Clean water resources are imperative for sustainable development. Thus, protection and management of waters receiving wastewater discharges have received significant attention from policy and regulatory bodies. The quality of wastewater effluent must meet regional (e.g. Water Framework Directive), national and local discharge standards. In addition, there is now significant pressure on engineers and operators to reduce energy consumption, sludge production and operation/maintenance issues, particularly at small-scale and decentralized wastewater facilities. Therefore, significant interest has risen in new technologies and operational insights which can (i) minimize operating costs; (ii) simplify and reduce the use of mechanical equipment; (iii) result in low sludge production; and (iv) ease operation/maintenance. This study investigated the performance of a small-scale municipal wastewater facility over 5 months from commissioning. The facility uses a new biofilm-based technology – the pumped flow biofilm reactor. Two experimental periods Phase 1 (28 to 36 days) and Phase 2 (Days 100 to 146) were examined. During Phase 2, removal rates averaged 98% for 5-day biochemical oxygen demand (BOD5), 93% for total suspended solids, and 94% ammoniacal-nitrogen (NH4-N). Energy requirements averaged 0.22 kWh.m treated−3 and 1.74 kWh.kg-BOD5 removed−1. Extensive, camera-based studies revealed minimal excess sludge in the reactor tanks and sludge removal was not required during the study period. The use of vertically stacked plastic media to support the biofilm may have limited biofilm sloughing. Sludge yield during steady state operation was estimated at around 0.03 g-SS.g-COD removed−1. The study indicates that given careful design and operation, small-scale wastewater treatment systems can be as efficient as much larger, fully manned plants.

The protection and management of water resources is crucial for sustainable development and is therefore prioritized by governments and international organizations – e.g. UN and WHO. Both developed and developing economies focus on wastewater infrastructure investments. Challenges to the wastewater industry include climate change, population growth, a volatile global economy, increasing energy prices, heightened environmental awareness, and more complex regulatory and social circumstances (Marlow et al. 2013). To combat these, decentralization is increasingly recognized as an alternative management strategy to the norm of centralized wastewater collection and treatment. Decentralization is being adopted widely, e.g. in the USA, Japan, Australia and Italy (Libralato et al. 2012). Small-scale decentralized wastewater treatment systems, however, have design and operational challenges that can affect performance, including; (i) lack of permanent operators and local expertise, (ii) relatively high energy costs, (iii) sludge handling, (iv) compliance with strict discharge licenses, (v) variable influent hydraulic or organic loads, and (vi) inflexible operating regimes.

In Europe the Urban Wastewater Treatment Directive (UWWTD) (91/271/EEC) specifies standards for effluent discharged from places with population equivalents (PEs) exceeding 2,000. The Water Framework Directive (WFD) (2000/60/EC) specifies quality standards for effluent discharged from places with certificates of authorization (<500 PE) and with discharge licenses (>500 PE). These directives also regulate monitoring requirements, protect high-status waters and prevent further deterioration of all waters. Tight regulations challenge decentralized wastewater treatment plant (WWTP) operators to meet performance targets against an increasing need to minimize operating costs.

Approximately 80% of European WWTPs are designed for less than 5,000 PE (García 2009, EPA 2013). In Ireland approximately 94% of WWTPs operated by Irish Water have a PE below 10,000; 83% of these plants serve PEs below 2,000 (EPA 2014). Similar situations exist elsewhere. For example, 57% of the China's population live in 2.79 million villages accounting for 768.8 million people (Guo et al. 2014). Many small-scale WWTPs are likely to be unmanned.

Compliance with regulations varies widely. In Europe, average secondary treatment compliance rates are 88% for the original 15 EU member states but 39% in states that joined after 2004 (EC 2013). In Ireland, despite significant investment, 21% of WWTPs (>2,000 PE) have not complied with discharge standards (EPA 2014). Many WWTPs serving populations of less than 2,000 PE may have little or no monitoring, further exacerbating the situation. Furthermore, the ecological status of 58% of European surface waters is deemed less than good. In China, the quality of 40.1% of river waters is Grade IV or below (WEPA 2012). Despite recent urbanization in China, approximately 50% of discharges originate from rural areas, where increasing numbers of flush toilets contribute this challenge (Guo et al. 2014).

