China recently commenced the Sponge City initiative for the effective management of urban stormwater runoff. Numerous studies have been carried out to evaluate the cost-effectiveness of low impact development (LID) practices in Sponge City planning and implementation. However, most of the studies were at the site- or subcatchment scale, and few were conducted at the watershed scale, given the dramatically increased routing complexity and number of decision variables. This study demonstrates the cost-effective Sponge City planning process for a 25.90 km2 high-plateau watershed in southwest China. The Stormwater Management Model was coupled with the System for Urban Stormwater Treatment and Analysis Integrated (SUSTAIN) model to perform both continuous simulations and watershed-level optimization analyses, using the reduction of 85% annual runoff volume as the optimization target. Based on over 11,000 optimization runs, a near-optimal aggregated LID scenario was identified for each subcatchment. The aggregated LID size was first converted into a generic LID storage volume for individual subcatchments, and the storage volume was then disaggregated into site-level LID layouts regarding specific site conditions. The disaggregated LID layout yielded an annual average runoff volume reduction of 87.61% and close to 85% reduction for the annual average total suspended solids, total nitrogen, and total phosphorus loads. The systematic approach outlined in this study could be used for watershed-level Sponge City planning and implementation analyses in other cities.

Urbanization converts the natural landscape into impervious surfaces and adversely alters the hydrologic cycle, resulting in increased peak flow rates, runoff volume, and pollutant load, as well as decreased groundwater infiltration (Schueler 1994; USEPA 2000; Pauleit et al. 2005; Ahiablame et al. 2012; Kourtis et al. 2018; LeBleu et al. 2019; Li et al. 2019). Traditional stormwater management relies on gray infrastructures to remove runoff from a site as quickly as possible and then stores it at downstream facilities for slow release (USEPA 2000; Cembrano et al. 2004; Li et al. 2018a, 2018b; Mei et al. 2018). Stressors of chemical contaminants, increased temperature, and prolonged flush on stream banks cause the unsustainable ‘urban stream syndrome’, which is characterized by the degradation of urban waterway ecological processes and benefits (Hatt et al. 2004; Rosenberg et al. 2010; Hanak & Lund 2012; Booth et al. 2015; Du et al. 2017).

Low impact development (LID) represents a paradigm shift in stormwater control, as it seeks to preserve the pre-development hydrology using decentralized, microscale control measures (Baek et al. 2015). Commonly used LID practices include bioretention, grass swales, porous pavement, and green roofs (Roy et al. 2008; Newcomer et al. 2014; Shao et al. 2018). In the UK, a similar framework of sustainable urban drainage systems was used to address water pollution and flood hazards (Fletcher et al. 2014). Australia, in the meantime, proposed water sensitivity urban design to protect degrading urban water resources through a range of practices, including stormwater recycling and reuse, and the goal is to make cities more sustainable, livable, and resilient (Brown et al. 2009; Ashley et al. 2013).

In rapidly urbanizing China, urban flooding, the deterioration of surface water quality, urban heat island impacts, as well as climate change pose substantial challenges to stormwater management (Li et al. 2004; Wang et al. 2008; Piao et al. 2010; Randall et al. 2019). Studies of the LID framework and other stormwater management approaches lead up to the ‘Sponge City’ initiative in 2014, and the goal was to use green infrastructures (GIs) to achieve sustainable stormwater management (MOHURD 2014). A total of 30 cities were chosen as pilot Sponge Cities by 2016, and the central government allocated $6.35 billion to promote the Sponge City initiative (Randall et al. 2019). The goal was to achieve at least 70% of annual runoff volume control and to implement Sponge City designs in at least 80% of the developed areas by 2030 (MOHURD 2014; Jiang et al. 2017).

The Sponge City program is still at its early stage, and studies have been carried out to evaluate the Sponge City planning and implementation processes. For example, Gao et al. (2015) conducted cost-effective analyses for LID implementation at an industrial site in Ma'anshan, northeastern China, using 1-year rainfall. Mao et al. (2017) used the aggregated LID representations to identify the cost-effective LID implementation scheme in the 22 km2 Foshan New City in southern China, in which the site-level LID layouts were simplified into four generic aggregated LID representations and the decision variables were the number of aggregated LIDs. Li et al. (2018a, 2018b) conducted a cost-effective analysis for LID layout planning in a 0.03 km2 technology innovation park site in Lincang, southwestern China, using 10-year continuous simulations. Mei et al. (2018) analyzed 15 synthesized GI scenarios in a 651.80 km2 watershed near Beijing in northern China for flood mitigation, and six design rainfall events with recurrence intervals ranging from 2 to 100 years were analyzed. Li et al. (2018a, 2018b) conducted an optimization analysis of LID implementation in a 0.24 km2 watershed in Shenyang, northeastern China, and three levels (maximum, economic, and Sponge City) of simplified LID implementation scenarios were evaluated for optimal annual runoff volume control. Similarly, Randall et al. (2019) evaluated three levels (low, middle, and high) of aggregated LID implementation schemes in a 133 km2 watershed in Beijing.

Existing studies reveal unique challenges facing the development of a systematic strategy for Sponge City planning and implementation. At one hand, site- or subcatchment-scale analyses are needed in matching LID site requirements with unique site characteristics such as soil, land use, slope, and groundwater level (Jia et al. 2012; Cano & Barkdoll 2017; Li et al. 2018a, 2018b). On the other hand, the dramatically increased number of decision variables and the complexity of the flow routing scheme at the watershed scale render optimization analysis computationally unfeasible, even though the cost-effectiveness analysis is essential to robust decision-making (Ahiablame et al. 2013; Riverson et al. 2014; Martin-Mikle et al. 2015; Xie et al. 2017). As a result, most of the existing studies were either conducted at the site- or subcatchment scale using high-resolution models (Qin et al. 2013; Baek et al. 2015; Gao et al. 2015; Jia et al. 2015; Li et al. 2018a, 2018b) or were conducted at the watershed scale using the simplified representation of LID implementation schemes, mostly coupled with design storm analyses to further reduce the optimization run time (Palla & Gnecco 2015; Mao et al. 2017; Mei et al. 2018; Randall et al. 2019).

Modeling tools are necessary when assessing hydrologic and water quality benefits from LID implementations (Lee et al. 2012; Kong et al. 2017). Example models include the Soil Water Assessment Tool (Arnold et al. 2012), Model for Urban Sewers (MOUSE) (DHI 2002), Model for Urban Stormwater Improvement Conceptualization (MUSIC) (Wong et al. 2002), Stormwater Management Model (SWMM) (Rossman 2005), and System for Urban Stormwater Treatment and Analysis Integrated (SUSTAIN) (USEPA 2011). Among the models, SWMM and SUSTAIN are both in the public domain and are specifically developed for urban stormwater assessments. The two models have been applied worldwide in many stormwater management decision-support studies and have been calibrated and validated in different climate and geohydrological regions (Elliott & Trowsdale 2007; Lee et al. 2012; Joksimovic & Alam 2014; Gao et al. 2015; Jia et al. 2015; Mao et al. 2017; Li et al. 2018a, 2018b; Randall et al. 2019).

This study proposes a comprehensive approach that bridges the watershed-scale optimization analysis with site-scale implementation for the Sponge City planning analysis. The objectives of this study are to: (1) evaluate pre- and post-development runoff conditions at the watershed scale using the SWMM; (2) use the SUSTAIN model to perform the watershed-scale optimization of LID implementation using aggregated LID representation and to obtain the near-optimal aggregated LID sizes for each subcatchment. The near-optimal LID storage volume is then calculated for each subcatchment using the effective depth and the total area of the aggregated LID (i.e. bioretention area); (3) disaggregate the near-optimal LID storage volume for each subcatchment into the site-specific LID layout with regard to unique site characteristics; and (4) re-evaluate the watershed-scale hydrologic and water quality benefits using site-scale representations of disaggregated LIDs and verify both the hydrologic and water quality control benefits from the Sponge City implementation.

Study area

The case study watershed, Haidong New District (HND), is located in Dali Prefecture, Yunnan Province, southwest China (25°39′00″–25°42′15″N, 100°16′07″–100°20′36″W) (Figure 1). The watershed area is 2,590 ha, characterized with the hilly karst landscape. The elevation difference between the highest (2,164 m) and lowest points (1,965 m) in the watershed is about 200 m (Figure 2(a)), and the average slope is about 15.1% (Figure 2(b)). When stormwater runoff from the watershed directly drains to the Erhai Lake, the water quality of which remains Class II of the National Surface Water Quality Standards in recent years (Class I being the best): The HND watershed is being rapidly developed from the current natural landscape into a new urban district, with a target imperviousness of 52.87% (Figure 3). Comparisons of the existing pre-development land use and the target post-development land-use compositions are summarized in Table 1. According to the Sponge City Construction Technology Guide, Dali is located in Zone II, where the annual average runoff volume control target is specified as 80–85% (MOHURD 2014).

Table 1

Pre- and post-development land-use compositions in the HND watershed

Land-use categoryPre-development
Post-development
Area (ha)Percentage (%)Area (ha)Percentage (%)
Residential 132.68 5.12 682.52 26.35 
Commercial 253.11 9.77 
Industrial 140.74 5.42 
Cultural 293.32 11.33 
Greenland 2,158.25 81.79 948.56 36.62 
Waters 8.21 0.32 21.03 0.83 
Farmland 330.86 12.77 
Total 2,590 100 2,590 100 
Land-use categoryPre-development
Post-development
Area (ha)Percentage (%)Area (ha)Percentage (%)
Residential 132.68 5.12 682.52 26.35 
Commercial 253.11 9.77 
Industrial 140.74 5.42 
Cultural 293.32 11.33 
Greenland 2,158.25 81.79 948.56 36.62 
Waters 8.21 0.32 21.03 0.83 
Farmland 330.86 12.77 
Total 2,590 100 2,590 100 
Figure 1

Location of the HND at Dali Prefecture, Yunnan Province, China.

