Skip to Main Content
Table 1

Behavior of Pseudomonas aeruginosa in spray water from warm-water bidet toilet seats

Survey no.Spray waterBidet toilet seatYearSample sizeP. aeruginosa
GM (MPN/mL)(GSD)Positive numberDetection rate (%)
Survey 1-1 TT-1f Tank type 2012 7a 0.2 (15.1) 71.4 
Survey 1-2 TT-1f Tank type 2013 4b 0.5 (1.3) 100 
Survey 1-3 TT-1f Tank type 2015 1c 0.02 (–) 100 
Survey 1-1 TT-1 m Tank type 2012 7a 2.3 (12.8) 85.7 
Survey 4 TT-1 m-2 Tank type 2013 19c 0.04 (3.2) 18 94.7 
Survey 4 TT-2 m-2 Tank type 2013 19d 0.11 (3.6) 18 94.7 
Survey 4 TT-3 m Tank type 2013 19d 0.02 (2.2) 26.3 
Survey 4 TT-4 m Tank type 2013 19d 0.01 (–) 10.5 
Survey 4 TT-5 m Tank type 2013 19d n.d. (–) 
Survey 4 TT-6 m Tank type 2013 19d n.d. (–) 
Survey 4 TT-7 m Tank type 2013 19d n.d. (–) 
Survey 5 OD-1 m On-demand type 2014 5e 2.3 (2.2) 100 
Survey 5 OD-2 m On-demand type 2014 5e n.d. (–) 
Survey 5 OD-3 m–OD-7 m On-demand type 2014 5e n.d. (–) 
Survey 5 OD-8 m–OD-12 m On-demand type 2014 5e n.d. (–) 
Survey no.Spray waterBidet toilet seatYearSample sizeP. aeruginosa
GM (MPN/mL)(GSD)Positive numberDetection rate (%)
Survey 1-1 TT-1f Tank type 2012 7a 0.2 (15.1) 71.4 
Survey 1-2 TT-1f Tank type 2013 4b 0.5 (1.3) 100 
Survey 1-3 TT-1f Tank type 2015 1c 0.02 (–) 100 
Survey 1-1 TT-1 m Tank type 2012 7a 2.3 (12.8) 85.7 
Survey 4 TT-1 m-2 Tank type 2013 19c 0.04 (3.2) 18 94.7 
Survey 4 TT-2 m-2 Tank type 2013 19d 0.11 (3.6) 18 94.7 
Survey 4 TT-3 m Tank type 2013 19d 0.02 (2.2) 26.3 
Survey 4 TT-4 m Tank type 2013 19d 0.01 (–) 10.5 
Survey 4 TT-5 m Tank type 2013 19d n.d. (–) 
Survey 4 TT-6 m Tank type 2013 19d n.d. (–) 
Survey 4 TT-7 m Tank type 2013 19d n.d. (–) 
Survey 5 OD-1 m On-demand type 2014 5e 2.3 (2.2) 100 
Survey 5 OD-2 m On-demand type 2014 5e n.d. (–) 
Survey 5 OD-3 m–OD-7 m On-demand type 2014 5e n.d. (–) 
Survey 5 OD-8 m–OD-12 m On-demand type 2014 5e n.d. (–) 

GM, geometric mean; GSD, geometric standard deviation; n.d., not determined.

aSampling date: October 30; November 6, 8, 9, 12, and 19; December 11.

bSampling date: August 16 and 31; September 1 and 9.

cSampling date: June 15.

dSampling date: August 31; September 1 and 9; October 7 and 21; November 11–15, 18, 21, 25, and 28; December 2, 5, 9, 12, and 16.

eSampling date: August 11, September 18, October 29, November 20, and December 17.

Close Modal

or Create an Account

Close Modal
Close Modal