Total cost and daily maximum pressure difference of Pareto optimal solutions for pump optimization of the Apulian-35 network.
Total cost and daily maximum pressure difference of Pareto optimal solutions for pump optimization of the Apulian-35 network.
Austin network's pump design and scheduling solutions with the original tank capacity (tank volume = 3,779 tons)
Daily maximum pressure difference (m) . | Pump capacity (kW) . | Number of pumps . | POC (%) . | PCC (%) . | Total cost (USD) . |
---|---|---|---|---|---|
24.3 | 75 | 2 | 4,200,470 (71) | 1,756,790 (29) | 5,957,260 |
10.0 | 55 | 3 | 4,136,083 (67) | 2,061,125 (33) | 6,197,208 |
9.0 | 45 | 5 | 4,149,892 (60) | 2,719,809 (40) | 6,869,701 |
8.0 | 45 | 5 | 4,291,177 (61) | 2,719,808 (39) | 7,010,985 |
7.0 | 45 | 7 | 4,240,651 (55) | 3,442,135 (45) | 7,682,786 |
6.6 | 45 | 8 | 4,342,599 (53) | 3,779,396 (47) | 8,121,995 |
Daily maximum pressure difference (m) . | Pump capacity (kW) . | Number of pumps . | POC (%) . | PCC (%) . | Total cost (USD) . |
---|---|---|---|---|---|
24.3 | 75 | 2 | 4,200,470 (71) | 1,756,790 (29) | 5,957,260 |
10.0 | 55 | 3 | 4,136,083 (67) | 2,061,125 (33) | 6,197,208 |
9.0 | 45 | 5 | 4,149,892 (60) | 2,719,809 (40) | 6,869,701 |
8.0 | 45 | 5 | 4,291,177 (61) | 2,719,808 (39) | 7,010,985 |
7.0 | 45 | 7 | 4,240,651 (55) | 3,442,135 (45) | 7,682,786 |
6.6 | 45 | 8 | 4,342,599 (53) | 3,779,396 (47) | 8,121,995 |