Figure 1

Location of the HND at Dali Prefecture, Yunnan Province, China.

Close modal
Figure 2

(a) Elevation in the HND watershed and (b) slope in the HND watershed.

Figure 2

(a) Elevation in the HND watershed and (b) slope in the HND watershed.

Close modal
Figure 3

(a) Pre-development land uses in the HND watershed and (b) post-development land uses in the HND watershed.

Figure 3

(a) Pre-development land uses in the HND watershed and (b) post-development land uses in the HND watershed.

Close modal

The HND watershed has the subtropical monsoon climate, with an annual average rainfall depth of 620 mm and an annual average temperature of 15.6 °C. Over 80% of the annual rainfall occurs between May and October. Soils on the hilltops and hillslopes (slopes greater than 25%) are mostly weathered limestones with good drainage, and soils in valley areas (slopes less than 8%) of low elevations are typically loamy soils with poor drainage and a high groundwater table. With its close vicinity to the Erhai Lake, stormwater runoff from the post-development HND watershed is of grave concern to local authorities. The implementation of the Sponge City framework in the HND watershed is not only important to the protection of the Erhai Lake but also serves as an example for other urbanizing watersheds that are close to lakes or reservoirs.

Using the digital elevation model data, natural ditches, as well as the stormwater pipe network information, the HND watershed is divided into 76 subcatchments (Figure 4(a)), with an average subcatchment area of 34.08 ha.

Figure 4

(a) Subcatchment delineation in the HND watershed and (b) the HND SWMM model.

Figure 4

(a) Subcatchment delineation in the HND watershed and (b) the HND SWMM model.

Close modal

The USEPA SWMM

The USEPA SWMM, Version 5.1 (Rossman 2005) is used to simulate the pre- and post-development runoff conditions from the HDN watershed. The SWMM is a dynamic hydrological/hydraulic model that simulates the rainfall-runoff, infiltration, evaporation, and flow routing processes, and it is also capable of simulating the pollutant buildup and washoff processes. The rainfall-runoff process in the SWMM is based on the nonlinear reservoir representation:
(1)
where d is the water depth (m), t is the time (s), k is the unit constant (1 for metric, 1.49 for English units), W is the subcatchment width (m), A is the subcatchment area (m2), n is Manning's roughness coefficient, ie is the rainfall excess (m/s), dp is the depth of depression storage (m), and S is the subcatchment slope (m/m).

The HND SWMM consists of 182 conduits, 189 junctions, and 4 outlets (Figure 4(b)). For the purposes of evaluating the runoff conditions from the whole HND watershed, a virtual outlet is used to collect runoff from the four individual outlets. Default SWMM parameter values for the HND watershed are summarized in Table 2.

Table 2

Default SWMM parameter values for the HND watershed

ParameterUnitsRangeParameterUnitsRange
Area ha 7.46–186.5 Ds-Imperv mm 2.54 
Width 273.1–1,365.6 Ds-Perv mm 6.51 
%Imperv 5–83 Max.Infil mm/h 337.06 
N-Imperv – 0.015 Min.Infil mm/h 8.64 
N-Perv – 0.2 %PerctZero 25 
ParameterUnitsRangeParameterUnitsRange
Area ha 7.46–186.5 Ds-Imperv mm 2.54 
Width 273.1–1,365.6 Ds-Perv mm 6.51 
%Imperv 5–83 Max.Infil mm/h 337.06 
N-Imperv – 0.015 Min.Infil mm/h 8.64 
N-Perv – 0.2 %PerctZero 25 

%Imperv: percentage of imperviousness; N-Imperv: Manning's for impervious surfaces; N-Perv: Manning's n or pervious surfaces; Ds-Imperv: depression storage for impervious surfaces; Ds-Perv: depression storage for pervious surfaces; %PerctZero: percentage of impervious surfaces with zero depression storage.

Calibration of the SWMM

After the HND SWMM was established, the model was calibrated against monitored data. Currently, the HND watershed is still under rapid development, and runoff data were collected from a monitoring station in Subcatchment #7 (Figure 5(a)). Runoff and water quality (total suspended solids (TSS), total nitrogen (TN), and total phosphorus (TP)) samples from two rainfall events, 03 August 2018 (with a total rainfall depth of 19.2 mm) and 22 August 2018 (with a total rainfall depth of 27.18 mm), were collected.

Figure 5

(a) Current land uses in Subcatchment #7 and the location of the monitoring station and (b) detailed delineation and SWMM setup in Subcatchment #7.

Figure 5

(a) Current land uses in Subcatchment #7 and the location of the monitoring station and (b) detailed delineation and SWMM setup in Subcatchment #7.

Close modal

Subcatchment #7 is the campus of a vocational school and has a total area of 40.71 ha (Figure 5(a)). The land-use compositions for the subcatchment are summarized in Table 3. In order to assist with the calibration process, Subcatchment #7 is further delineated with regard to individual land-use types and the flow is routed according to the elevation and stormwater pipe network (Figure 5(b)).

Table 3

Land-use compositions in Subcatchment #7

Land useArea (ha)Percentage (%)
Road 4.91 23.23 
Rooftop 5.26 24.88 
Urban pervious 9.57 45.27 
Natural lawn 1.40 6.62 
Total 21.14 100 
Land useArea (ha)Percentage (%)
Road 4.91 23.23 
Rooftop 5.26 24.88 
Urban pervious 9.57 45.27 
Natural lawn 1.40 6.62 
Total 21.14 100 

The calibration process follows the procedure used in other SWMM calibration studies (Barco et al. 2008; Rabori et al. 2017). For each calibration run, hydrologic calibration parameters (i.e. depression storage, Manning's roughness coefficient, and the percentage of imperviousness with zero storage (%PerctZero)) were first adjusted to achieve a satisfactory match between the predicted and measured hydrographs. Then, the water quality parameters (i.e. maximum pollutant buildup, rate constant, washoff coefficient, and washoff exponent) were adjusted to match the predicted and measured pollutographs. Water quality calibration was carried out for TN and TP.

Model performance evaluation was assessed with the Nash–Sutcliffe coefficient (RNS), and it provides a comparison between the efficiency of the chosen model and a description of the data as the mean of the observations. The optimal simulation value occurs when RNS is close to 1, and the value is usually considered as acceptable model performance when RNS is greater than 0.5 (Moriasi et al. 2007; Li et al. 2016). The RNS is formulated as follows:
(2)
where is the observed value at time t, is the simulation value at time t, is the average observed value, t is the time, and n is the total number of time steps.

Time series generation through the SWMM

The calibrated SWMM parameters were used to generate hydrologic and water quality runoff time series from individual land-use types. An SWMM consisting of unit areas of each land-use type was created. The daily evaporation data and hourly rainfall data from the nearby rainfall station for the period of 01 January 2011 to 31 December 2017 were used for generating runoff time series. Rainfall and evaporation data for the HND watershed for the period of 01 January 2011 to 31 May 2013 are shown in Figure 6. Continuous runoff time series were generated for land-use types of natural lawn, transportation, urban pervious areas, and urban impervious areas. The runoff time series were then used as an input to the SUSTAIN model using the external simulation option.

Figure 6

Rainfall and evaporation data for the HND watershed for the period of 01 January 2011 to 31 May 2013.

Figure 6

Rainfall and evaporation data for the HND watershed for the period of 01 January 2011 to 31 May 2013.

Close modal

Typical LID designs and unit costs

Typical LID design parameters and unit costs of commonly used LIDs were retrieved from the Sponge City Technical Guidance published by the MOHURD (2014). LID design parameter values and unit costs are summarized in Table 4, and the site requirements for LIDs are summarized in Table 5. The design parameters used for the LID implementation scenario setup in the HND SUSTAIN model are also shown in Table 4.

Table 4

Typical design parameter values and unit costs of commonly used LIDs (MOHURD 2014)

LIDsSurface storage depth (m) (value used)Soil/gravel layer thickness (m) (value used)Porosity (%) (value used)Effective depth (m)Unit cost ($/m2)
Green roof 0.02 0.2–0.4(0.4) 30–40(35) 0.16 35 
Porous pavement 0.006 0.3–0.9(0.8) 40–60(55) 0.45 30–35 
Bioretention 0.15–0.3(0.2) 0.3–1.2(1.0) 30–40(35) 0.55 90–110 
Dry/wet pond 0.8–2.5(0.8) – 100 0.8 80 
Grass swale 0.1–0.2 (0.15) 0.2–0.6 (0.3) 30–40(35) 0.26 15–25 
LIDsSurface storage depth (m) (value used)Soil/gravel layer thickness (m) (value used)Porosity (%) (value used)Effective depth (m)Unit cost ($/m2)
Green roof 0.02 0.2–0.4(0.4) 30–40(35) 0.16 35 
Porous pavement 0.006 0.3–0.9(0.8) 40–60(55) 0.45 30–35 
Bioretention 0.15–0.3(0.2) 0.3–1.2(1.0) 30–40(35) 0.55 90–110 
Dry/wet pond 0.8–2.5(0.8) – 100 0.8 80 
Grass swale 0.1–0.2 (0.15) 0.2–0.6 (0.3) 30–40(35) 0.26 15–25 
Table 5

Site requirements for different LID practices (Cheng et al. 2009)

LIDsDrainage slope (%)Drainage area (ha)Imperviousness (%)Buffer to roads (m)
Green roof – – >0 – 
Porous pavement <1 <1.21 >0 – 
Bioretention <5 <0.81 >0 <30.5 
Rain barrel/cisterns – – >0 – 
LIDsDrainage slope (%)Drainage area (ha)Imperviousness (%)Buffer to roads (m)
Green roof – – >0 – 
Porous pavement <1 <1.21 >0 – 
Bioretention <5 <0.81 >0 <30.5 
Rain barrel/cisterns – – >0 – 

The USEPA SUSTAIN model

The USEPA SUSTAIN model (Version 1.2) is a public domain decision-support tool designed for the stormwater management study, planning, and design analysis (Lee et al. 2012). Using the non-dominated sorting genetic algorithm-II (NSGA-II) to perform the optimization analysis, the SUSTAIN model can identify cost-effective LID implementation scenarios at the site- and watershed-scale (USEPA 2011; Lee et al. 2012; Gao et al. 2015). The SUSTAIN model incorporates algorithms from the SWMM, Hydrological Simulation Program – Fortran, and Best Management Practice Decision-Support System, and the model consists of modules, including the BMP siting tool, land simulation module, BMP simulation module, BMP optimization module, and post-processing module (Cheng et al. 2009; USEPA 2011; Lee et al. 2012). SUSTAIN has a built-in representation for commonly used LIDs, including green roof, porous pavement, infiltration trench, the bioretention area, and wet pond, and runoff time series from various land uses could either be generated internally or developed externally (USEPA 2011; Lee et al. 2012; Li et al. 2018a, 2018b). Input parameters for typical LID practices are shown in Table 6.