Operation and maintenance

In addition to strict discharge limits, increased concern related to energy efficiency is a key focus in the wastewater sector (Kim & Hao 2001). The transport and treatment of water and wastewater is estimated to account for 7 or 8% of the world's energy consumption, with 4,600 Mm3 of water consumed annually to generate it (IEA 2012; Hoffman 2014). These figures are expected to rise by 33% by 2020 (IEA 2012), so methods of reducing energy consumption must be explored throughout wastewater treatment stages. In general, approximately 33% of the total operating cost of WWTP's is attributed to energy requirements (Fernández et al. 2011), with that needed for aeration representing up to 65% of such consumption (op. cit).

Increased difficulties also arise from sludge handling in small-scale WWTPs. WWTP sludge disposal in Europe is subject to increasing legal and social constraints, and accounts for up to 60% of plant operating costs (Paul et al. 2006). Reducing excess sludge production is appealing; particularly at decentralized, or smaller or remote facilities, where sludge treatment or re-use may not be feasible on-site, and transport costs can be high.

Operation and maintenance costs associated with small-scale WWTPs are of further concern (O'Reilly et al. 2011). Sophisticated wastewater treatment systems in remote areas can be hindered by lack of skilled workers, and operating and maintenance simplicity can determine the long-term success of a plant (Kalbar et al. 2012).

The pumped flow biofilm reactor (PFBR) is a novel, biofilm-based, batch process technology, designed to alleviate the issues cited above. Although it has been extensively tested at laboratory- and pilot- scale, and tested on-site, a full small-scale, municipal application has not yet been examined (Rodgers et al. 2004; Zhan et al. 2006; O'Reilly et al. 2008). The aim of this study is to investigate PFBR performance in treating municipal wastewater in a village in Ireland. The study was made in relation to effluent quality, energy consumption, sludge accumulation and maintenance requirements.

Test site

The study was conducted in Moneygall, Co. Offaly, Ireland – population 310 (CSO 2011). The plant installed comprised; preliminary screen, primary settlement and balance tanks, and the PFBR unit – divided into two, independent, parallel streams – A and B. The PFBR system was installed in an in-situ concrete tank with six chambers, three per stream (Figure 1). Each PFBR stream comprised two reactor chambers (Reactors 1 & 2) and a clarification chamber. The facility replaced an existing, overloaded system consisting of; preliminary screening, an Imhoff tank, trickling filters and a final settlement tank. The preliminary screening system was retained and the Imhoff tank was reused as the primary settlement tank. The trickling filters and final settlement tank were decommissioned. A new control room was constructed to house the PFBR's control panel.
Figure 1

Schematic of two-stream PFBR system housed in a single unit.

Figure 1

Schematic of two-stream PFBR system housed in a single unit.

Close modal

Reactors and plastic biofilm media

Each of the four PFBR reactor chambers had a working volume of 42.2 m3 and contained plastic media. The media blocks comprised vertical trapezoidal tubes with a specific surface of 230 m2.m−3, giving a total surface of 15,130 m2 (including internal tank wall surfaces) per stream. The media were supported above the base of each reactor chamber (Figure 2), to enhance circulation and provide storage for any sludge generated.
Figure 2

Cross-section through a single stream of the PFBR installation.

Figure 2

Cross-section through a single stream of the PFBR installation.

