Most of the parameters in Vu Gia Thu Bon's MIKE SHE model are analyzed in order to estimate the runoff response. The results demonstrate the effects of the parameters on the simulated stream flows. These effects are not similar for all parameters. The results show that the difference is not only about the quantity but also about the timing of the peaks. The responses of river flow versus the variation of main parameters are shown in Table 2.

Table 2

Response of stream flow versus the change in MIKE SHE model parameters at the Vu Gia Thu Bon catchment

    Thanh My
Nong Son
ModuleTypeParameterUnitΔbase flowΔpeak flowΔbase flowΔpeak flow
(a) 
Overland Natural forest m(1/3)/s     
1.83 190.16 0.98 26.4 
10 0.61 13.42 0.69 63.53 
20 0.88 32.73 0.88 −69.54 
50 0.42 11.88 0.29 −14.45 
Planted forest m(1/3)/s     
0.22 −15.66 1.57 95.25 
10 0.14 5.58 0.5 21.18 
20 0.12 3.1 0.48 20.13 
50 0.12 2.94 0.46 13.58 
Unused land m(1/3)/s     
0.04 3.85 0.67 49.74 
10 0.02 1.48 0.25 5.39 
20 −0.02 0.15 0.14 4.33 
50 0.01 −0.22 0.13 0.44 
Rural settlement m(1/3)/s     
0.47 26.57 0.43 119.79 
10 0.15 −1.9 0.18 25.34 
20 0.13 −0.93 0.14 16.28 
50 0.18 4.1 0.21 12.6 
River flow Bed m(1/3)/s     
10 −0.22 236.22 −11.49 389.39 
20 −0.01 0.01 −9.61 
30 0.01 −0.01 9.61 
40 
Simulation parameters Precipitation dependent time step control PMax depth 10 mm     
20 −0.03 −4.36 −0.14 −10.33 
50 0.18 −5.78 −0.22 −14.46 
100 0.23 −35.58 −0.21 −72.3 
200 0.17 −10.81 0.14 −28.59 
PInput rate 0.1 mm per hour     
0.23 −6.96 0.22 −11.9 
0.2 −1.24 0.18 −6.52 
0.08 −12.15 −0.24 −13.51 
10 0.2 2.43 0.03 −20.19 
(b) 
Unsaturated Clay Kuz 1e−09 m/s     
 1e−08 −2.18 −17.46 −3.45 −53.39 
 1e−07 −4.84 −66.43 −6.69 −166.38 
 1e−06 −3.87 −280.98 −5.7 −332.43 
 1e−05 −3.27 −476.99 −4.34 −592.19 
 Light clay Kuz 1e−08 m/s     
 1e−07 −0.42 −2.87 −0.47 −2.86 
 1e−06 −0.34 −18.35 −0.08 −6.81 
 1e−05 −0.18 −29.19 −0.26 −17.95 
 1e−04 −0.02 4.46 0.03 17.44 
 Silt loam Kuz 1e−07 m/s     
 5e−07 −3.69 −249.9 −7.22 −428.98 
 1e−06 −5.34 −317.53 −7.1 −459.5 
 5e−06 −9.8 −1,321.32 −14.28 −1,648.9 
 1e−05 −0.65 −132.79 −1.9 −494.44 
 Loamy sand Kuz 1e−08 m/s     
 1e−07 −0.17 −7.1 −0.92 −9.21 
 1e−06 −2.16 −89.13 −1.83 −114.61 
 5e−06 −1.12 −194.24 −1.19 −213.99 
 1e−05 −0.17 −39.17 −0.31 −65.52 
 Sand Kuz 1e−08 m/s     
 1e−07 −0.07 −0.57 
 1e−06 0.02 −0.24 −5.13 
 1e−05 −0.01 −0.13 −3.74 
 1e−04 
Saturated Aquifer Kh 1e−05 m/s     
2e−05 7.5 −169.43 12.45 −55.98 
4e−05 11.23 −104.78 18.68 −82.65 
6e−05 7.15 −92.3 12.46 −168.03 
8e−05 4.7 −98.18 8.69 −99.1 
    Thanh My
Nong Son
ModuleTypeParameterUnitΔbase flowΔpeak flowΔbase flowΔpeak flow
(a) 
Overland Natural forest m(1/3)/s     
1.83 190.16 0.98 26.4 
10 0.61 13.42 0.69 63.53 
20 0.88 32.73 0.88 −69.54 
50 0.42 11.88 0.29 −14.45 
Planted forest m(1/3)/s     
0.22 −15.66 1.57 95.25 
10 0.14 5.58 0.5 21.18 
20 0.12 3.1 0.48 20.13 
50 0.12 2.94 0.46 13.58 
Unused land m(1/3)/s     
0.04 3.85 0.67 49.74 
10 0.02 1.48 0.25 5.39 
20 −0.02 0.15 0.14 4.33 
50 0.01 −0.22 0.13 0.44 
Rural settlement m(1/3)/s     
0.47 26.57 0.43 119.79 
10 0.15 −1.9 0.18 25.34 
20 0.13 −0.93 0.14 16.28 
50 0.18 4.1 0.21 12.6 
River flow Bed m(1/3)/s     
10 −0.22 236.22 −11.49 389.39 
20 −0.01 0.01 −9.61 
30 0.01 −0.01 9.61 
40 
Simulation parameters Precipitation dependent time step control PMax depth 10 mm     
20 −0.03 −4.36 −0.14 −10.33 
50 0.18 −5.78 −0.22 −14.46 
100 0.23 −35.58 −0.21 −72.3 
200 0.17 −10.81 0.14 −28.59 
PInput rate 0.1 mm per hour     
0.23 −6.96 0.22 −11.9 
0.2 −1.24 0.18 −6.52 
0.08 −12.15 −0.24 −13.51 
10 0.2 2.43 0.03 −20.19 
(b) 
Unsaturated Clay Kuz 1e−09 m/s     
 1e−08 −2.18 −17.46 −3.45 −53.39 
 1e−07 −4.84 −66.43 −6.69 −166.38 
 1e−06 −3.87 −280.98 −5.7 −332.43 
 1e−05 −3.27 −476.99 −4.34 −592.19 
 Light clay Kuz 1e−08 m/s     
 1e−07 −0.42 −2.87 −0.47 −2.86 
 1e−06 −0.34 −18.35 −0.08 −6.81 
 1e−05 −0.18 −29.19 −0.26 −17.95 
 1e−04 −0.02 4.46 0.03 17.44 
 Silt loam Kuz 1e−07 m/s     
 5e−07 −3.69 −249.9 −7.22 −428.98 
 1e−06 −5.34 −317.53 −7.1 −459.5 
 5e−06 −9.8 −1,321.32 −14.28 −1,648.9 
 1e−05 −0.65 −132.79 −1.9 −494.44 
 Loamy sand Kuz 1e−08 m/s     
 1e−07 −0.17 −7.1 −0.92 −9.21 
 1e−06 −2.16 −89.13 −1.83 −114.61 
 5e−06 −1.12 −194.24 −1.19 −213.99 
 1e−05 −0.17 −39.17 −0.31 −65.52 
 Sand Kuz 1e−08 m/s     
 1e−07 −0.07 −0.57 
 1e−06 0.02 −0.24 −5.13 
 1e−05 −0.01 −0.13 −3.74 
 1e−04 
Saturated Aquifer Kh 1e−05 m/s     
2e−05 7.5 −169.43 12.45 −55.98 
4e−05 11.23 −104.78 18.68 −82.65 
6e−05 7.15 −92.3 12.46 −168.03 
8e−05 4.7 −98.18 8.69 −99.1 