Table 6

Input parameters for typical LID practices

ParameterGreen roofPorous pavementBioretentionDry/wet pondGrass swale
Length (m) Variable Variable Variable Variable Variable 
Width (m) 
Depth of depression (m) 0.15 0.05 0.6 2.5 0.4 
Weir height (m) 0.15 0.05 0.6 2.5 – 
Weir width (m) – 
Soil depth (m) 0.3 0.6 0.5 0.6 
Soil porosity 0.5 0.4 0.5 0.5 0.5 
Soil withering point 0.05 0.05 0.05 0.05 0.05 
Infiltration mode Holtan Holtan Holtan Holtan Holtan 
Vegetation parameters 0.6 0.6 0.6 0.6 0.6 
Soil saturated permeability (mm/h) 12 12 12 12 12 
ParameterGreen roofPorous pavementBioretentionDry/wet pondGrass swale
Length (m) Variable Variable Variable Variable Variable 
Width (m) 
Depth of depression (m) 0.15 0.05 0.6 2.5 0.4 
Weir height (m) 0.15 0.05 0.6 2.5 – 
Weir width (m) – 
Soil depth (m) 0.3 0.6 0.5 0.6 
Soil porosity 0.5 0.4 0.5 0.5 0.5 
Soil withering point 0.05 0.05 0.05 0.05 0.05 
Infiltration mode Holtan Holtan Holtan Holtan Holtan 
Vegetation parameters 0.6 0.6 0.6 0.6 0.6 
Soil saturated permeability (mm/h) 12 12 12 12 12 
In SUSTAIN, pollutant removal in LIDs is simulated in each time step using the first-order decay function, along with an optional background pollutant concentration:
(3)
where C* is the background pollutant concentration (mg/L), Cin is the input concentration (mg/L), Cout is the output concentration (mg/L), q is the hydraulic loading or overflow rate (m/yr), k′ = kh and is the rate constant (m/yr), k is the first-order decay rate (1/yr), and h is the pond depth (m).
Cost-effective analyses are performed in the SUSTAIN model after the user specifies the assessment point, and the optimization target could be annual average runoff volume reduction, peak flow exceedance frequency, or annual average load reduction. The multi-objective problem can be expressed as follows:
(4)
where Qmaxj1 and Qmaxj2 represent the lower and upper ranges of the annual average flow volume control targets, and Lmaxk1 and Lmaxk2 represent the lower and upper ranges of the annual average pollutant load control targets.

LID performance assessment and optimization through SUSTAIN

The SUSTAIN model was established to evaluate and optimize LID implementation scenarios in the HND watershed (Figure 7). Runoff time series from the HND SWMM were used following the external simulation option. In the watershed-scale SUSTAIN optimization setup, the bioretention area was used as the aggregated LID representation for each of the 76 subcatchments, and the optimization target was set to be 80% reduction of the annual average runoff volume. Using the aggregated LID representation was mainly to reduce the number of decision variables and the search space for the optimization analysis. Previous experiments have also shown that when the subcatchment area is 50 ha or less, the hydrologic and water quality simulation results between aggregated and distributed LID representations were less than 5% (USEPA 2009).

Figure 7

SUSTAIN model setup for the HND watershed.

Figure 7

SUSTAIN model setup for the HND watershed.

Close modal

The goal of the optimization analysis was to identify the lease-cost bioretention area sizes (in hectares) for each subcatchment while meeting the watershed-wide annual average runoff volume control target. Similar to the HND SWMM model setup, a virtual outlet was used to collect all the runoff from the post-development with the LID scenario watershed, and the virtual outlet was used as the assessment point in the SUSTAIN optimization analysis.

Decision variables for the HND LID implementation analysis are the sizes of the bioretention area (in hectares) in each subcatchment. According to previous studies, the upper bound of the bioretention area was set to be 15% of the impervious area in each subcatchment, beyond which the marginal returns of hydrologic and water quality benefits quickly decrease (Gilroy & McCuen 2009; Tetra Tech 2010; Eckart et al. 2017). For simplification purposes, the width of the bioretention area was arbitrarily set to be 3.05 m (10 ft), and the decision variable then became the length of the bioretention area in each subcatchment. A total of 100 size steps were used between the lower bound and the upper bound (Table 7) during the optimization analysis, and the search space was 10076 or 10152. The optimization process identifies the tradeoff between aggregated LID sizes (in hectares) in each subcatchment and the annual average runoff volume from the watershed.

Table 7

Lower and upper bounds of bioretention area lengths for the optimization analysis in the HND watershed (assuming a fixed bioretention width of 3.05 m)

SubcatchmentArea (ha)Imperv%Lower bound length (m)Upper bound length (m)Size step
HD_01 26.60 60.04 7,854 79 
HD_02 26.50 50.22 6,545 65 
HD_03 36.15 59.69 10,612 106 
HD_04 8.82 49.92 2,165 22 
HD_05 46.95 77.72 17,946 179 
HD_06 11.85 65.93 3,842 38 
HD_07 40.71 60.36 12,085 121 
HD_08 44.70 60.62 13,326 133 
HD_09 25.36 68.55 8,550 85 
HD_10 49.22 56.77 13,742 137 
HD_11 38.57 63.96 12,132 121 
HD_12 21.84 60.49 6,497 65 
HD_13 24.55 45.61 5,507 55 
HD_14 16.04 54.08 4,266 43 
HD_15 29.93 54.97 8,091 81 
HD_16 17.32 53.97 4,597 46 
HD_17 36.34 62.44 11,159 112 
HD_18 43.34 58.00 12,363 124 
HD_19 48.60 67.15 16,050 160 
HD_20 28.74 53.67 7,586 76 
HD_21 13.43 54.94 3,629 36 
HD_22 31.76 62.96 9,834 98 
HD_23 14.39 50.18 3,551 36 
HD_24 46.57 61.21 14,019 140 
HD_25 25.44 61.99 7,756 78 
HD_26 18.71 55.30 5,089 51 
HD_27 38.82 56.47 10,781 108 
HD_28 21.45 63.68 6,718 67 
HD_29 16.72 64.35 5,291 53 
HD_30 43.31 50.71 10,801 108 
HD_31 29.40 61.13 8,839 88 
HD_32 12.86 42.08 2,661 27 
HD_33 11.46 81.78 4,609 46 
HD_34 66.80 62.36 20,487 205 
HD_35 35.26 63.47 11,006 110 
HD_36 17.16 79.93 6,746 67 
HD_37 40.50 82.72 16,476 165 
HD_38 24.65 82.62 10,016 100 
HD_39 186.49 74.14 67,999 680 
HD_40 8.09 62.41 2,483 25 
HD_41 43.94 57.42 12,408 124 
HD_42 24.07 40.70 4,818 48 
HD_43 15.25 62.75 4,706 47 
HD_44 37.91 53.13 9,906 99 
HD_45 29.46 82.59 11,966 120 
HD_46 30.06 61.90 9,151 92 
HD_47 26.56 58.25 7,609 76 
HD_48 25.60 57.86 7,285 73 
HD_49 15.55 52.16 3,989 40 
HD_50 25.53 66.31 8,326 83 
HD_51 21.76 56.51 6,047 60 
HD_52 47.86 58.50 13,770 138 
HD_53 18.14 48.61 4,337 43 
HD_54 15.87 58.84 4,592 46 
HD_55 25.43 64.88 8,114 81 
HD_56 31.91 60.18 9,444 94 
HD_57 12.73 59.85 3,747 37 
HD_58 7.46 57.78 2,120 21 
HD_59 22.40 53.15 5,855 59 
HD_60 14.15 59.98 4,174 42 
HD_61 13.63 53.32 3,574 36 
HD_62 10.54 66.35 3,439 34 
HD_63 20.06 59.61 5,881 59 
HD_64 17.83 81.56 7,152 72 
HD_65 98.30 44.79 21,653 217 
HD_66 36.94 55.03 9,997 100 
HD_67 42.43 57.08 11,911 119 
HD_68 59.17 41.55 12,091 121 
HD_69 120.75 50.25 29,841 298 
HD_70 76.92 53.65 20,296 203 
HD_71 49.54 57.38 13,980 140 
HD_72 46.52 67.77 15,505 155 
HD_73 31.81 55.60 8,698 87 
HD_74 30.04 59.84 8,841 88 
HD_75 31.61 53.41 8,303 83 
HD_76 87.13 57.05 24,446 244 
SubcatchmentArea (ha)Imperv%Lower bound length (m)Upper bound length (m)Size step
HD_01 26.60 60.04 7,854 79 
HD_02 26.50 50.22 6,545 65 
HD_03 36.15 59.69 10,612 106 
HD_04 8.82 49.92 2,165 22 
HD_05 46.95 77.72 17,946 179 
HD_06 11.85 65.93 3,842 38 
HD_07 40.71 60.36 12,085 121 
HD_08 44.70 60.62 13,326 133 
HD_09 25.36 68.55 8,550 85 
HD_10 49.22 56.77 13,742 137 
HD_11 38.57 63.96 12,132 121 
HD_12 21.84 60.49 6,497 65 
HD_13 24.55 45.61 5,507 55 
HD_14 16.04 54.08 4,266 43 
HD_15 29.93 54.97 8,091 81 
HD_16 17.32 53.97 4,597 46 
HD_17 36.34 62.44 11,159 112 
HD_18 43.34 58.00 12,363 124 
HD_19 48.60 67.15 16,050 160 
HD_20 28.74 53.67 7,586 76 
HD_21 13.43 54.94 3,629 36 
HD_22 31.76 62.96 9,834 98 
HD_23 14.39 50.18 3,551 36 
HD_24 46.57 61.21 14,019 140 
HD_25 25.44 61.99 7,756 78 
HD_26 18.71 55.30 5,089 51 
HD_27 38.82 56.47 10,781 108 
HD_28 21.45 63.68 6,718 67 
HD_29 16.72 64.35 5,291 53 
HD_30 43.31 50.71 10,801 108 
HD_31 29.40 61.13 8,839 88 
HD_32 12.86 42.08 2,661 27 
HD_33 11.46 81.78 4,609 46 
HD_34 66.80 62.36 20,487 205 
HD_35 35.26 63.47 11,006 110 
HD_36 17.16 79.93 6,746 67 
HD_37 40.50 82.72 16,476 165 
HD_38 24.65 82.62 10,016 100 
HD_39 186.49 74.14 67,999 680 
HD_40 8.09 62.41 2,483 25 
HD_41 43.94 57.42 12,408 124 
HD_42 24.07 40.70 4,818 48 
HD_43 15.25 62.75 4,706 47 
HD_44 37.91 53.13 9,906 99 
HD_45 29.46 82.59 11,966 120 
HD_46 30.06 61.90 9,151 92 
HD_47 26.56 58.25 7,609 76 
HD_48 25.60 57.86 7,285 73 
HD_49 15.55 52.16 3,989 40 
HD_50 25.53 66.31 8,326 83 
HD_51 21.76 56.51 6,047 60 
HD_52 47.86 58.50 13,770 138 
HD_53 18.14 48.61 4,337 43 
HD_54 15.87 58.84 4,592 46 
HD_55 25.43 64.88 8,114 81 
HD_56 31.91 60.18 9,444 94 
HD_57 12.73 59.85 3,747 37 
HD_58 7.46 57.78 2,120 21 
HD_59 22.40 53.15 5,855 59 
HD_60 14.15 59.98 4,174 42 
HD_61 13.63 53.32 3,574 36 
HD_62 10.54 66.35 3,439 34 
HD_63 20.06 59.61 5,881 59 
HD_64 17.83 81.56 7,152 72 
HD_65 98.30 44.79 21,653 217 
HD_66 36.94 55.03 9,997 100 
HD_67 42.43 57.08 11,911 119 
HD_68 59.17 41.55 12,091 121 
HD_69 120.75 50.25 29,841 298 
HD_70 76.92 53.65 20,296 203 
HD_71 49.54 57.38 13,980 140 
HD_72 46.52 67.77 15,505 155 
HD_73 31.81 55.60 8,698 87 
HD_74 30.04 59.84 8,841 88 
HD_75 31.61 53.41 8,303 83 
HD_76 87.13 57.05 24,446 244 

