The falling-head slug test method was used on both wells, in accordance with the design guidelines set out by Butler (1997). The slug was introduced into the boreholes by pouring a known volume of water into the boreholes, after which the head drop was monitored with groundwater transducers and dippers (see set-up parameters in Table 2).

Table 2

Slug testing parameters

WellWater level below measurement point (m)Volume of water injected (L)Expected theoretical rise in water level after slugging (m)Real rise in water level after slugging (m)
Hilly borehole 14.33 15.3 0.993 1.0 
Valley borehole 5.170 15.3 0.993 0.990 
WellWater level below measurement point (m)Volume of water injected (L)Expected theoretical rise in water level after slugging (m)Real rise in water level after slugging (m)
Hilly borehole 14.33 15.3 0.993 1.0 
Valley borehole 5.170 15.3 0.993 0.990 

Close Modal

or Create an Account

Close Modal
Close Modal