Skip to Main Content
Table 5

Performance of the SaDE based calibrated streamflows for dry and wet periods during VIC model calibration and validation

 Calibration
Validation
Wet periodDry periodWet periodDry period
Ens 0.87 0.09 0.88 –0.21 
R2 0.93 0.63 0.94 0.43 
PBIAS 3.12 –24.99 5.02 –1.84 
 Calibration
Validation
Wet periodDry periodWet periodDry period
Ens 0.87 0.09 0.88 –0.21 
R2 0.93 0.63 0.94 0.43 
PBIAS 3.12 –24.99 5.02 –1.84 
Close Modal

or Create an Account

Close Modal
Close Modal