Skip to Main Content
Due to the limited area of green space, the area required for the CE-SG scenario exceeds the available area of the site, so this scenario cannot be achieved. The peak flow of other scenarios under different rainfall return periods is shown in Table 8, and the peak flow reduction rate is shown in Figure 3.
Table 8

Simulation results of single LID facility scheme

Rainfall return period (a)Pre-developmentPost-development
CE-BPCE-IPCE-REDE-SGDE-BPDE-IPDE-RE
Peak flow 1a 19.19 3.33 4.4 5.09 1.86 2.36 2.64 2.07 
2a 23.96 3.77 5.1 6.09 2.67 2.75 4.11 2.63 
3a 26.91 4.06 5.5 6.69 3.09 2.94 6.04 2.96 
5a 30.77 4.46 6.37 7.46 3.54 3.07 7.67 3.39 
10a 36.2 5.02 9.51 8.53 3.97 3.3 9.96 3.98 
20a 41.83 5.6 13.4 9.66 4.46 3.56 12.68 4.55 
Rainfall return period (a)Pre-developmentPost-development
CE-BPCE-IPCE-REDE-SGDE-BPDE-IPDE-RE
Peak flow 1a 19.19 3.33 4.4 5.09 1.86 2.36 2.64 2.07 
2a 23.96 3.77 5.1 6.09 2.67 2.75 4.11 2.63 
3a 26.91 4.06 5.5 6.69 3.09 2.94 6.04 2.96 
5a 30.77 4.46 6.37 7.46 3.54 3.07 7.67 3.39 
10a 36.2 5.02 9.51 8.53 3.97 3.3 9.96 3.98 
20a 41.83 5.6 13.4 9.66 4.46 3.56 12.68 4.55 
Figure 3

Flood peak flux reduction rate of single LID facility scheme.

Figure 3

Flood peak flux reduction rate of single LID facility scheme.

Close modal
Close Modal

or Create an Account

Close Modal
Close Modal