Disaggregation of the near-optimal LID sizes to the site-scale layout

The SUSTAIN optimization analysis identifies the tradeoff between LID sizes and the annual average runoff volume reduction for the HND watershed. The near-optimal solution consists of aggregated LID sizes (in hectares) in each subcatchment. The composite LID sizes need to be disaggregated into the site-scale layout to assist with LID implementation. The disaggregation process in a subcatchment takes six steps:

  • (1)

    Identify the near-optimal LID size (in hectares), ALID, for the subcatchment from SUSTAIN optimization results;

  • (2)

    Calculate the effective LID volume for the subcatchment, Qe, by multiplying ALID with the effective depth (de-bioretention) of the bioretention area (from Table 4);

  • (3)

    Calculate the LID to the imperviousness ratio, R, by dividing the near-optimal LID size (ALID) with the total impervious area, AIMP-total, in the subcatchment;

  • (4)

    For each impervious land use in the subcatchment, assign a corresponding type of LID and then calculate the relative LID to the impervious ratio, Rr, by dividing the effective depth of the bioretention area (de-bioretention) with that of the chosen LID type;

  • (5)

    Calculate the LID area to the impervious area ratio for LIDs other than the bioretention area in the subcatchment as R*Rr;

  • (6)

    Implement site-scale LIDs following the LID area to the impervious area ratio of R*Rr for each piece of impervious land use.

The disaggregation steps can be further explained through an example. Suppose a subcatchment has 30 ha of impervious surfaces (AIMP-total) (roof, roads, parking lots, and public squares), and the near-optimal LID size (ALID) identified through SUSTAIN is 2.1 ha, resulting in a LID to imperviousness ratio R of 7%. Since the effective depth of the bioretention area (de-bioretention) is 0.55 m, that results in an effective LID value for the subcatchment (Qe) of 11,550 m3. Subsequent steps for site-level disaggregation are shown in Table 8.

Table 8

Disaggregation calculation of the near-optimal LID size in an example subcatchment

Impervious land useArea (ha)Assigned LID typeEffective depth (m)Relative depth ratio to bioretention (Rr)LID to impervious area ratio (R*Rr)LID area (m2)LID volume (m3)
Roof Green roof 0.16 3.44 24.08% 12,040 1,926.4 
Road Bioretention 0.55 7% 3,500 1,925 
Parking lot Bioretention 0.55 7% 2,800 1,540 
Porous pavement 0.45 1.22 8.54% 5,124 2,305.8 
Public square Bioretention 0.55 7% 4,900 2,695 
Dry pond 0.8 0.69 4.83% 1,449 1,159 
Total 30 – – – – 29,813 11,551.2 
Impervious land useArea (ha)Assigned LID typeEffective depth (m)Relative depth ratio to bioretention (Rr)LID to impervious area ratio (R*Rr)LID area (m2)LID volume (m3)
Roof Green roof 0.16 3.44 24.08% 12,040 1,926.4 
Road Bioretention 0.55 7% 3,500 1,925 
Parking lot Bioretention 0.55 7% 2,800 1,540 
Porous pavement 0.45 1.22 8.54% 5,124 2,305.8 
Public square Bioretention 0.55 7% 4,900 2,695 
Dry pond 0.8 0.69 4.83% 1,449 1,159 
Total 30 – – – – 29,813 11,551.2 

The example in Table 8 shows that the sum of the site-scale disaggregated LID area is 29,183 m2 (2.91 ha), and that is larger than the near-optimal LID size (ALID) for the subcatchment (2.1 ha). This is because the effective depths for green roof and porous pavement are less than those of the bioretention area, and thus larger LID areas are needed for the same LID volume. The LID to the impervious area ratio in Table 8 can be used for guiding site-scale LID implementations in individual subcatchments.

The disaggregation process also accounts for unique site conditions in the HND watershed and assigns site-scale LID types accordingly, with elevation and soil infiltration capacities being the two important factors considered. Subcatchments in the HND watershed are categorized into three elevation groups: low elevation (1,965 to 2,025 m), medium elevation (2,026 to 2,062 m), and high elevation (2,063 to 2,164 m). Previous field tests of infiltration rates indicate that subcatchments in the high- and medium-elevation groups, in general, have higher infiltration rates (e.g. larger than 230 mm/h) due to the weathered carbonate soils, and subcatchments in the low-elevation group have lower infiltration rates and a high groundwater table.

A typical site-scale layout of LID implementation in a high-elevation subcatchment is shown in Figure 8. As shown, green roofs are implemented on rooftops, and porous pavements are implemented for parking lots, sidewalks, and public squares. The runoff is then routed to bioretention areas through grass swales, and the overflow from bioretention areas is routed to downstream stormwater pipes and ditches. Runoff from nearby impervious surfaces, such as roads and public squares, can also be routed to grass swales and the bioretention area along the flow path. One special arrangement is that porous pavement, grass swale, and the bioretention area are all implemented with the lined bottom. This is to discourage infiltration at the high-elevation subcatchments, mainly to protect the stability of the karst topography.

Figure 8

Typical site-scale LID layout for a high-elevation subcatchment.

Figure 8

Typical site-scale LID layout for a high-elevation subcatchment.

Close modal

The LID site-scale layout for medium-elevation subcatchments is similar to that for the high-elevation subcatchments, with the difference being that no lined bottom is used for porous pavement, grass swale, and the bioretention area.

A typical site-scale LID layout for low-elevation subcatchments is shown in Figure 9. As shown, the routing schemes are similar to those for the medium-elevation subcatchments (porous pavement, grass swale, and the bioretention area without the lined bottom), except that dry/wet ponds are used at the downstream of the bioretention area. The detention/retention facilities could help further improve stormwater quality through the settling process, and the detained stormwater can also be used for municipal purposes (e.g. irrigation and sprinkling). Excess runoff from the dry/wet ponds is routed to stormwater pipes and eventually discharged into the Erhai Lake.

Figure 9

Typical site-scale LID layout for a low-elevation subcatchment.

Figure 9

Typical site-scale LID layout for a low-elevation subcatchment.

Close modal

Re-evaluation of site-scale hydrologic and water quality performances

After the watershed-scale near-optimal LID sizes were disaggregated into site-scale LID layouts for each subcatchment, continuous simulations were carried out for the time period of 01 January 2011 to 31 December 2017 in SUSTAIN to verify the LID implementation performances. The annual average runoff volume reduction and annual average pollutant load reduction percentages were evaluated against runoff conditions from the post-development HND watershed.

