Skip to Main Content
Table 1

Set of input data observed at the investigated drainage pond between the years 2010 and 2013

Input dataUnitsMonitoring phase
Inflow m3 d−1 2010-08-23 to 2012-06-11; 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05; 2013-09-30 to 2013-09-27 
Precipitation m3 d−1 
Outflow m3 d−1 
Pond level m asl 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05 
Groundwater level m asl 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05; 2013-09-30 to 2013-09-27 
Volume m3 2013-11-15 
Surface area ha 2013-11-15 
Evaporation m3 d−1 Input data for calculation provided in daily resolution by German Weather Service for station Schleswig from 2010-08-23 to 2012-06-11; 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05; 2013-09-30 to 2013-09-27 
KF m s−1 2013, borehole geophysical method 
Impermeable soil layer 2013, Pürckhauer drilling 
Input dataUnitsMonitoring phase
Inflow m3 d−1 2010-08-23 to 2012-06-11; 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05; 2013-09-30 to 2013-09-27 
Precipitation m3 d−1 
Outflow m3 d−1 
Pond level m asl 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05 
Groundwater level m asl 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05; 2013-09-30 to 2013-09-27 
Volume m3 2013-11-15 
Surface area ha 2013-11-15 
Evaporation m3 d−1 Input data for calculation provided in daily resolution by German Weather Service for station Schleswig from 2010-08-23 to 2012-06-11; 2012-10-18 to 2013-01-03; 2013-04-17 to 2013-14-05; 2013-09-30 to 2013-09-27 
KF m s−1 2013, borehole geophysical method 
Impermeable soil layer 2013, Pürckhauer drilling 
Close Modal

or Create an Account

Close Modal
Close Modal