Table 3

Comparison of the costs for the two solutions

Reuse of wastewaterCost €Catchment and discharge into the river NetoCost €
Pumping station (R1) 11,780.00 Pumping station (R1) 11,780.00 
Pressurized pipeline (p1) 167,074.40 Pressurized pipeline (p1) 167,074.40 
Phytoremediation basin (C) 112,000.00 Gravity pipeline (P4) 160,454.00 
Basin of accumulation, adjustment and refining (B) 226,400.00 Pumping station (R4) 11,780.00 
System of disinfection of the water to UV rays 72,022.65 Pressurized pipeline (p5) 447,570.00 
Gravity pipeline (P2) 252,263.49 Gravity pipeline (P6) 550,128.00 
Pumping station (R2) 11,780.00   
Pressurized pipeline (p3) 371,686.50   
tTnk of in ground accumulation (A) 51,520.00   
Total 1,285,927.04  1,348,786.40 
Reuse of wastewaterCost €Catchment and discharge into the river NetoCost €
Pumping station (R1) 11,780.00 Pumping station (R1) 11,780.00 
Pressurized pipeline (p1) 167,074.40 Pressurized pipeline (p1) 167,074.40 
Phytoremediation basin (C) 112,000.00 Gravity pipeline (P4) 160,454.00 
Basin of accumulation, adjustment and refining (B) 226,400.00 Pumping station (R4) 11,780.00 
System of disinfection of the water to UV rays 72,022.65 Pressurized pipeline (p5) 447,570.00 
Gravity pipeline (P2) 252,263.49 Gravity pipeline (P6) 550,128.00 
Pumping station (R2) 11,780.00   
Pressurized pipeline (p3) 371,686.50   
tTnk of in ground accumulation (A) 51,520.00   
Total 1,285,927.04  1,348,786.40 