In 2004, the World Health Organization proposed a new approach to risk assessment and risk management for drinking-water supplier, which is based on HACCP (Hazard Analysis and Critical Control Point) and termed “Water Safety Plans (WSPs)”. About four years later, Tokyo Waterworks developed WSPs in March 2008. In the WSPs of Tokyo Waterworks, control criteria are set for risk-related water quality items with general principle of using a 10 –50% value of the water quality standards, for the purpose of the early detection of the potential risk. On February 2008, a concentration of 1,4-dioxane exceeded the control criteria, which was set as 10% value (= 0.005mg/L) of the Japanese drinking-water quality standard (= 0.05mg/L). Removal of 1,4-dioxane in purification process is very difficult, so effective control measure of 1,4-dioxane is only by decreasing the concentration in raw water. However, the catchment management is outside the jurisdiction of the Tokyo Waterworks. This article represents a case study of the implementation of WSPs, focused on the efforts for protection raw water against 1,4-dioxane in Misato Purification Plant, which was selected as a model and started implementation since April 2007 precedent to other purification plant.
Skip Nav Destination
Article navigation
Research Article|
September 01 2010
Implementation of Water Safety Plan Efforts to Improvement of Source Water Quality in Tokyo Waterworks
H. Yamada;
H. Yamada
*
1Purification Division, Tokyo Waterworks Bureaut, 2-8-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo, Japan
*Corresponding Author, E-mail: [email protected]
Search for other works by this author on:
M. Ikeda;
M. Ikeda
1Purification Division, Tokyo Waterworks Bureaut, 2-8-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo, Japan
Search for other works by this author on:
K. Suzuki;
K. Suzuki
1Purification Division, Tokyo Waterworks Bureaut, 2-8-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo, Japan
Search for other works by this author on:
S. Konishi;
S. Konishi
1Purification Division, Tokyo Waterworks Bureaut, 2-8-1, Nishi-Shinjuku, Shinjuku-ku, Tokyo, Japan
Search for other works by this author on:
T. Oikawa
T. Oikawa
2Higashimurayama Purification Plant, Tokyo Waterworks Bureau, 2-20-236, Misumi-cho, Higashimurayama-shi, Tokyo, Japan
Search for other works by this author on:
Water Practice and Technology (2010) 5 (3): wpt2010050.
Citation
H. Yamada, M. Ikeda, K. Suzuki, S. Konishi, T. Oikawa; Implementation of Water Safety Plan Efforts to Improvement of Source Water Quality in Tokyo Waterworks. Water Practice and Technology 1 September 2010; 5 (3): wpt2010050. doi: https://doi.org/10.2166/wpt.2010.050
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00