DTs can be supportive for regional authorities to optimally decide on flood risk mitigation works by measurable financial metrics, some limitations still exist in the use of CBA. On the one hand, European norms, requiring the use of monetary metrics, are very common in practice. On the other hand, CBA requires all costs and benefits to be quantified in monetary terms, which is not always possible. However, this is not a limitation for the use of DTs, which can be built by any metric chosen by the decision-maker. Moreover, the integration of the CBA into a DT leads to risk-neutral decisions, but they can be properly corrected by decision-makers selecting suboptimal branches at decision nodes.

A promising research avenue is the integration of utility analysis into the DTs, to account for unmeasurable costs and consequences of the decision (e.g., directed intangible damages). Indeed, DTs leave freedom on the choice to be optimized. Moreover, future research developments may address decision-making under uncertainty on water level variations in the reservoirs due to climate change.

This study was supported by the Italian Ministry of the Environment and Protection of the Territory and the Sea, Project RIDES-IDRO.

This paper is dedicated to the memory of our colleague and friend Giovanni Maria Sechi, who sadly passed away a few days before its acceptance. Jacopo and Massimo will remember him as an enthusiastic researcher and a very kind person, a pleasure to work with and spend free time with.

All relevant data are included in the paper or its Supplementary Information.

The authors declare there is no conflict.

