The new Changi Water Reclamation Plant (CWRP) in Singapore is designed for ultimate expansion to 2,400,000 m3/day. Construction of the initial 800,000 m3/day phase began in 2001 and will be completed in mid 2008. Designed as a compact, underground facility, the plant incorporates stacked rectangular primary and secondary clarifiers along with the anoxic step feed process. Solids processing consists of centrifuge thickening, anaerobic digestion, centrifuge dewatering, and thermal drying. A 227,000 m3/day “NEWater® Factory”, or Reclaimed Water Production Plant, will be constructed under a Design Build Own and Operate (DBOO) concession on top of the liquid process modules to produce high grade water for indirect potable and non-potable uses. Phased start-up of the facility began in February, 2007 and has continued through 2008. Initial performance has generally met expectations, resulting in excellent performance when the plant is not hydraulically overloaded, partial nitrification and denitrification as intended with the anoxic step feed process used which provided stable treatment and avoided significant pH depression, and SVI values which averaged 105 mL/g and were consistently below 150 mL/g.
Skip Nav Destination
Article navigation
Research Article|
December 01 2008
Start-up and Initial Operation of Singapore's 800,000 m3/day Changi Water Reclamation Plant
G. T. Daigger;
1CH2M HILL, 9191 South Jamaica Street, Englewood, CO, 80112 USA
E-mail: [email protected]
Search for other works by this author on:
G. A. Nicholson;
G. A. Nicholson
2CH2M HILL, 150 Beach Road, Singapore 189720
Search for other works by this author on:
C. L. Y. Koh;
C. L. Y. Koh
2CH2M HILL, 150 Beach Road, Singapore 189720
Search for other works by this author on:
W. H. Moh;
W. H. Moh
3PUB, 40 Scotts Road, #15-01 Environment Building, Singapore 228231
Search for other works by this author on:
J. C. Young;
J. C. Young
3PUB, 40 Scotts Road, #15-01 Environment Building, Singapore 228231
Search for other works by this author on:
Y. A Ghani;
Y. A Ghani
3PUB, 40 Scotts Road, #15-01 Environment Building, Singapore 228231
Search for other works by this author on:
W. H. Yong
W. H. Yong
3PUB, 40 Scotts Road, #15-01 Environment Building, Singapore 228231
Search for other works by this author on:
Water Practice and Technology (2008) 3 (4): wpt2008089.
Citation
G. T. Daigger, G. A. Nicholson, C. L. Y. Koh, W. H. Moh, J. C. Young, Y. A Ghani, W. H. Yong; Start-up and Initial Operation of Singapore's 800,000 m3/day Changi Water Reclamation Plant. Water Practice and Technology 1 December 2008; 3 (4): wpt2008089. doi: https://doi.org/10.2166/wpt.2008.089
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00