Skip to Main Content
Table 1

New investment options.

InterventionBrief Description of Intervention
Villa Victoria Extra storage and canal 
Bosque-Colorines Canal Increased capacity of canal between Bosque and Colorines reservoirs 
Temascaltepec reservoir Additional reservoir with larger storage capacity 
Platform at Bosque Decreased dead storage level at Bosque reservoir 
Tuxpan Pump Pumping groundwater below Tuxpan during dry season 
Tuxpan Irrigation New larger capacity canal for irrigators at Tuxpan 
Villa Victoria Pressurized Tunnel New pressurized tunnel (20 m3/s) to connect pumps to Villa Victoria and Villa Victoria to Los Berros 
Villa Victoria Pressurized Tunnel and Storage Expansion 50 MCM extra storage in Villa Victoria and the pressurized tunnel (above) 
InterventionBrief Description of Intervention
Villa Victoria Extra storage and canal 
Bosque-Colorines Canal Increased capacity of canal between Bosque and Colorines reservoirs 
Temascaltepec reservoir Additional reservoir with larger storage capacity 
Platform at Bosque Decreased dead storage level at Bosque reservoir 
Tuxpan Pump Pumping groundwater below Tuxpan during dry season 
Tuxpan Irrigation New larger capacity canal for irrigators at Tuxpan 
Villa Victoria Pressurized Tunnel New pressurized tunnel (20 m3/s) to connect pumps to Villa Victoria and Villa Victoria to Los Berros 
Villa Victoria Pressurized Tunnel and Storage Expansion 50 MCM extra storage in Villa Victoria and the pressurized tunnel (above) 

Source: HRGU Mass (2017b).

Close Modal

or Create an Account

Close Modal
Close Modal