Skip to Main Content
Table 6

Computational time of the Brunone model and the TVB model in the schemes of the MOC and the second-order GTS at the same conditions

Case 1N= 256
N= 32
Cr= 0.5Cr= 0.1Cr= 0.5Cr= 0.1
MOC Brunone model-T5 (s) 0.7344 3.5471 0.0156 0.0681 
MOC TVB model-T6 (s) 32.1412 162.1875 0.8125 3.1251 
2nd GTS Brunone model-T7 (s) 1.6412 8.3282 0.0313 0.1412 
2nd GTS TVB model-T8 (s) 12.0781 63.6702 0.3125 1.3594 
T6/T5 43.8 45.7 52.1 45.9 
T8/T7 7.4 7.6 10.0 9.6 
T7/T5 2.2 2.3 2.0 2.1 
T6/T8 2.7 2.5 2.6 2.3 
Case 1N= 256
N= 32
Cr= 0.5Cr= 0.1Cr= 0.5Cr= 0.1
MOC Brunone model-T5 (s) 0.7344 3.5471 0.0156 0.0681 
MOC TVB model-T6 (s) 32.1412 162.1875 0.8125 3.1251 
2nd GTS Brunone model-T7 (s) 1.6412 8.3282 0.0313 0.1412 
2nd GTS TVB model-T8 (s) 12.0781 63.6702 0.3125 1.3594 
T6/T5 43.8 45.7 52.1 45.9 
T8/T7 7.4 7.6 10.0 9.6 
T7/T5 2.2 2.3 2.0 2.1 
T6/T8 2.7 2.5 2.6 2.3 
Close Modal

or Create an Account

Close Modal
Close Modal