Close modal

System operation

The PFBR was operated as a sequencing, batch biofilm reactor process, with typical phases including; fill/draw, anoxic and aerobic, as illustrated in Figure 3. The phases were combined with rest periods to allow removal of organic carbon, suspended solids and nitrogen. Each reactor chamber was fitted with a submersible hydraulic circulation pump, a submersible sludge pump and a level sensor. The discharge pipework from the hydraulic circulation pump in Reactor 2 had two electrically actuated valves, which allowed the system to divert flow to Reactor 1 or the clarifier, as required. At any time in each stream, there was only one reactor volume of wastewater in the two-tank system.
Figure 3

Overview of typical treatment cycle in a PFBR unit.

Figure 3

Overview of typical treatment cycle in a PFBR unit.

Close modal

Sludge pumps were installed as a means of preventing sludge accumulation on the bottom of the reactor chambers. The clarifier was equipped with a submersible sludge pump, a level sensor and an electrically actuated discharge valve. The latter controlled the slow release of treated wastewater into the receiving water course, buffering the impact of batch releases from the PFBR. The balance tank was fitted with two submersible hydraulic feed pumps, one per PFBR stream, and a level sensor.

The PFBR was controlled by a programmable logic controller that allowed the operator to vary control parameters like water levels and treatment cycle length. All process information was displayed on a screen.

The study, conducted over five months, was split in two –Phase 1 (Days 28 to 36) and Phase 2 (Days 100 to 146). Initially the PFBR was operated to achieve carbonaceous oxidation and nitrification. On Day 37 the regime was enhanced to improve nitrogen removal efficiencies (Table 1). This was achieved by prolonging rest periods between reactor transfers and equalization times, and introducing an anoxic period, thus increasing the bacteria-wastewater contact time. Streams A and B were operated in the same manner, and received similar wastewater loads. The parameters analyzed included, organic carbon and nitrogen removal, sludge accumulation, hydraulic flows and energy consumption.

Table 1

Phases and phase times used in each cycle

Phase 1
Phase 2
total cycle
Aeration
Periodtime (minutes)Periodtime (minutes)Periodtime (minutes)Periodtime (minutes)
Fill/draw (1) 14 Equalization (3a) Fill/draw (1) 14 Equalization (3a) 
Anoxic (2) Pump (3b) Anoxic (2) 30 Pump (3b) 
Aeration (3) 266 Rest (3c) Aeration (3) 364 Rest (3c) 
Pre-draw (4) 14 Equalization (3d) Pre-draw (4) 12 Equalization (3d) 
Total cycle 294 Pump (3e) Total cycle 420 Pump (3e) 
  Rest (3f)   Rest (3f) 
  Cycle count   Cycle Count 
Phase 1
Phase 2
total cycle
Aeration
Periodtime (minutes)Periodtime (minutes)Periodtime (minutes)Periodtime (minutes)
Fill/draw (1) 14 Equalization (3a) Fill/draw (1) 14 Equalization (3a) 
Anoxic (2) Pump (3b) Anoxic (2) 30 Pump (3b) 
Aeration (3) 266 Rest (3c) Aeration (3) 364 Rest (3c) 
Pre-draw (4) 14 Equalization (3d) Pre-draw (4) 12 Equalization (3d) 
Total cycle 294 Pump (3e) Total cycle 420 Pump (3e) 
  Rest (3f)   Rest (3f) 
  Cycle count   Cycle Count 

Numbers in parentheses refer to the steps shown in Figure 3.

Sampling and analysis

Throughout the study, daily composite influent and effluent samples were taken using refrigerated automatic samplers. Influent samples were taken from the balance tank and effluent samples from the clarifier chamber of Stream A prior to discharge. Influent flows were measured using an ultrasonic sensor and a flume (Siemens Hydroranger 200).

