Table 1

The statistical evaluation of model parametrization using flow data for Ikizdere Basin

Statistic parameterDCa
UCb
MGCc
UCDCd
Ikizdere
Tözköydere
Ikizdere
Tözköydere
Ikizdere
Tözköydere
Ikizdere
Tözköydere
Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.
NS 0.72 0.69 – 0.69 – 0.66 0.81 0.74 0.71 0.60 0.75 0.64 0.74 0.75 0.70 0.84 
R2 0.75 0.75 – 0.69 – 0.70 0.82 0.76 0.74 0.64 0.75 0.65 0.76 0.79 0.72 0.84 
RSR 0.52 0.56 – 0.55 – 0.58 0.43 0.51 0.54 0.60 0.50 0.60 0.51 0.50 0.55 0.40 
PBIAS 10.10 22.70 – 4.7 – 17.1 8.40 13.90 13.20 11.70 3.90 11.70 10.40 18.40 − 0.10 6.20 
p-factor 0.86 0.72 – 0.57 – 0.60 0.76 0.58 0.82 0.50 0.81 0.55 0.53 0.48 0.66 0.42 
Mean_Sim (Mean_Obs) 11.8 (13.1) 10.7 (13.8) – 6.19 (6.50) – 11.4 (13.8) 5.9 (6.5) 5.6 (6.5) 11.4 (13.1) 10.6 (13.8) 6.2 (6.4) 5.7 (6.5) 11.7 (13.1) 11.3 (13.8) 6.4 (6.4) 6.1 (6.5) 
StDev_Sim (StDev_Obs) 11.1 (11.4) 11.4 (12.9) – 5.93 (7.17) – 11.6 (12.9) 6.0 (6.9) 6.5 (6.9) 10.6 (11.4) 10.9 (12.9) 5.9 (6.7) 6.0 (7.2) 10.3 (11.4) 10.9 (12.9) 6.7 (6.7) 6.3 (7.2) 
Statistic parameterDCa
UCb
MGCc
UCDCd
Ikizdere
Tözköydere
Ikizdere
Tözköydere
Ikizdere
Tözköydere
Ikizdere
Tözköydere
Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.Calib.Valid.
NS 0.72 0.69 – 0.69 – 0.66 0.81 0.74 0.71 0.60 0.75 0.64 0.74 0.75 0.70 0.84 
R2 0.75 0.75 – 0.69 – 0.70 0.82 0.76 0.74 0.64 0.75 0.65 0.76 0.79 0.72 0.84 
RSR 0.52 0.56 – 0.55 – 0.58 0.43 0.51 0.54 0.60 0.50 0.60 0.51 0.50 0.55 0.40 
PBIAS 10.10 22.70 – 4.7 – 17.1 8.40 13.90 13.20 11.70 3.90 11.70 10.40 18.40 − 0.10 6.20 
p-factor 0.86 0.72 – 0.57 – 0.60 0.76 0.58 0.82 0.50 0.81 0.55 0.53 0.48 0.66 0.42 
Mean_Sim (Mean_Obs) 11.8 (13.1) 10.7 (13.8) – 6.19 (6.50) – 11.4 (13.8) 5.9 (6.5) 5.6 (6.5) 11.4 (13.1) 10.6 (13.8) 6.2 (6.4) 5.7 (6.5) 11.7 (13.1) 11.3 (13.8) 6.4 (6.4) 6.1 (6.5) 
StDev_Sim (StDev_Obs) 11.1 (11.4) 11.4 (12.9) – 5.93 (7.17) – 11.6 (12.9) 6.0 (6.9) 6.5 (6.9) 10.6 (11.4) 10.9 (12.9) 5.9 (6.7) 6.0 (7.2) 10.3 (11.4) 10.9 (12.9) 6.7 (6.7) 6.3 (7.2) 

aThe parameters were calculated for the flows of Ikizdere.

bThe parameters were calculated for the flows of Tözköydere.

cThe calibration was conducted using both Ikizdere and Tözköyere flows.

dThe calibration was conducted using Tözköyere flow (upstream) before using the Ikizdere flows (downstream).

Close Modal

or Create an Account

Close Modal
Close Modal