Table 6

Boundary conditions and cost design parameters for the technologies of water recycling and the HighCon concentrate treatment process

RONFEDMDMEH IMEH II
Annual operating hours (h/a) 8,000 
Real interest rate (–) 0.03 
Amortization period (a) 
Personnel deployment (h/a) 440 220 200 200 120 600 
Membrane lifetime (a) 2.5 – – 
Specific consumption electric energy (kWh/m35.0 2.5 3.0 0.7 24 32 
Specific consumption thermal energy (kWh/m3– – – 250 400 540 