SWMM calibration

Hydrologic and water quality calibration results of Subcatchment #7 for the two monitored events are shown in Figures 10 and 11. The observed event mean concentrations (EMCs) for TSS, TN, and TP for the 03 August 2018 event are 75, 2.71, and 0.28 mg/L, respectively. The observed EMCs for TSS, TN, and TP for the 22 August 2018 event are 106, 4.06, and 0.55 mg/L, respectively. Hydrographs and pollutant time series from the calibrated SWMM overall match those from the observed values. Hydrologic and water quality parameters of the calibrated SWMM are summarized in Tables 9 and 10, respectively. The average runoff volume difference from the calibration is 14.76%, and the average EMC differences between the predicted and the observed values for TSS, TN, and TP are 10.69, −4.91, and 18.32%, respectively. The RNS of the two events for TSS, TN, and TP are 0.81, 0.65, 0.74 and 0.72, 0.58, 0.64, respectively. The calibration results indicated that the model structure and parameters matched the runoff-producing pattern and the calibrated SWMM were suitable for simulating runoff scenarios in the study area.

Table 9

Calibrated SWMM hydrologic parameters

Parameter nameUnitCalibrated values
N-Imperv – 0.013 
N-perv – 0.4 
Ds-Imperv mm 
Ds-perv mm 
%PerctZero 24 
Parameter nameUnitCalibrated values
N-Imperv – 0.013 
N-perv – 0.4 
Ds-Imperv mm 
Ds-perv mm 
%PerctZero 24 
Table 10

Calibrated SWMM water quality parameters

Land-use nameWater quality parametersUnitPollutants
TNTPTSS
Road Maximum buildup kg/ha 1.5 260 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.065 0.075 0.08 
Exponent – 1.6 1.9 1.75 
Rooftop Maximum buildup kg/ha 0.8 140 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.045 0.05 0.04 
Exponent – 1.1 0.9 0.8 
Urban pervious land Maximum buildup kg/ha 10 0.6 100 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.006 0.005 0.009 
Exponent – 1.25 1.1 1.25 
Natural lawn Maximum buildup kg/ha 0.1 200 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.015 0.01 0.02 
Exponent – 1.3 1.2 1.4 
Land-use nameWater quality parametersUnitPollutants
TNTPTSS
Road Maximum buildup kg/ha 1.5 260 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.065 0.075 0.08 
Exponent – 1.6 1.9 1.75 
Rooftop Maximum buildup kg/ha 0.8 140 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.045 0.05 0.04 
Exponent – 1.1 0.9 0.8 
Urban pervious land Maximum buildup kg/ha 10 0.6 100 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.006 0.005 0.009 
Exponent – 1.25 1.1 1.25 
Natural lawn Maximum buildup kg/ha 0.1 200 
Rate constant d−1 0.5 0.5 0.5 
Coefficient – 0.015 0.01 0.02 
Exponent – 1.3 1.2 1.4 
Figure 10

(a) Hydrologic calibration results of the 03 August 2018 event; (b) TSS calibration results of the 03 August 2018 event; (c) TN calibration results of the 03 August 2018 event and (d) TP calibration results of the 03 August 2018 event.

Figure 10

(a) Hydrologic calibration results of the 03 August 2018 event; (b) TSS calibration results of the 03 August 2018 event; (c) TN calibration results of the 03 August 2018 event and (d) TP calibration results of the 03 August 2018 event.

Close modal
Figure 11

(a) Hydrologic calibration results of the 22 August 2018 event; (b) TSS calibration results of the 22 August 2018 event; (c) TN calibration results of the 22 August 2018 event and (d) TP calibration results of the 22 August 2018 event.

Figure 11

(a) Hydrologic calibration results of the 22 August 2018 event; (b) TSS calibration results of the 22 August 2018 event; (c) TN calibration results of the 22 August 2018 event and (d) TP calibration results of the 22 August 2018 event.

Close modal

SUSTAIN optimization analysis

The optimization process was carried out between total LID sizes and the percentages of annual runoff volume reduction as compared to that of the post-development watershed. The tradeoff relationship from the optimization analysis is shown in Figure 12. The horizontal axis of the figure is the total area of LID, and the vertical axis is the percentage of runoff volume reduction as compared to the post-development watershed. Each dot in the figure represents an evaluated LID scenario (which consists of individual LID sizes from the 76 subcatchments) during the optimization process. A total number of 11,533 scenarios (dots) were evaluated, and the dash frontline formed by the dots in Figure 12 represents the Pareto front, which is the tradeoff relationship between total LID sizes and the percentage of runoff volume reduction for the HND watershed. According to the tradeoff curve, an annual runoff volume reduction of 80% corresponds to a total LID area of approximately 80 ha. Figure 12 also shows that for the same level of 80% runoff volume reduction, the LID area could be as much as 157 ha, almost doubling the near-optimal solution.

Figure 12

The tradeoff relationship between total LID areas and the annual runoff volume reduction percentages.

Figure 12

The tradeoff relationship between total LID areas and the annual runoff volume reduction percentages.

Close modal

The optimization results demonstrate the potential for the LID practices in mitigating the post-development runoff conditions. It is shown that with appropriate LID sizing, the annual average post-development runoff volume could be reduced by as much as 90% from the HND watershed. The tradeoff curve also shows that on the tradeoff curve, there exists a reflection point beyond which the marginal returns in runoff volume reduction starts to level off. Similar patterns are observed in many other LID implementation optimization studies as well (Baek et al. 2015; Mao et al. 2017; Li et al. 2018a, 2018b).

The optimization process demonstrates the high efficiency of the NSGA-II in identifying the tradeoff between the aggregated LID size and the percentage of annual average runoff volume reduction. The current search space for the HND watershed is 10152. However, if detailed site-scale LID representations were used, the computational cost for the optimization analysis would become too expensive using the NSGA-II approach. When the number of subcatchments or decision variable continues to increase, new optimization techniques combined with machine learning have to be explored (Yaseen et al. 2019).

The optimization of LID scenarios was carried out using the hourly runoff time series for the period of 01 January 2011 to 31 December 2017. In comparison to the design storm approach, the continuous simulation can represent the ponding, infiltration, and evaporation processes in LIDs, as well as the pollutant buildup, washoff, and first-order decay processes (Lee et al. 2012). Using such a detailed representation, the optimization framework is able to fully assess the cumulative hydrologic and water quality benefits from LID implementation under a wide range of weather conditions, rather than performing only flooding-related analysis (Baek et al. 2015).

Disaggregation of the near-optimal LID solution

The six-step methodology for disaggregating the watershed-scale near-optimal LID solution to site-scale layouts was applied to each of the 76 subcatchments. The effective LID volume, LID to imperviousness ratio, and relative LID to impervious ratio were estimated for each subcatchment and site-level impervious land use. Engineering judgments were made when necessary regarding slight adjustments of LID sizes to accommodate individual site characteristics. The disaggregated site-level LIDs in each subcatchment are summarized in Table 11.

Table 11

Disaggregated site-level LIDs in each subcatchment (LID areas are in ha)