Total chemical oxygen demand (CODt) and total suspended solid (TSS) were tested in accordance with standard methods (APHA AWWA & WEF 2005). Five day carbonaceous biochemical oxygen demand (cBOD5) was measured using WTW Oxitop meters with a Lovibond nitrification inhibitor (N-ATH). Filtered and unfiltered total nitrogen (TN and TNt, respectively) were measured using a Biotector TOC TN TP Analyser. Filtered ammoniacal-nitrogen (NH4-N), and nitrite- and nitrate- nitrogen (NO2-N and NO3-N) were measured using a Thermo Clinical Labsystem, Konelab 20 Nutrient Analyser. Filtered wastewater samples were passed through 1.2 μm Whatman GF/C microfiber filters. Energy usage was measured with a built in Socomec energy meter, but only during the final two months of the study. Hach sc1000 multimeters monitored data collected from ammonium, nitrate and dissolved oxygen probes at 1 minute intervals. Each probe was maintained 300 mm off the floor of Reactor 1. All instruments were calibrated in accordance with manufacturers' instructions.

Sludge accumulation monitoring

Submersible hydraulic pumps were installed in the voids at the base of the media modules to manage potential sludge build up. As there was no such build up, the pumps were never used during the 5-month study. When the study ended, a remote-controlled, closed circuit television (CCTV) survey was conducted to confirm the lack of sludge. The CCTV camera was put into the voids of both reactor, 1 and 2, of Stream A. It was used to examine all areas, especially the rectangular tank corners, where sludge was expected to build-up. The same study was repeated 13 months later, when the sludge pumps had been operated once each month, moving 5.3 m3 to a sludge storage tank that overflows into the primary tank.

During the start-up period (Days 1 to 27), effluent discharged from the PFBR system was recirculated to the primary settlement tank. In addition, the existing trickling filter system was operated to ensure that there was no additional risk to the receiving water during PFBR commissioning. During these four weeks a population of micro-organisms was allowed to develop naturally; no external seed sludge was used. After this time, the PFBR had reached a pseudo steady-state whereby average daily effluent results were consistent. Table 2 summarizes system performance during experimental phases 1 (Days 28 to 36) and 2 (91 to 146).

Table 2

Average influent and effluent organic carbon, nitrogen and TSS concentrations of the PFBR unit during Phases 1 and 2

Phase 1Phase 2
mg.L−1InfluentaEffluentb% removalInfluentaEffluentb% removal
BOD5 151 (18.6,7) 8 (5,7) 95 121 (42.7,26) 3 (2.7,40) 98 
CODt­ 179 (30.8,6) 26 (6.3,7) 86 149 (58.9,12) 24(8.9,17) 83 
TSS 161 (68,7) 4.3 (1.5,7) 97 54 (18,36) 3.6 (1.6,46) 93 
NH4-N 9.7 (1.6,6) 2.4 (0.5,9) 75 13.9 (4.4,36) 0.9 (0.7,46) 94 
NO3-N – 5.6 (0.9,9) – – 8.6 (1.1,46) – 
TNt 13.9 (2.1,6) 11 (1.1,9) 21 17.9 (6.3,36) 12.4 (1.1,38) 31 
Phase 1Phase 2
mg.L−1InfluentaEffluentb% removalInfluentaEffluentb% removal
BOD5 151 (18.6,7) 8 (5,7) 95 121 (42.7,26) 3 (2.7,40) 98 
CODt­ 179 (30.8,6) 26 (6.3,7) 86 149 (58.9,12) 24(8.9,17) 83 
TSS 161 (68,7) 4.3 (1.5,7) 97 54 (18,36) 3.6 (1.6,46) 93 
NH4-N 9.7 (1.6,6) 2.4 (0.5,9) 75 13.9 (4.4,36) 0.9 (0.7,46) 94 
NO3-N – 5.6 (0.9,9) – – 8.6 (1.1,46) – 
TNt 13.9 (2.1,6) 11 (1.1,9) 21 17.9 (6.3,36) 12.4 (1.1,38) 31 

Figures in brackets refer to the standard deviation and number of samples analyzed, respectively.

aSamples taken from the balance tank.

bSamples taken from Stream A clarifier chamber prior to discharge.

