Table 3.

Engineering measures undertaken in the SCCP.

LocationEngineering measures
Built-up region Green roof Infiltration pipes/ditches 16 Early runoff discarding 
Pervious pavement (concrete/brick) 10 Infiltration tank 17 Artificial soil infiltration 
Sunken lawn 11 Infiltration well 18 Artificial lake 
Bio-retention poolsa 12 Artificial pond 19 Wastewater treatment 
Detention pool 13 Artificial wetland 20 Pumping station 
Detention tank 14 Grassed swale 21 Drainage system reconstruction 
Rain water tank 15 Vegetation buffer zone 22 Canals & ditches building 
Rain pit     
Suburban region 23 River way treatment 24 Afforestation (18  Artificial lake) 
LocationEngineering measures
Built-up region Green roof Infiltration pipes/ditches 16 Early runoff discarding 
Pervious pavement (concrete/brick) 10 Infiltration tank 17 Artificial soil infiltration 
Sunken lawn 11 Infiltration well 18 Artificial lake 
Bio-retention poolsa 12 Artificial pond 19 Wastewater treatment 
Detention pool 13 Artificial wetland 20 Pumping station 
Detention tank 14 Grassed swale 21 Drainage system reconstruction 
Rain water tank 15 Vegetation buffer zone 22 Canals & ditches building 
Rain pit     
Suburban region 23 River way treatment 24 Afforestation (18  Artificial lake) 

aIncludes rain garden, parterre, eco-tree pool, etc.