Table 4

Cost estimation for the high, medium and low standard habitations

S No.PartUnits required for HSH, MSH and LSHCost per unit (XAF) for HSHCost per unit (XAF) for MSHCost per unit (XAF) for LSH
PVC circular pipe for gutter (Ø 3.5″) 1 each 2500 2500 2500 
PVC pipe (Ø 1.6″) 2 each 950 950 950 
90° Bends (Ø 1.6″) 6 each 800 800 800 
First flush diverter 1 each 15000 15000 Can be locally made 
Tank screen on opening of manhole and insect proof screen at all pipe end to tank 3 each 2075 1500 1000 
Cement bags 10, 8, 8 4450 4450 4450 
Rebar-iron rods for reinforcement (Ø 8 mm) 8 rods each 2500 2500 2500 
Sand (wheel.barrows) 12 wheelbarrows each 1500 1500 1500 
Gravel 16 wheelbarrows each 1800 1800 1800 
10 Fastening metal wire 5 rolls each 1000 1000 1000 
11 Sikalite waterproofing additives 8, 6, 6 sachets 1550 1550 1550 
12 HDPE inner tank lining 1 (43 m2) each 500/m2 500/m2 500/m2 
13a Hydrocyclone filter 1 each for the HSH and MSH 30055 30055 – 
13b Sand-charcoal-gravel filter 1 each for the LSH and/or MSH – Can be locally made Can be locally made 
14 Water level indicator 1 each for HSH and MSH 20350 10000 – 
15 Disinfection unit 1 each 22080 15400 15400 
16 Pump (if needed) 1 each 14300 14300 – 
17 Labour cost (XAF) – 30% of project cost (267410) = 80223 30% of project cost (236655) = 70996.5 30% of project cost (165800) = 49740 
18 Transport cost (XAF) – 20000 20000 15000 
 Total cost (XAF) – 367633 ($668) 327651.5 ($596) 230540 ($419) 
S No.PartUnits required for HSH, MSH and LSHCost per unit (XAF) for HSHCost per unit (XAF) for MSHCost per unit (XAF) for LSH
PVC circular pipe for gutter (Ø 3.5″) 1 each 2500 2500 2500 
PVC pipe (Ø 1.6″) 2 each 950 950 950 
90° Bends (Ø 1.6″) 6 each 800 800 800 
First flush diverter 1 each 15000 15000 Can be locally made 
Tank screen on opening of manhole and insect proof screen at all pipe end to tank 3 each 2075 1500 1000 
Cement bags 10, 8, 8 4450 4450 4450 
Rebar-iron rods for reinforcement (Ø 8 mm) 8 rods each 2500 2500 2500 
Sand (wheel.barrows) 12 wheelbarrows each 1500 1500 1500 
Gravel 16 wheelbarrows each 1800 1800 1800 
10 Fastening metal wire 5 rolls each 1000 1000 1000 
11 Sikalite waterproofing additives 8, 6, 6 sachets 1550 1550 1550 
12 HDPE inner tank lining 1 (43 m2) each 500/m2 500/m2 500/m2 
13a Hydrocyclone filter 1 each for the HSH and MSH 30055 30055 – 
13b Sand-charcoal-gravel filter 1 each for the LSH and/or MSH – Can be locally made Can be locally made 
14 Water level indicator 1 each for HSH and MSH 20350 10000 – 
15 Disinfection unit 1 each 22080 15400 15400 
16 Pump (if needed) 1 each 14300 14300 – 
17 Labour cost (XAF) – 30% of project cost (267410) = 80223 30% of project cost (236655) = 70996.5 30% of project cost (165800) = 49740 
18 Transport cost (XAF) – 20000 20000 15000 
 Total cost (XAF) – 367633 ($668) 327651.5 ($596) 230540 ($419) 

Where: HSH, High Standard Habitations; MSH, Medium Standard Habitations; LSH, Low Standard Habitations; HDPE, High Density Polyethylene; XAF, Central African CFA franc; 1′′ = 2.54 cm.