The SHAFDAN is the largest wastewater treatment plant in Israel and currently treats 360,000 m3/day of municipal wastewater, about 92% of its treatment capacity. Waste sludge from the plant is discharged to the Mediterranean Sea through a marine outfall. The SHAFDAN is committed to ending the disposal of its sludge to the sea by the end of 2016 by providing a land-based biosolids management program that produces a Class A biosolids for agricultural use. In order to implement this strategy, a number of large-scale construction projects were undertaken. These projects include a new sludge thickening and dewatering facility, updated headworks, a new primary treatment facility, and a new 3-stage thermophilic anaerobic digestion facility. The total capital cost of these projects is estimated to be US $300 million. This paper describes the principal components of these projects and their design parameters.
Skip Nav Destination
Article navigation
Research Article|
June 01 2016
SHAFDAN (Greater Tel Aviv Wastewater Treatment Plant): recent upgrade and expansion
Arie Messing;
Arie Messing
*
aBalasha-Jalon Infrastructure Systems, Haifa, Israel
*Corresponding author. E-mail: [email protected]
Search for other works by this author on:
Yuval Sela
Yuval Sela
bIgudan-Dan Region Association for Environmental Infrastructure, Tel-Aviv, Israel
Search for other works by this author on:
Water Practice and Technology (2016) 11 (2): 288–297.
Citation
Arie Messing, Yuval Sela; SHAFDAN (Greater Tel Aviv Wastewater Treatment Plant): recent upgrade and expansion. Water Practice and Technology 1 June 2016; 11 (2): 288–297. doi: https://doi.org/10.2166/wpt.2016.032
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00