Estimation performance of implemented methods
. | T . | S . | RMSE . |
---|---|---|---|
Proposed AMP | 7.48 × 10−4 | 1.98 × 10−5 | 3.70 × 10−4 |
Type-Curve Method (Batu 1998) | 5.58 × 10−4 | 1.58 × 10−4 | 1.67 × 10−3 |
Straight-Line Method (Batu 1998) | 7.49 × 10−4 | 1.15 × 10−5 | 1.05 × 10−3 |
Glover (1978) | 7.11 × 10−4 | 4.15 × 10−5 | 5.02 × 10−4 |
Swamee et al. (2000) | 6.96 × 10−4 | 3.88 × 10−5 | 3.92 × 10−4 |
Singh (2007) | 7.02 × 10−4 | 3.64 × 10−5 | 3.71 × 10−4 |
. | T . | S . | RMSE . |
---|---|---|---|
Proposed AMP | 7.48 × 10−4 | 1.98 × 10−5 | 3.70 × 10−4 |
Type-Curve Method (Batu 1998) | 5.58 × 10−4 | 1.58 × 10−4 | 1.67 × 10−3 |
Straight-Line Method (Batu 1998) | 7.49 × 10−4 | 1.15 × 10−5 | 1.05 × 10−3 |
Glover (1978) | 7.11 × 10−4 | 4.15 × 10−5 | 5.02 × 10−4 |
Swamee et al. (2000) | 6.96 × 10−4 | 3.88 × 10−5 | 3.92 × 10−4 |
Singh (2007) | 7.02 × 10−4 | 3.64 × 10−5 | 3.71 × 10−4 |