Table 5

Estimation of the purchased equipment cost for SAS production and the cost of their usage for 3 h

EquipmentCapacityCost ($)Working cost for 3 h ($)
N2 cylinder 8 L/min 200 0.008 
Rotameter 50 L/min 300 0.012 
Beakers 2 × 250 mL, 2 × 500 mL 40 0.016 
Peristaltic pump 5.41 g/min 150 0.006 
Temperature controller 100–1,000 °C 200 0.008 
Electric furnace 600 °C 2,000 0.078 
FBR 2 L 15,000 0.586 
Thermocouple 100–1,000 °C 50 0.002 
Acetone 2.5 L 90 0.800 
Sieve 20–200 μm 150 0.006 
Balance 2.5 kg 700 0.027 
Muffle furnace 20–180 °C 600 0.023 
Desiccator 0.5 L 100 0.004 
Total 1.575 
EquipmentCapacityCost ($)Working cost for 3 h ($)
N2 cylinder 8 L/min 200 0.008 
Rotameter 50 L/min 300 0.012 
Beakers 2 × 250 mL, 2 × 500 mL 40 0.016 
Peristaltic pump 5.41 g/min 150 0.006 
Temperature controller 100–1,000 °C 200 0.008 
Electric furnace 600 °C 2,000 0.078 
FBR 2 L 15,000 0.586 
Thermocouple 100–1,000 °C 50 0.002 
Acetone 2.5 L 90 0.800 
Sieve 20–200 μm 150 0.006 
Balance 2.5 kg 700 0.027 
Muffle furnace 20–180 °C 600 0.023 
Desiccator 0.5 L 100 0.004 
Total 1.575 