Skip to Main Content
Table 3

Pipe and node data for S-PLACE GA

Pipe no.Upstream nodeDownstream nodeLength (ft)Flow (GPM)Travel time (Hour)Node no.Nodal demand (GPM)Probability of contamination
17 359 2,964.26977 0.554 3.83 0.5 
Pipe no.Upstream nodeDownstream nodeLength (ft)Flow (GPM)Travel time (Hour)Node no.Nodal demand (GPM)Probability of contamination
17 359 2,964.26977 0.554 3.83 0.5 
Close Modal

or Create an Account

Close Modal
Close Modal