A summary of tests performed in the field by ponding methods is given in Table 4. A total of eight ponding tests were performed on eight channels with an average pod size of 697 ft (1 ft = 0.3048 m). Tests were repeated to obtain more accurate estimates. Tests on Lagar Disty. and Arian Minor-1 were repeated using ponding methods as well, to obtain better and more accurate estimates of seepage rates.

Table 4

Summary of the ponding tests performed (1 ft = 0.3048 m)

Test NoName of channelsLength of pond/test reach (ft)Total length of channel
Qaim Minor 595 25,420 
Khewra Disty 740 76,100 
Shaheena Disty 500 11,500 
Zam Disty 535 24,974 
Safdarabad Disty 500 21,200 
Rojhan Minor 635 35,000 
Lagar Disty. 600 62,215 
Arain Minor-1 670 65,547 
Test NoName of channelsLength of pond/test reach (ft)Total length of channel
Qaim Minor 595 25,420 
Khewra Disty 740 76,100 
Shaheena Disty 500 11,500 
Zam Disty 535 24,974 
Safdarabad Disty 500 21,200 
Rojhan Minor 635 35,000 
Lagar Disty. 600 62,215 
Arain Minor-1 670 65,547 