SubcatchmentArea (ha)Imperv%Green roofPorous pavementBioretentionDry/wet pondGrass swale
HD_01 26.60 60.04 0.34 0.54 0.88 0.16 0.05 
HD_02 26.50 50.22 0.28 0.45 0.73 0.13 0.04 
HD_03 36.15 59.69 0.46 0.73 1.19 0.22 0.07 
HD_04 8.82 49.92 0.09 0.15 0.24 0.04 0.01 
HD_05 46.95 77.72 0.78 1.23 2.01 0.36 0.12 
HD_06 11.85 65.93 0.03 0.26 0.43 0.08 0.03 
HD_07 40.71 60.36 0.52 0.83 1.35 0.25 0.08 
HD_08 44.70 60.62 0.58 0.91 1.49 0.27 0.09 
HD_09 25.36 68.55 0.37 0.58 0.96 0.17 0.06 
HD_10 49.22 56.77 0.10 0.94 1.54 0.28 0.09 
HD_11 38.57 63.96 0.53 0.83 1.36 0.25 0.08 
HD_12 21.84 60.49 0.05 0.44 0.73 0.13 0.04 
HD_13 24.55 45.61 0.04 0.38 0.62 0.11 0.04 
HD_14 16.04 54.08 0.18 0.29 0.48 0.09 0.03 
HD_15 29.93 54.97 0.35 0.55 0.90 0.16 0.05 
HD_16 17.32 53.97 0.20 0.31 0.51 0.09 0.03 
HD_17 36.34 62.44 0.48 0.76 1.25 0.23 0.08 
HD_18 43.34 58.00 0.54 0.85 1.38 0.25 0.08 
HD_19 48.60 67.15 0.70 1.10 1.79 0.33 0.11 
HD_20 28.74 53.67 0.33 0.52 0.85 0.15 0.05 
HD_21 13.43 54.94 0.16 0.25 0.41 0.07 0.02 
HD_22 31.76 62.96 0.43 0.67 1.10 0.20 0.07 
HD_23 14.39 50.18 0.15 0.24 0.40 0.07 0.02 
HD_24 46.57 61.21 0.61 0.96 1.57 0.29 0.09 
HD_25 25.44 61.99 0.34 0.53 0.87 0.16 0.05 
HD_26 18.71 55.30 0.22 0.35 0.57 0.10 0.03 
HD_27 38.82 56.47 0.47 0.74 1.21 0.22 0.07 
HD_28 21.45 63.68 0.05 0.46 0.75 0.14 0.05 
HD_29 16.72 64.35 0.23 0.36 0.59 0.11 0.04 
HD_30 43.31 50.71 0.08 0.74 1.21 0.22 0.07 
HD_31 29.40 61.13 0.38 0.60 0.99 0.18 0.06 
HD_32 12.86 42.08 0.12 0.18 0.30 0.05 0.02 
HD_33 11.46 81.78 0.20 0.32 0.52 0.09 0.03 
HD_34 66.80 62.36 0.15 1.40 2.29 0.42 0.14 
HD_35 35.26 63.47 0.48 0.75 1.23 0.22 0.07 
HD_36 17.16 79.93 0.05 0.46 0.75 0.14 0.05 
HD_37 40.50 82.72 0.12 1.13 1.84 0.34 0.11 
HD_38 24.65 82.62 0.07 0.68 1.12 0.20 0.07 
HD_39 186.49 74.14 2.95 4.65 7.60 1.38 0.46 
HD_40 8.09 62.41 0.02 0.17 0.28 0.05 0.02 
HD_41 43.94 57.42 0.54 0.85 1.39 0.25 0.08 
HD_42 24.07 40.70 0.03 0.33 0.54 0.10 0.03 
HD_43 15.25 62.75 0.20 0.32 0.53 0.10 0.03 
HD_44 37.91 53.13 0.43 0.68 1.11 0.20 0.07 
HD_45 29.46 82.59 0.52 0.82 1.34 0.24 0.08 
HD_46 30.06 61.90 0.40 0.63 1.02 0.19 0.06 
HD_47 26.56 58.25 0.05 0.52 0.85 0.15 0.05 
HD_48 25.60 57.86 0.32 0.50 0.81 0.15 0.05 
HD_49 15.55 52.16 0.03 0.27 0.45 0.08 0.03 
HD_50 25.53 66.31 0.06 0.57 0.93 0.17 0.06 
HD_51 21.76 56.51 0.04 0.41 0.68 0.12 0.04 
HD_52 47.86 58.50 0.10 0.94 1.54 0.28 0.09 
HD_53 18.14 48.61 0.03 0.30 0.48 0.09 0.03 
HD_54 15.87 58.84 0.20 0.31 0.51 0.09 0.03 
HD_55 25.43 64.88 0.35 0.55 0.91 0.17 0.05 
HD_56 31.91 60.18 0.07 0.65 1.06 0.19 0.06 
HD_57 12.73 59.85 0.16 0.26 0.42 0.08 0.03 
HD_58 7.46 57.78 0.02 0.14 0.24 0.04 0.01 
HD_59 22.40 53.15 0.25 0.40 0.65 0.12 0.04 
HD_60 14.15 59.98 0.03 0.29 0.47 0.08 0.03 
HD_61 13.63 53.32 0.15 0.24 0.40 0.07 0.02 
HD_62 10.54 66.35 0.15 0.24 0.38 0.07 0.02 
HD_63 20.06 59.61 0.25 0.40 0.66 0.12 0.04 
HD_64 17.83 81.56 0.31 0.49 0.80 0.15 0.05 
HD_65 98.30 44.79 0.94 1.48 2.42 0.44 0.15 
HD_66 36.94 55.03 0.07 0.68 1.12 0.20 0.07 
HD_67 42.43 57.08 0.52 0.81 1.33 0.24 0.08 
HD_68 59.17 41.55 0.09 0.83 1.35 0.25 0.08 
HD_69 120.75 50.25 1.29 2.04 3.34 0.61 0.20 
HD_70 76.92 53.65 0.88 1.39 2.27 0.41 0.14 
HD_71 49.54 57.38 0.61 0.96 1.56 0.28 0.09 
HD_72 46.52 67.77 0.67 1.06 1.73 0.32 0.10 
HD_73 31.81 55.60 0.38 0.59 0.97 0.18 0.06 
HD_74 30.04 59.84 0.06 0.60 0.99 0.18 0.06 
HD_75 31.61 53.41 0.06 0.57 0.93 0.17 0.06 
HD_76 87.13 57.05 0.18 1.67 2.73 0.50 0.17 
SubcatchmentArea (ha)Imperv%Green roofPorous pavementBioretentionDry/wet pondGrass swale
HD_01 26.60 60.04 0.34 0.54 0.88 0.16 0.05 
HD_02 26.50 50.22 0.28 0.45 0.73 0.13 0.04 
HD_03 36.15 59.69 0.46 0.73 1.19 0.22 0.07 
HD_04 8.82 49.92 0.09 0.15 0.24 0.04 0.01 
HD_05 46.95 77.72 0.78 1.23 2.01 0.36 0.12 
HD_06 11.85 65.93 0.03 0.26 0.43 0.08 0.03 
HD_07 40.71 60.36 0.52 0.83 1.35 0.25 0.08 
HD_08 44.70 60.62 0.58 0.91 1.49 0.27 0.09 
HD_09 25.36 68.55 0.37 0.58 0.96 0.17 0.06 
HD_10 49.22 56.77 0.10 0.94 1.54 0.28 0.09 
HD_11 38.57 63.96 0.53 0.83 1.36 0.25 0.08 
HD_12 21.84 60.49 0.05 0.44 0.73 0.13 0.04 
HD_13 24.55 45.61 0.04 0.38 0.62 0.11 0.04 
HD_14 16.04 54.08 0.18 0.29 0.48 0.09 0.03 
HD_15 29.93 54.97 0.35 0.55 0.90 0.16 0.05 
HD_16 17.32 53.97 0.20 0.31 0.51 0.09 0.03 
HD_17 36.34 62.44 0.48 0.76 1.25 0.23 0.08 
HD_18 43.34 58.00 0.54 0.85 1.38 0.25 0.08 
HD_19 48.60 67.15 0.70 1.10 1.79 0.33 0.11 
HD_20 28.74 53.67 0.33 0.52 0.85 0.15 0.05 
HD_21 13.43 54.94 0.16 0.25 0.41 0.07 0.02 
HD_22 31.76 62.96 0.43 0.67 1.10 0.20 0.07 
HD_23 14.39 50.18 0.15 0.24 0.40 0.07 0.02 
HD_24 46.57 61.21 0.61 0.96 1.57 0.29 0.09 
HD_25 25.44 61.99 0.34 0.53 0.87 0.16 0.05 
HD_26 18.71 55.30 0.22 0.35 0.57 0.10 0.03 
HD_27 38.82 56.47 0.47 0.74 1.21 0.22 0.07 
HD_28 21.45 63.68 0.05 0.46 0.75 0.14 0.05 
HD_29 16.72 64.35 0.23 0.36 0.59 0.11 0.04 
HD_30 43.31 50.71 0.08 0.74 1.21 0.22 0.07 
HD_31 29.40 61.13 0.38 0.60 0.99 0.18 0.06 
HD_32 12.86 42.08 0.12 0.18 0.30 0.05 0.02 
HD_33 11.46 81.78 0.20 0.32 0.52 0.09 0.03 
HD_34 66.80 62.36 0.15 1.40 2.29 0.42 0.14 
HD_35 35.26 63.47 0.48 0.75 1.23 0.22 0.07 
HD_36 17.16 79.93 0.05 0.46 0.75 0.14 0.05 
HD_37 40.50 82.72 0.12 1.13 1.84 0.34 0.11 
HD_38 24.65 82.62 0.07 0.68 1.12 0.20 0.07 
HD_39 186.49 74.14 2.95 4.65 7.60 1.38 0.46 
HD_40 8.09 62.41 0.02 0.17 0.28 0.05 0.02 
HD_41 43.94 57.42 0.54 0.85 1.39 0.25 0.08 
HD_42 24.07 40.70 0.03 0.33 0.54 0.10 0.03 
HD_43 15.25 62.75 0.20 0.32 0.53 0.10 0.03 
HD_44 37.91 53.13 0.43 0.68 1.11 0.20 0.07 
HD_45 29.46 82.59 0.52 0.82 1.34 0.24 0.08 
HD_46 30.06 61.90 0.40 0.63 1.02 0.19 0.06 
HD_47 26.56 58.25 0.05 0.52 0.85 0.15 0.05 
HD_48 25.60 57.86 0.32 0.50 0.81 0.15 0.05 
HD_49 15.55 52.16 0.03 0.27 0.45 0.08 0.03 
HD_50 25.53 66.31 0.06 0.57 0.93 0.17 0.06 
HD_51 21.76 56.51 0.04 0.41 0.68 0.12 0.04 
HD_52 47.86 58.50 0.10 0.94 1.54 0.28 0.09 
HD_53 18.14 48.61 0.03 0.30 0.48 0.09 0.03 
HD_54 15.87 58.84 0.20 0.31 0.51 0.09 0.03 
HD_55 25.43 64.88 0.35 0.55 0.91 0.17 0.05 
HD_56 31.91 60.18 0.07 0.65 1.06 0.19 0.06 
HD_57 12.73 59.85 0.16 0.26 0.42 0.08 0.03 
HD_58 7.46 57.78 0.02 0.14 0.24 0.04 0.01 
HD_59 22.40 53.15 0.25 0.40 0.65 0.12 0.04 
HD_60 14.15 59.98 0.03 0.29 0.47 0.08 0.03 
HD_61 13.63 53.32 0.15 0.24 0.40 0.07 0.02 
HD_62 10.54 66.35 0.15 0.24 0.38 0.07 0.02 
HD_63 20.06 59.61 0.25 0.40 0.66 0.12 0.04 
HD_64 17.83 81.56 0.31 0.49 0.80 0.15 0.05 
HD_65 98.30 44.79 0.94 1.48 2.42 0.44 0.15 
HD_66 36.94 55.03 0.07 0.68 1.12 0.20 0.07 
HD_67 42.43 57.08 0.52 0.81 1.33 0.24 0.08 
HD_68 59.17 41.55 0.09 0.83 1.35 0.25 0.08 
HD_69 120.75 50.25 1.29 2.04 3.34 0.61 0.20 
HD_70 76.92 53.65 0.88 1.39 2.27 0.41 0.14 
HD_71 49.54 57.38 0.61 0.96 1.56 0.28 0.09 
HD_72 46.52 67.77 0.67 1.06 1.73 0.32 0.10 
HD_73 31.81 55.60 0.38 0.59 0.97 0.18 0.06 
HD_74 30.04 59.84 0.06 0.60 0.99 0.18 0.06 
HD_75 31.61 53.41 0.06 0.57 0.93 0.17 0.06 
HD_76 87.13 57.05 0.18 1.67 2.73 0.50 0.17 

The disaggregation of the near-optimal LID to site-scale layouts shows that the bioretention is the largest LID used in many subcatchments. This is mainly due to two reasons. First, the bioretention area has been reported to be highly efficient in controlling the stormwater quantity and quality in many previous studies (Joksimovic & Alam 2014; Mao et al. 2017; Eaton 2018) and, thus, is a preferred choice for the site-scale analysis. Second, the post-development land use in the HND watershed is mostly low-density residential, commercial, and institutional land uses, which have large pervious space and thus warrant the bioretention area implementation.

