Skip to Main Content
Table 3

Abutment and combined scour at Sardar Bridge (existing bridge)

Abutment Scour
Combined Scour Depths
Flow Profile (m3/s)ParametersLeftRightLeft (m)Channel (m)Left abut + Contr (m)Right abut + Contr (m)
PF 1 Ys (m) 39 12.79 14.82 16.12 41.22 17.16 
25788 Vc (m/s) 0.52 1.02 
PF 2 Ys (m) 51.37 40.93 – – – – 
33257 Vc (m/s) 0.5 0.38 
PF 3 Ys (m) 79.24 49.11 19.48 22.60 85.77 59.05 
43924 Vc (m/s) 0.3 0.27 
PF 4 Ys (m) 7.64 – 10.73 12.07 8.44 – 
8501 Vc (m/s) 0.59 – 
Abutment Scour
Combined Scour Depths
Flow Profile (m3/s)ParametersLeftRightLeft (m)Channel (m)Left abut + Contr (m)Right abut + Contr (m)
PF 1 Ys (m) 39 12.79 14.82 16.12 41.22 17.16 
25788 Vc (m/s) 0.52 1.02 
PF 2 Ys (m) 51.37 40.93 – – – – 
33257 Vc (m/s) 0.5 0.38 
PF 3 Ys (m) 79.24 49.11 19.48 22.60 85.77 59.05 
43924 Vc (m/s) 0.3 0.27 
PF 4 Ys (m) 7.64 – 10.73 12.07 8.44 – 
8501 Vc (m/s) 0.59 – 

PF: Flow profile; Ys: Scour depth; Vc: Critical velocity.

Close Modal

or Create an Account

Close Modal
Close Modal