Skip to Main Content
Table 1

Proposed barrage control schemes

SchemeS1S2S3S4S5
Inflow Period (Flood release) 
Period (day/month) 01/05–31/08 01/04–31/08 01/04–31/08 01/04–31/08 01/04–31/08 
Water Level (m) >15.5 >15.5 >15.5 >15.5 <15.5 
Storage Period (Maintain water levels) 
Period (day/month) 01/09–30/09 01/09–30/09 01/09–30/09 01/09–30/09 01/09–30/09 
Minimum Flow (m3/s) 2,100 – – – – 
Water Level (m) 15.5 14.5–15.5 14.5–15.5 14.5–15.5 14.5–15.5 
Recharging Period (Supply to downstream) 
Period (day/month) 01/10–31/10 01/10–31/10 01/10–31/10 01/10–31/10 01/10–31/10 
Water Level (m) > 14 11.5–14.5 12–14.5 11.5–14.5 12–12.5 
Supply Period (Maintain water levels) 
Period (day/month) 01/11–29/02 01/11–29/02 01/11–29/02 01/11–29/02 01/11–29/02 
Minimum Flow (m3/s) 925 – – – Qout = Qin 
Water Level (m) > 15.5 10–11 12 10 12.5 
Outflow Period (Flood release) 
Period (day/month) 01/03–30/04 01/03–31/03 01/03–31/03 01/03–31/03 01/03–31/03 
Minimum Flow (m3/s) – – – – 10,000 
Water Level (m) 12 14 12 10 11 
SchemeS1S2S3S4S5
Inflow Period (Flood release) 
Period (day/month) 01/05–31/08 01/04–31/08 01/04–31/08 01/04–31/08 01/04–31/08 
Water Level (m) >15.5 >15.5 >15.5 >15.5 <15.5 
Storage Period (Maintain water levels) 
Period (day/month) 01/09–30/09 01/09–30/09 01/09–30/09 01/09–30/09 01/09–30/09 
Minimum Flow (m3/s) 2,100 – – – – 
Water Level (m) 15.5 14.5–15.5 14.5–15.5 14.5–15.5 14.5–15.5 
Recharging Period (Supply to downstream) 
Period (day/month) 01/10–31/10 01/10–31/10 01/10–31/10 01/10–31/10 01/10–31/10 
Water Level (m) > 14 11.5–14.5 12–14.5 11.5–14.5 12–12.5 
Supply Period (Maintain water levels) 
Period (day/month) 01/11–29/02 01/11–29/02 01/11–29/02 01/11–29/02 01/11–29/02 
Minimum Flow (m3/s) 925 – – – Qout = Qin 
Water Level (m) > 15.5 10–11 12 10 12.5 
Outflow Period (Flood release) 
Period (day/month) 01/03–30/04 01/03–31/03 01/03–31/03 01/03–31/03 01/03–31/03 
Minimum Flow (m3/s) – – – – 10,000 
Water Level (m) 12 14 12 10 11 
Close Modal

or Create an Account

Close Modal
Close Modal