Re-evaluation of the site-scale LID layout

The disaggregated site-scale LID layouts for the HND watershed were implemented in the SUSTAIN model. Continuous simulations were carried out for the time period of 01 January 2011 to 31 December 2017. The runoff volume and pollutant load were compared against those from the post-development watershed, and the percentage reductions were calculated. As shown in Table 12, the disaggregated site-scale LID scenario achieves an annual average runoff volume reduction of 87.61%, and annual average pollutant load reductions for TSS, TN, and TP are 83.16, 84.42, and 82.53%, respectively.

Table 12

Hydrologic and water quality performances of disaggregated site-scale LIDs

Runoff conditionsPost-developmentSite-scale LID scenarioReduction (%)
Annual average runoff volume (106 m3/yr) 7.02 0.87 87.61 
TSS load (ton/yr) 159.42 28.78 83.16 
TN load (ton/yr) 3.98 0.62 84.42 
TP load (ton/yr) 0.63 0.11 82.53 
Runoff conditionsPost-developmentSite-scale LID scenarioReduction (%)
Annual average runoff volume (106 m3/yr) 7.02 0.87 87.61 
TSS load (ton/yr) 159.42 28.78 83.16 
TN load (ton/yr) 3.98 0.62 84.42 
TP load (ton/yr) 0.63 0.11 82.53 

The disaggregated site-level LID scenario achieved a better performance in annual runoff volume reduction (87.61%) than the composite LID volume (80%). This is because in the disaggregated site-scale LID layouts, individual LIDs were implemented in the series and thus achieved additional hydrologic and water quality benefits. Similar effects were also reported in previous studies, in which LID practices yielded higher benefits when implemented in the series than those when implemented individually (Joksimovic & Alam 2014; Eaton 2018).

Disaggregation of the near-optimal LID scenario is a manual process involving engineering judgments, and thus the hydrologic and water quality benefits could vary depending on the choice of LID types at individual sites. The careful study of site requirements of each LID type and individual site characteristics are required during this process. Whenever possible, LIDs with higher hydrologic and water quality efficiency are preferred over the ones that are less cost-effective (Gao et al. 2015; Mao et al. 2017; Zhang et al. 2018).

The LID sizing strategy presented in this study combines the watershed-scale optimization and the site-scale disaggregation for Sponge City planning. While the first step identifies the cost-effective LID sizes for each subcatchment and sets the LID volume for each subcatchment, the second step matches site-specific characteristics with LID site requirements, while ensuring the near-optimal LID volume (expressed as the aggregated LID area) stays the same for the subcatchment. Overall, this approach represents a feasible alternative to both a detailed representation of the site-scale optimization, which is computationally too expensive to execute, and an overly simplified watershed-scale analysis, which cannot guide LID implementations on the ground. The high percentage reductions in both the annual average runoff and pollutant loads prove that this approach is very promising in ensuring successful achievement of the Sponge City objectives.

Limitations

There are several limitations to this study. Firstly, the aggregated LID representation ignored land-use layouts in the individual subcatchment, and this could potentially result in mismatch during the disaggregation process. For an unlikely scenario, a subcatchment consisting of mainly buildings may find an insufficient rooftop to implement green roofs, as the required LID sizes are much larger. Engineering judgments are crucial in such circumstances to appropriate size LIDs or even balance the LID volume among neighboring subcatchments if necessary. Secondly, while the SWMM was calibrated using monitored data, the SUSTAIN model was not calibrated to local data, and thus the actual LID hydrological and water quality benefits could differ from what is reported in this study. Lastly, the long-term maintenance operation and management (O&M) costs are not included in this analysis.

Future research directions

This study shows that LID practices can effectively reduce the post-development stormwater peak flow rate and the annual total runoff volume. However, for high-plateau mountainous watersheds such as the HND watershed, heavy rainfall events during summer time could cause severe peak flow rates and flooding, and the steep slope could only worsen the situation. Therefore, efforts are needed to investigate the potential combination of traditional stormwater control measures (e.g. regional stormwater ponds) and the LID practices in achieving flooding prevention during the extreme events. The real-time control technologies could also be used to achieve better management of stormwater. In addition, stormwater management studies need to consider climate change impacts and its influences on receiving water quantity and quality (Zhang et al. 2018).

As the HND watershed is still under development and the site conditions are constantly changing, no LID performance data are available at this time. It is recommended that monitoring stations be established in the HND watershed, and future studies need to include the calibration of LID practices using local data.

In this study, we developed a SUSTAIN model for a 25.90 km2 watershed in the HND in southwest China. Composite LID volumes were identified for each subcatchment through the optimization analysis, and the results were then disaggregated to site-scale LIDs based on specific site conditions and engineering judgment. The resulting site-scale LID implementation reduced the annual average runoff volume by 87.61%, and the reduction of annual pollutant load reductions for TSS, TN, and TP were close to 85%, exceeding the Sponge City requirements for runoff volume control. The bioretention area was mostly used across all subcatchments due to its cost-effectiveness in treating stormwater runoff. The two-step Sponge City planning and implementation strategy is a good balance between the high-level cost-effectiveness analysis and the site-scale implementation analysis and could potentially be used for Sponge City planning in other cities.

This study demonstrates that LID practices can help achieve stormwater control targets set by the Sponge City program. For the Sponge City initiative to be successful in China, further studies are needed to evaluate LID performances at different climate regions, and possible combinations with traditional gray stormwater control measures are also needed in future studies.

We thank Yumin Shang, Xiaoli Niu, and Ningbo Li of the Development and Management Commission of HND for their practical engineering advices during the LID siting process. Dr Rui Zou provided tremendous computational support for the LID optimization analysis.

