An actual flood event is used as the input to the flood control system consists of the Pubugou reservoir and Leshan city. The stepwise trial-and-error algorithm (Zhong et al. 2003) is employed to solve the established optimization operation model. By setting different upper limits of water level, 10 non-dominated flood control operation alternatives are generated and their criteria values are obtained after reservoir flood routing, as shown in Table 1.

Table 1

Criteria values of the 10 reservoir flood control operation alternatives

Alternative no.ZchZmax (m)ZeZid (m)Wab (106 m3)Qmax (m3/s)T (h)Wex (106m3)ZfQfSl (t)Qsd (m3/s)
4.78 5.44 1970 4810 51 40 0.28 290 508 
5.28 5.10 2100 4880 56 48 0.13 277 561 
5.78 4.58 2220 4940 59 54 0.08 260 614 
6.28 4.02 2350 5020 66 61 250 667 
6.78 3.46 2480 5090 72 70 237 720 
7.28 3.06 2620 5180 76 74 224 773 
7.78 2.45 2750 5270 83 82 211 826 
8.28 2.11 2880 5350 87 90 0.09 198 879 
8.78 1.62 2940 5450 91 100 0.16 183 932 
10 9.28 1.20 3010 5520 96 120 0.32 170 985 
Alternative no.ZchZmax (m)ZeZid (m)Wab (106 m3)Qmax (m3/s)T (h)Wex (106m3)ZfQfSl (t)Qsd (m3/s)
4.78 5.44 1970 4810 51 40 0.28 290 508 
5.28 5.10 2100 4880 56 48 0.13 277 561 
5.78 4.58 2220 4940 59 54 0.08 260 614 
6.28 4.02 2350 5020 66 61 250 667 
6.78 3.46 2480 5090 72 70 237 720 
7.28 3.06 2620 5180 76 74 224 773 
7.78 2.45 2750 5270 83 82 211 826 
8.28 2.11 2880 5350 87 90 0.09 198 879 
8.78 1.62 2940 5450 91 100 0.16 183 932 
10 9.28 1.20 3010 5520 96 120 0.32 170 985 