Skip to Main Content
Table 1

Summary results of individual precast pit latrine concrete slabs (n = 28)

Slab IDCitySlab typePrice (Malawi Kwacha)Did seller report receiving training?Slab length/diameter (m)Slab width (m)Slab thickness (m)Are surfaces free from visual cracks, chipping or unevenness?Compression strength (N/mm2)Reinforcement material observed
Mzuzu Flat 25,000 Yes 1.41 1.01 0.05 Yes <20 Reinforcing bar 
Mzuzu Flat 25,000 Yes 1.40 1.00 0.05 Yes <20 Reinforcing bar 
Mzuzu Flat 14,000 Yes 0.66 0.52 0.07 No <20 Reinforcing bar 
Mzuzu Flat 14,000 Yes 0.66 0.53 0.06 No <20 Reinforcing bar 
Mzuzu Flat 15,000 Yes 1.32 0.69 0.06 Yes <20 Reinforcing bar and scrap metal 
Mzuzu Dome 15,000 Yes 0.81 0.07 Yes <20 Wire 
Mzuzu Dome 15,000 Yes 0.80 0.08 Yes <20 Wire 
Mzuzu Dome 10,000 No 0.63 0.07 No <20 Wire 
Lilongwe Flat 18,000 No 1.30 0.90 0.07 Yes <20 Reinforcing bar and scrap metal 
10 Lilongwe Flat 18,000 No 1.30 0.91 0.06 Yes <20 Reinforcing bar and scrap metal 
11 Lilongwe Flat 17,500 No 1.05 0.80 0.09 Yes <20 Reinforcing bar 
12 Lilongwe Flat 17,500 No 1.30 0.90 0.07 Yes <20 Reinforcing bar 
13 Lilongwe Flat 15,000 No 1.01 0.91 0.08 No <20 Reinforcing bar 
14 Lilongwe Flat 15,000 No 1.01 0.91 0.08 No <20 Reinforcing bar 
15 Lilongwe Flat 15,000 No 1.01 0.91 0.08 No (minor cracks present) <20 Reinforcing bar 
16 Lilongwe Flat 15,000 No 1.20 0.90 0.07 No (minor cracks present) <20 Reinforcing bar 
17 Lilongwe Flat 16,000 Yes 1.01 0.90 0.07 Yes <20 Reinforcing bar 
18 Lilongwe Flat 16,000 Yes 1.32 0.90 0.08 Yes 25 Reinforcing bar 
19 Lilongwe Flat 17,500 No 1.32 0.90 0.08 Yes <20 Reinforcing bar 
20 Lilongwe Flat 17,500 No 1.20 1.00 0.07 Yes <20 Reinforcing bar 
21 Lilongwe Flat 16,000 No 1.26 0.90 0.08 Yes <20 Reinforcing bar 
22 Lilongwe Flat 16,000 No 0.91 0.91 0.08 Yes <20 Scrap metal 
23 Lilongwe Flat 16,000 No 1.25 0.90 0.07 Yes <20 Reinforcing bar 
24 Lilongwe Flat 16,000 No 1.27 0.91 0.07 Yes <20 Reinforcing bar 
25 Lilongwe Flat 15,000 No 1.17 0.90 0.07 Yes <20 Wire 
26 Lilongwe Flat 15,000 No 1.40 0.90 0.07 Yes <20 Wire 
27 Lilongwe Flat 16,000 Yes 0.91 0.81 0.07 Yes <20 Reinforcing bar 
28 Lilongwe Flat 16,000 Yes 1.20 0.90 0.05 Yes <20 Reinforcing bar 
Slab IDCitySlab typePrice (Malawi Kwacha)Did seller report receiving training?Slab length/diameter (m)Slab width (m)Slab thickness (m)Are surfaces free from visual cracks, chipping or unevenness?Compression strength (N/mm2)Reinforcement material observed
Mzuzu Flat 25,000 Yes 1.41 1.01 0.05 Yes <20 Reinforcing bar 
Mzuzu Flat 25,000 Yes 1.40 1.00 0.05 Yes <20 Reinforcing bar 
Mzuzu Flat 14,000 Yes 0.66 0.52 0.07 No <20 Reinforcing bar 
Mzuzu Flat 14,000 Yes 0.66 0.53 0.06 No <20 Reinforcing bar 
Mzuzu Flat 15,000 Yes 1.32 0.69 0.06 Yes <20 Reinforcing bar and scrap metal 
Mzuzu Dome 15,000 Yes 0.81 0.07 Yes <20 Wire 
Mzuzu Dome 15,000 Yes 0.80 0.08 Yes <20 Wire 
Mzuzu Dome 10,000 No 0.63 0.07 No <20 Wire 
Lilongwe Flat 18,000 No 1.30 0.90 0.07 Yes <20 Reinforcing bar and scrap metal 
10 Lilongwe Flat 18,000 No 1.30 0.91 0.06 Yes <20 Reinforcing bar and scrap metal 
11 Lilongwe Flat 17,500 No 1.05 0.80 0.09 Yes <20 Reinforcing bar 
12 Lilongwe Flat 17,500 No 1.30 0.90 0.07 Yes <20 Reinforcing bar 
13 Lilongwe Flat 15,000 No 1.01 0.91 0.08 No <20 Reinforcing bar 
14 Lilongwe Flat 15,000 No 1.01 0.91 0.08 No <20 Reinforcing bar 
15 Lilongwe Flat 15,000 No 1.01 0.91 0.08 No (minor cracks present) <20 Reinforcing bar 
16 Lilongwe Flat 15,000 No 1.20 0.90 0.07 No (minor cracks present) <20 Reinforcing bar 
17 Lilongwe Flat 16,000 Yes 1.01 0.90 0.07 Yes <20 Reinforcing bar 
18 Lilongwe Flat 16,000 Yes 1.32 0.90 0.08 Yes 25 Reinforcing bar 
19 Lilongwe Flat 17,500 No 1.32 0.90 0.08 Yes <20 Reinforcing bar 
20 Lilongwe Flat 17,500 No 1.20 1.00 0.07 Yes <20 Reinforcing bar 
21 Lilongwe Flat 16,000 No 1.26 0.90 0.08 Yes <20 Reinforcing bar 
22 Lilongwe Flat 16,000 No 0.91 0.91 0.08 Yes <20 Scrap metal 
23 Lilongwe Flat 16,000 No 1.25 0.90 0.07 Yes <20 Reinforcing bar 
24 Lilongwe Flat 16,000 No 1.27 0.91 0.07 Yes <20 Reinforcing bar 
25 Lilongwe Flat 15,000 No 1.17 0.90 0.07 Yes <20 Wire 
26 Lilongwe Flat 15,000 No 1.40 0.90 0.07 Yes <20 Wire 
27 Lilongwe Flat 16,000 Yes 0.91 0.81 0.07 Yes <20 Reinforcing bar 
28 Lilongwe Flat 16,000 Yes 1.20 0.90 0.05 Yes <20 Reinforcing bar 
Close Modal

or Create an Account

Close Modal
Close Modal