Skip to Main Content
Table 2

Recycling costs and parameters use in the model

System type% Water recovered$/truckload% Recovered water recycledNotes
RO 40% 123 67 Mobility is feasible but price quote is for fixed location, without capital costs. Significant dilution required 
ED 40% 52 95 Assumptions not specified. Significant dilution required 
MVR 40% 1077 85 Includes equipment lease, operation, and maintenance, 75–95% water recycled. Some dilution required 
BCE 40% 295 80 Assumptions not specified, 75–85% water recycled. No dilution necessary 
System type% Water recovered$/truckload% Recovered water recycledNotes
RO 40% 123 67 Mobility is feasible but price quote is for fixed location, without capital costs. Significant dilution required 
ED 40% 52 95 Assumptions not specified. Significant dilution required 
MVR 40% 1077 85 Includes equipment lease, operation, and maintenance, 75–95% water recycled. Some dilution required 
BCE 40% 295 80 Assumptions not specified, 75–85% water recycled. No dilution necessary 

Source:Baker et al. (2011).

Close Modal

or Create an Account

Close Modal
Close Modal