Skip to Main Content
Table 6

The RMSE and R2 of different transfer equations in calibration (C) and verification (V) stages

DurationPerformance criteriaZ = 200R1.6
Z = 166R2
Z = 110R1.8 and Z = 126R2
CVCVCV
February to May RMSE (mm/hr) 3.45 5.45 2.16 4.38 0.63 1.21 
R2 0.53 0.82 0.54 0.84 0.96 0.99 
Other months RMSE (mm/hr) 2.62 2.19 2.46 1.95 0.55 0.5 
R2 0.81 0.72 0.82 0.75 0.99 0.99 
DurationPerformance criteriaZ = 200R1.6
Z = 166R2
Z = 110R1.8 and Z = 126R2
CVCVCV
February to May RMSE (mm/hr) 3.45 5.45 2.16 4.38 0.63 1.21 
R2 0.53 0.82 0.54 0.84 0.96 0.99 
Other months RMSE (mm/hr) 2.62 2.19 2.46 1.95 0.55 0.5 
R2 0.81 0.72 0.82 0.75 0.99 0.99 
Close Modal

or Create an Account

Close Modal
Close Modal