Skip to Main Content
Table 2

Description of installed sanitary barriers, number of consumers, and the monitoring period of the cisterns used during Phase 3

Sampling points (description)CoordinatesFirst flush device (DesviUFPE)Hand pumpNumber of consumersMonitoring period
C1 08°12′32.9″ Installed Installed 12 months 
36°5′34.4″ 
C2 08°12′25.9″ Installed Installed 24 months 
36°4′32.5″ 
C3 08°12′32.9″ NI NI 24 months 
36°5′33.7″ 
C4 08°12′.7″ Installeda Installeda 24 months 
36°5′40.5″ 
C5 09°12′27.9″ NI Installed 12 months 
36°5′29.0″ 
C6 08°13′36.1″ NI NI 12 months 
36°02′52.9″ 
C7 08°13′.6″ NI NI 12 months 
36°00′42.3″ 
C8 08°13′21.9″ NI NI 12 months 
36°00′40.9″ 
Sampling points (description)CoordinatesFirst flush device (DesviUFPE)Hand pumpNumber of consumersMonitoring period
C1 08°12′32.9″ Installed Installed 12 months 
36°5′34.4″ 
C2 08°12′25.9″ Installed Installed 24 months 
36°4′32.5″ 
C3 08°12′32.9″ NI NI 24 months 
36°5′33.7″ 
C4 08°12′.7″ Installeda Installeda 24 months 
36°5′40.5″ 
C5 09°12′27.9″ NI Installed 12 months 
36°5′29.0″ 
C6 08°13′36.1″ NI NI 12 months 
36°02′52.9″ 
C7 08°13′.6″ NI NI 12 months 
36°00′42.3″ 
C8 08°13′21.9″ NI NI 12 months 
36°00′40.9″ 

NI, not installed.

aDesviUFPE and hand pump installed in the 13th month.

Close Modal

or Create an Account

Close Modal
Close Modal