Albano
R.
,
Mancusi
L.
&
Abbate
A.
2017
Improving flood risk analysis for effectively supporting the implementation of flood risk management plans: The case study of ‘Serio’ valley
.
Environmental Science & Policy
75
,
158
172
.
https://doi.org/10.1016/j.envsci.2017.05.017
.
Amadio
M.
,
Mysiak
J.
,
Carrera
L.
&
Koks
E.
2016
Improving flood damage assessment models in Italy
.
Natural Hazards
82
,
2075
2088
.
https://doi.org/10.1007/s11069-016-2286-0
.
ARDIS
.
2014
Piano di Gestione del rischio alluvioni, Hydrographic District – Regional Board of Sardinia, Cagliari. http://www.regione.sardegna.it/autoritadibacino/pianificazione.
Bertsimas
D.
&
Freund
R. M.
2004
Data, Models and Decisions. Dynamic ideas
.
Bos
F.
&
Zwaneveld
P.
2017
Cost-benefit analysis for flood risk management and water governance in The Netherlands: An overview of one century
.
CPB Background Document.
http://dx.doi.org/10.2139/ssrn.3023983
.
Di Francesco
M.
,
Napolitano
J.
&
Sechi
G. M.
2021
A decision tree for a cost-benefit analysis on flood risk management with uncertain funding
.
Computational Science and its Applications – ICCSA
2021
,
513
525
.
https://doi.org/10.1007/978-3-030-87010-2_38
.
Dutta
D.
,
Herath
S.
&
Musiake
K.
2003
A mathematical model for flood loss estimation
.
The Journal of Hydrology
277
,
24
49
.
https://doi.org/10.1016/S0022-1694(03)00084-2
.
European Commission
.
2007
EU directive 2007/60 on the assessment and management of flood risks
.
Official Journal of the European Union.
https://eur-lex.europa.eu/legal-content/EN/TXT/HTML/?uri=CELEX:32007L0060.
Frongia
S.
,
Liberatore
S.
&
Sechi
G. M.
2015
Flood damage risk assessment optimizing a flood mitigation system
. In:
Proceedings of 9th EWRA Conference, Istanbul
.
Frongia
S.
,
Ruiu
A.
&
Sechi
G. M.
2018
Evaluation of water depth-damage functions in built-up areas in Sardinia (Italy)
.
Water Utility J
20
,
37
48
.
Gissing
A.
&
Blong
R.
2004
Accounting for variability in commercial flood damage estimation
.
Australian Geographic
35
(
2
),
209
222
.
https://doi.org/10.1080/0004918042000249511
.
Haddad
O. B.
,
Ashofteh
P. S.
&
Mariño
M. A.
2015
Retracted: Levee layouts and design optimization in protection of flood areas
.
Journal of Irrigation and Drainage Engineering
141
(
8
).
https://doi.org/10.1061/(ASCE)IR.1943-4774.0000864
.
Huizinga
H. C.
2007
Flood Damage Functions for EU Member States – JRC-Institute for Environment and Sustainability – HKV Consultants Report
.
Huizinga
J.
,
De Moel
H.
&
Szewczyk
W.
2017
Global Flood Depth-Damage Functions: Methodology and the Database With Guidelines (No. JRC105688)
.
Publications Office of the European Union, Luxembourg
.
doi: 10.2760/16510, JRC105688
.
Jongman
B.
,
Kreibich
H.
,
Apel
H.
,
Barredo
J. I.
,
Bates
P. D.
,
Feyen
L.
,
Gericke
A.
,
Neal
J.
,
Aerts
J. C. J. H.
&
Ward
P. J.
2012
Comparative flood damage model assessment: Towards a European approach
.
Natural Hazards and Earth System Sciences
12
,
3733
3752
.
https://doi.org/10.5194/nhess-12-3733-2012
.
Kind
J.
,
Wouter Botzen
W. J.
&
Aerts
J. C.
2017
Accounting for risk aversion, income distribution and social welfare in cost-benefit analysis for flood risk management
.
Wiley Interdisciplinary Reviews: Climate Change
8
(
2
),
e446
.
https://doi.org/10.1002/wcc.446
.
Loucks
D. P.
&
Van Beek
E.
2017
Water Resource Systems Planning and Management
.
Springer, Berlin
.
Martínez-Gomariz
E.
,
Forero-Ortiz
E.
,
Guerrero-Hidalga
M.
,
Castán
S.
&
Gómez
M.
2020
Flood depth‒damage curves for Spanish urban areas
.
Sustainability
12
(
7
),
2666
.
https://doi.org/10.3390/su12072666
.
Mechler
R. J. H. E. W. A. C. N.
,
Czajkowski
J.
,
Kunreuther
H.
,
Michel-Kerjan
E.
,
Botzen
W.
,
Keating
A.
,
McQuistan
C.
,
Cooper
N.
&
O'Donnell
I.
2014
Making Communities More Flood Resilient: The Role of Cost Benefit Analysis and Other Decision-Support Tools in Disaster Risk Reduction. White Paper, Zurich Flood Resilience Alliance (9 September 2014)
.
Molinari
D.
,
Dazzi
S.
,
Gattai
E.
,
Minucci
G.
,
Pesaro
G.
,
Radice
A.
&
Vacondio
R.
2021
Cost-benefit analysis of flood mitigation measures: A case study employing high-performance hydraulic and damage modelling
.
Natural Hazards
108
(
3
),
3061
3084
.
https://doi.org/10.1007/s11069-021-04814-6
.
Napolitano
J.
,
Di Francesco
M.
&
Sechi
G. M.
2022
Integrated Cost-Benefit Analysis and Perscriptive Decision Tree Model for a Flood Risk Management Problem
. In:
39th IAHR World Congress
.
doi:10.3850/IAHR-39WC2521716X20221755
.
Nas
T. F.
1996
Cost-benefit Analysis: Theory and Application
.
Sage
,
Thousand Oaks, CA
.
Pesaro
G.
,
Mendoza
M. T.
,
Minucci
G.
&
Menoni
S.
2018
Cost-benefit analysis for non-structural flood risk mitigation measures: Insights and lessons learnt from a real case study
. In:
Safety and Reliability – Safe Societies in A Changing World
(Haugen, S., Barros, A., Gulijk, C., Kongsvik, T. & Vinnem, J. E., eds.). Taylor & Francis, London.
Pistrika
A.
,
Tsakiris
G.
&
Nalbantis
I.
2014
Flood depth-damage functions for built environment
.
Environmental Processes
1
(
4
),
553
572
.
https://doi.org/10.1007/s40710-014-0038-2
.
Poljanšek
K.
,
Ferrer, M. M., De Groeve, T. & Clark, I.
European Commission, Joint Research Centre
(
2017
)
Science for disaster risk management 2017: Knowing better and losing less. European Commission Joint Research Centre, Brussels. https://data.europa.eu/doi/10.2788/842809.
Price
R. K.
&
Vojinovic
Z.
2008
Urban flood disaster management
.
Urban Water Journal
5
(
3
),
259
276
.
https://doi.org/10.1080/15730620802099721
.
Ramirez
J.
,
Adamowicz
W. L.
,
Easter
K. W.
&
Graham-Tomasi
T.
1988
Ex post analysis of flood control: Benefit–cost analysis and the value of information
.
Water Resources Research
24
(
8
),
1397
1405
.
https://doi.org/10.1029/WR024i008p01397
.
RAS
.
2006
Piano Stralcio di Bacino Regionale per l'Utilizzo delle Risorse Idriche (Report on Water Resource Management for the Sardinian Region)
.
Regione Autonoma della Sardegna
,
Italy
.
Scawthorn
C.
,
Flores
P.
,
Blais
N.
,
Seligson
H.
,
Tate
E.
,
Chang
S.
,
Mifflin
E.
,
Thomas
W.
,
Murphy
J.
,
Jones
C.
&
Lawrence
M.
2006
HAZUS-MH flood loss estimation methodology
.
II. Damage and Loss Assessment. Natural Hazards Review
7
(
2
),
72
81
.
10.1061/ASCE1527-698820067:272
.
Sechi
G. M.
,
Zuddas
P.
,
2000
WARGI: Water resources system optimization aided by graphical interface
. In:
Hydraulic Engineering Software
(
Blain
W. R.
&
Brebbia
C. A.
, eds).
WITPress
,
Southampton, UK
, pp.
109
120
.
Shreve
C. M.
&
Kelman
I.
2014
Does mitigation save? Reviewing cost-benefit analyses of disaster risk reduction
.
International Journal of Disaster Risk Reduction
10
,
213
235
.
https://doi.org/10.1016/j.ijdrr.2014.08.004
.
Sulis
A.
&
Sechi
G. M.
2013
Comparison of generic simulation models for water resource systems
.
Environmental Modelling & Software
40
,
214
225
.
DOI: 10.1016/j.envsoft.2012.09.012
.
Sulis
A.
,
Frongia
S.
,
Liberatore
S.
,
Zucca
R.
&
Sechi
G. M.
2020
Combining water supply and flood control purposes in the Coghinas Basin (Sardinia, Italy)
.
International Journal of River Basin Management
18
(
1
),
13
22
.
https://doi.org/10.1080/15715124.2018.1476366
.
Woodward
M.
,
Gouldby
B.
,
Kapelan
Z.
&
Hames
D.
2014
Multiobjective optimization for improved management of flood risk
.
Journal of Water Resource Planning and Management
140
(
2
).
https://doi.org/10.1061/(ASCE)WR.1943-5452.0000295
.
This is an Open Access article distributed under the terms of the Creative Commons Attribution Licence (CC BY 4.0), which permits copying, adaptation and redistribution, provided the original work is properly cited (http://creativecommons.org/licenses/by/4.0/).