The parameters of LID in Model 2
Sub-catchment . | LID type . | Design guidelines . | % of Area . | % From imperv . |
---|---|---|---|---|
S5–S8 | Rain Barrel | Based on land-use characteristics of sub-catchment areas and features and suitability of low-impact development facilities | 54 | 40 |
Green Roof | 36 | 20 | ||
S15–S17 | Vegetative Swale | 65 | 50 | |
Rain Barrel | 16 | 50 | ||
S16–S17 | storage tanks along the way | 30 | 70 |
Sub-catchment . | LID type . | Design guidelines . | % of Area . | % From imperv . |
---|---|---|---|---|
S5–S8 | Rain Barrel | Based on land-use characteristics of sub-catchment areas and features and suitability of low-impact development facilities | 54 | 40 |
Green Roof | 36 | 20 | ||
S15–S17 | Vegetative Swale | 65 | 50 | |
Rain Barrel | 16 | 50 | ||
S16–S17 | storage tanks along the way | 30 | 70 |