Skip to Main Content
Table 1

Operational phases of the UASB reactor

PhaseDuration (weeks)Effluent rawOrganic loads (kg COD d−1)
Phase 1 53 Mixture of sanitary wastewatera + wastewater from a pig farmb 0.33 
Phase 2 14 Sanitary wastewatera 0.09 
Phase 3 28 Mixture of sanitary wastewatera + wastewater from a pig farmc 0.52 
PhaseDuration (weeks)Effluent rawOrganic loads (kg COD d−1)
Phase 1 53 Mixture of sanitary wastewatera + wastewater from a pig farmb 0.33 
Phase 2 14 Sanitary wastewatera 0.09 
Phase 3 28 Mixture of sanitary wastewatera + wastewater from a pig farmc 0.52 

aSanitary wastewater from the Monjolinho WWTP (São Carlos, São Paulo, Brazil), after preliminary treatment (screen and grit chamber).

bPigpen wastewater from the Big Board farm (São Carlos, São Paulo state, Brazil).

cPigpen wastewater from the Santo Ignácio de Loiola farm (Brotas, São Paulo state, Brazil).

Close Modal

or Create an Account

Close Modal
Close Modal