Ahiablame
L. M.
Engel
B. A.
Chaubey
I.
2012
Effectiveness of low impact development practices: literature review and suggestions for future research
.
Water, Air, Soil Pollution
223
(
7
),
4253
4273
.
Ahiablame
L. M.
Engel
B. A.
Chaubey
I.
2013
Effectiveness of low impact development practices in two urbanized watersheds: retrofitting with rain barrel/cistern and porous pavement
.
Journal of Environmental Management
119
(
2013
),
151
161
.
Arnold
J. G.
Moriasi
D. N.
Gassman
P. W.
Abbaspour
K. C.
White
M. J.
Srinivasan
R.
Santhi
C.
Harmel
R. D.
van Griensven
A.
van Liew
M. W.
Kannan
N.
Jha
M. K.
2012
SWAT: model use, calibration, and validation
.
Transactions of the ASABE
55
(
4
),
1491
1508
.
Ashley
R.
Lundy
L.
Ward
S.
Shaffer
P.
Walker
L.
Morgan
C.
Saul
A.
Wong
T.
Moore
S.
2013
Water-sensitive urban design: opportunities for the UK
.
Proceedings of the Institution of Civil Engineers: Municipal Engineer
166
(
2
),
65
76
.
Baek
S. S.
Choi
D. H.
Jung
J. W.
Lee
H. J.
Lee
H.
Yoon
K. S.
Cho
K. H.
2015
Optimizing low impact development (LID) for stormwater runoff treatment in urban area, Korea: experimental and modeling approach
.
Water Research
86
,
122
131
.
Barco
J.
Wong
K. M.
Stenstrom
M. K.
2008
Automatic calibration of the USEPA SWMM model for a large urban catchment
.
Journal of Hydraulic Engineering
134
(
4
),
466
474
.
Booth
D. B.
Roy
A. H.
Smith
B.
Capps
K. A.
2015
Global perspectives on the urban stream syndrome
.
Freshwater Science
35
,
412
420
.
Brown
R. R.
Keath
N.
Wong
T. H. F.
2009
Urban water management in cities: historical, current and future regimes
.
Water Science and Technology
59
(
5
),
847
855
.
Cano
O. M.
Barkdoll
B. D.
2017
Multiobjective, socioeconomic, boundary-emanating, nearest distance algorithm for stormwater low-impact BMP selection and placement
.
Journal of Water Resources Planning and Management
143
(
1
),
05016013
.
Cembrano
G.
Quevedo
J.
Salamero
M.
Puig
V.
Figueras
J.
Marti
J.
2004
Optimal control of urban drainage systems. A case study
.
Control Engineering Practice
12
(
1
),
1
9
.
Cheng
M. S.
Zhen
J. X.
Shoemaker
L.
2009
BMP decision support system for evaluating stormwater management alternatives
.
Frontiers of Environmental Science & Engineering in China
3
,
453
463
.
DHI
2002
MOUSE Surface Runoff Models Reference Manual
.
DHI Software
,
Horsolm
,
Denmark
.
Du
B.
Lofton
J. M.
Peter
K. T.
Gipe
A. D.
James
C. A.
Mcintyre
J. K.
Scholz
N. L.
Baker
J. E.
Kolodziej
E. P.
2017
Development of suspect and non-target screening methods for detection of organic contaminants in highway runoff and fish tissue with high-resolution time-of-flight mass spectrometry
.
Environmental Science: Processes & Impacts
19
(
9
),
1185
1196
.
Eaton
T. T.
2018
Approach and case-study of green infrastructure screening analysis for urban stormwater control
.
Journal of Environmental Management
209
(
2018
),
495
504
.
Eckart
K.
McPhee
Z.
Bolisetti
T.
2017
Performance and implementation of low impact development – a review
.
Science of the Total Environment
607–608
,
413
432
.
Elliott
A. H.
Trowsdale
S. A.
2007
A review of models for low impact urban stormwater drainage
.
Environmental Modeling & Software
22
(
2007
),
394
405
.
Fletcher
T. D.
Shuster
W.
Hunt
W. F.
Ashley
R.
Butler
D.
Arthur
S.
Trowsdale
S.
Barraud
S.
Semadeni-Davies
A.
Bertrand-Krajewski
J.-L.
Mikkelsen
P. S.
Rivard
G.
Uhl
M.
Dagenais
D.
Viklander
M.
2014
SUDS, LID, BMPs, WSUD and more - the evolution and application of terminology surrounding urban drainage
.
Urban Water J.
12
,
525
542
.
Gao
J.
Wang
R.
Huang
J.
Liu
M.
2015
Application of BMP to urban runoff control using SUSTAIN model: case study in an industrial area
.
Ecological Modelling
318
,
177
183
.
Gilroy
K. L.
McCuen
R. H.
2009
Spatio-temporal effects of low impact development practices
.
Journal of Hydrology
367
(
3
),
228
236
.
Hanak
E.
Lund
J. R.
2012
Adapting California's water management to climate change
.
Climate Change
111
(
1
),
17
44
.
Jia
H.
Lu
Y.
Yu
S. L.
Chen
Y.
2012
Planning of LID–BMPs for urban runoff control: the case of Beijing Olympic Village
.
Separation and Purification Technology
84
,
112
119
.
Jia
H.
Yao
H.
Tang
Y.
Yu
S. L.
Field
R.
2015
LID-BMPs planning for urban runoff control and the case study in China
.
Journal of Environmental Management
149
,
65
76
.
Joksimovic
D.
Alam
Z.
2014
Cost efficiency of low impact development (LID) stormwater management practices
.
Procedia Engineering
89
,
734
741
.
Kong
F.
Ban
Y.
Yin
H.
James
P.
Dronova
I.
2017
Modeling stormwater management at the city district level in response to changes in land use and low impact development
.
Environmental Modeling & Software
95
(
2017
),
132
142
.
LeBleu
C.
Dougherty
M.
Rahn
K.
Wright
A.
Bowen
R.
Wang
R.
Orjuela
J. A.
Britton
K.
2019
Quantifying thermal characteristics of stormwater through low impact development systems
.
Hydrology
6
(
1
),
16
.
Lee
J. G.
Selvakumar
A.
Alvi
K.
Riverson
J.
Zhen
J. X.
Shoemaker
L.
Lai
F.-H.
2012
A watershed-scale design optimization model for stormwater best management practices
.
Environmental Modelling and Software
37
,
6
18
.
Li
Q.
Zhang
H.
Liu
X.
Huang
J.
2004
Urban heat island effect on annual mean temperature during the last 50 years in China
.
Theoretical and Applied Climatology
79
,
165
174
.
Li
C.
Liu
M.
Hu
Y.
Gong
J.
Xu
Y.
2016
Modeling the quality and quantity of runoff in a highly urbanized catchment using storm water management model
.
Polish Journal of Environmental Studies
25
,
1573
1581
.
Li
C.
Liu
M.
Hu
Y.
Han
R.
Shi
T.
Qu
T.
Wu
X.
2018a
Evaluating the hydrologic performance of low impact development scenarios in a micro urban catchment
.
International Journal of Environmental Research and Public Health
15
(
2
),
273
.
Li
Q.
Wang
F.
Yu
Y.
Huang
Z.
Li
M.
Guan
Y.
2019
Comprehensive performance evaluation of LID practices for the sponge city construction: a case study in Guangxi, China
.
Journal of Environment Management
231
(
2019
),
10
20
.
Mao
X.
Jia
H.
Yu
S. L.
2017
Assessing the ecological benefits of aggregated LID-BMPs through modeling
.
Ecological Modelling
353
,
139
149
.
Martin-Mikle
C. J.
de Beurs
K. M.
Julian
J. P.
Mayer
P. M.
2015
Identifying priority sites for low impact development (LID) in a mixed-use watershed
.
Landscape and Urban Planning
140
,
29
41
.
MOHURD (Ministry of Housing and Urban-Rural Development of the People's Republic of China)
2014
Sponge City Development Technical Guide: Low Impact Development
(in Chinese)
.
Government Printing Office
,
Beijing, China
.
Moriasi
D. N.
Arnold
J. G.
Van Liew
M. W.
Bingner
R. L.
Harmel
R. D.
Veith
T. L.
2007
Model evaluation guidelines for systematic quantification of accuracy in watered simulations
.
Transactions of the ASSBE
50
(
3
),
885
900
.
Newcomer
M. E.
Gurdak
J. J.
Sklar
L. S.
Nanus
L.
2014
Urban recharge beneath low impact development and effects of climate variability and change
.
Water Resources
50
(
2
),
1716
1734
.
Palla
A.
Gnecco
I.
2015
Hydrologic modeling of low impact develop systems at the urban catchment scale
.
Journal of Hydrology
528
(
2015
),
361
368
.
Pauleit
S.
Ennos
R.
Yvonne Golding
Y.
2005
Modeling the environmental impacts of urban land use and land cover change – a study in Merseyside, UK
.
Landscape and Urban Planning
71
,
295
310
.
Piao
S.
Ciais
P.
Huang
Y.
Shen
Z.
Peng
S.
Li
J.
Zhou
L.
Liu
H.
Ma
Y.
Ding
Y.
Friedlingstein
P.
Liu
C.
Tan
K.
Yu
Y.
Zhang
T.
Fang
J.
2010
The impacts of climate change on water resources and agriculture in China
.
Nature
467
,
43
51
.
Qin
H.
Li
Z.
Fu
G.
2013
The effects of low impact development on urban flooding under different rainfall characteristics
.
Journal of Environmental Management
129
,
577
585
.
Rabori
A. M.
Ghazavi
R.
Reveshty
M. A.
2017
Sensitivity analysis of SWMM model parameters for urban runoff estimation in semi-arid area
.
Journal of Biodiversity and Environmental Sciences
10
(
5
),
284
294
.
Randall
M.
Sun
F.
Zhang
Y.
Jensen
M. B.
2019
Evaluating Sponge City volume capture ratio at the catchment scale using SWMM
.
Journal of Environmental Management
246
,
745
757
.
Riverson
J.
Alvi
K.
Zhen
J. X.
Murphy
R.
2014
SUSTAIN Application User's Guide for EPA Region 10
.
Tetra Tech
.
Rosenberg
E. A.
Keys
P. W.
Booth
D. B.
Hartley
D.
Burkey
J.
Steinemann
A. C.
Lettenmaier
D. P.
2010
Precipitation extremes and the impacts of climate change on stormwater infrastructure in Washington State
.
Climate Change
102
(
1–2
),
319
349
.
Rossman
L. A.
2005
Storm Water Management Model, Version 5.0, User's Manual
.
U.S. Environmental Protection Agency
,
Washington, D.C., USA
.
Roy
A.
Wenger
S.
Fletcher
T.
Walsh
C.
Ladson
A.
Shuster
W.
Thurston
H.
Brown
R.
2008
Impediments and solutions to sustainable, watershed-scale urban stormwater management: lessons from Australia and the United States
.
Environmental Management
42
(
2
),
344
359
.
Schueler
T. R.
1994
The importance of imperviousness
.
Watershed Protection Techniques
1
,
100
111
.
Shao
Z.
Li
S.
Lv
B.
Chai
H.
Ao
L.
Zhang
X.
2018
Analysis of the sediment remobilization phenomenon in a rain garden using CSTR theory
.
Journal of Water and Climate Change
9
(
2
),
356
336
.
Tetra Tech
2010
Stormwater Best Management Practices (BMP) Performance Analysis. Prepared for: USEPA-Region 1, Boston, MA. Prepared by: Tetra Tech, Inc. Fairfax, VA
.
USEPA
2000
Low Impact Development (LID): A Literature Review
.
United States Environmental Protection Agency
,
Washington, D.C., USA
,
EPA-841-b-00e005
.
USEPA
2009
SUSTAIN – A Framework for Placement of Best Management Practices in Urban Watersheds to Protect Water Quality
.
Office of Research and Development
,
Washington, D.C., USA
.
USEPA
2011
Report on Enhanced Framework (SUSTAIN) and Field Applications for Placement of BMPs in Urban Watersheds
.
Office of Research and Development
,
Washington, D.C., USA
.
Wong
T. H. F.
Fletcher
T. D.
Duncan
H. P.
Coleman
J. R.
Jenkins
G. A.
2002
A model for urban stormwater improvement conceptualisation
. In
International Environmental Modelling and Software Society Conference
,
Lugano, Switzerland
.
Xie
J.
Chen
H.
Liao
Z.
Gu
X.
Zhu
D.
Zhang
J.
2017
An integrated assessment of urban flooding mitigation strategies for robust decision making
.
Environmental Modelling & Software
95
(
2017
),
143
155
.
Zhang
C.
Zhang
W.
Liu
H.
Gao
X.
Huang
Y.
2018
A quantitative assessment of the contributions of climatic indicators to changes in nutrients and oxygen levels in a shallow reservoir in China
.
Theoretical and Applied Climatology
133
(
2018
),
215
226
.
This is an Open Access article distributed under the terms of the Creative Commons Attribution Licence (CC BY 4.0), which permits copying, adaptation and redistribution, provided the original work is properly cited (http://creativecommons.org/licenses/by/4.0/).