Hydraulic loading rates

The average volume treated in Streams A and B was 60 m3.day−1 and 55 m3.day−1, respectively. This equates to a hydraulic loading of 371 liters.person−1.day−1. Influent flows were variable and higher than expected, due to high storm water input. Figure 4 illustrates rainfall data from a local weather station (Gurteen College) between Days 86 and 146. The maximum and minimum influent flows to Stream A were 99 m3.day−1 and 20 m3.day−1, respectively, and 88 m3.day−1 and 20 m3.day−1, respectively, to Stream B. The average media total surface area loading and volumetric loading rates were 3.97 L.m−2media surface area.day−1 and 1.42 m3.m−3media volume.day−1 respectively for Stream A, and 3.64 L.m−2media surface area.day−1 and 1.3 m3.m−3media volume.day−1 for Stream B.
Figure 4

Daily rainfall data taken from Gurteen College weather station (MET 2012) (17.5 km from Moneygall).

Figure 4

Daily rainfall data taken from Gurteen College weather station (MET 2012) (17.5 km from Moneygall).

Close modal

Organic carbon

Influent and effluent oxygen demand were analyzed as BOD5 and CODt. The influent and effluent BOD5 concentrations for Phases 1 and 2 averaged 151 mg.L−1 and 8 mg.L−1, and 121 mg.L−1 and 3 mg.L−1 respectively. This equates to average loading rates of 56 and 59 g-BOD5.person−1.day−1 for phases 1 and 2 respectively. Average removal rates were 0.57 (Phase 1) and 0.47 g-BOD5.m−2media surface area.day−1 (Phase 2). Influent and effluent CODt concentrations for Phases 1 and 2 averaged 179 mg.L−1 and 26 mg.L−1, and 149 mg.L−1 and 24 mg.L−1, respectively, equating to removal rates of 0.61 g-COD.m−2media surface area.day−1 and 0.50 g-COD.m−2media surface area.day−1 for Phases 1 and 2, respectively. The facility consistently complied with the UWWTD discharge limits of 125 mg-CODt.L−1 and 25 mg-BOD5.L−1 throughout the study.

Nitrogen

During Phase 1, loading rates averaged 0.055 g-NH4-N.m−2media surface area.day−1 and 0.038 g-NH4-N.m−2media surface area.day−1, respectively. Corresponding removal rates were 0.012 and 0.029 g-NH4-N.m−2media surface area.day−1. Loading rates in Phase 2 averaged 0.071 and 0.055 g-NH4-N.m−2media surface area.day−1. Corresponding removal rates averaged and 0.034 g-NH4-N.m−2media surface area.day−1. Ammonia loading rates averaged 3.6 and 5.2 g-NH4-N.person−1.day−1. Effluent NO3-N concentrations increased from 5.6 to 8.6 mg.L−1, from Phase 1 to Phase 2. Total nitrogen removal was 183% higher in Phase 2 than in Phase 1, which can be attributed to the enhanced contact time during Phase 2. Figure 5 illustrates the ammonium, nitrate and dissolved oxygen concentration trends in a typical cycle from Phase 2. It also indicates that denitrification was not achieved as no drop in NO2-N followed influent dilution. In addition, DO concentrations remained above zero. It is considered likely that, if the anoxic period was extended by a further 30 minutes, denitrification could be achieved; due to limitations caused by the rainwater load, however, cycle duration could not be increased.
Figure 5

Typical DO, NH4-N and NO3-N concentration trends measured in Reactor 1 of stream A during Phase 2.

Figure 5

Typical DO, NH4-N and NO3-N concentration trends measured in Reactor 1 of stream A during Phase 2.

Close modal

TSS

Influent TSS averaged 161 (Phase 1) and 54 mg-TSS.L−1 (Phase 2). Effluent concentrations averaged 4.3 mg-TSS.L−1 and 3.6 mg-TSS.L−1 for Phases 1 and 2, respectively. These figures represent removal efficiencies of 97% (Phase 1) and 93% (Phase 2). All effluent concentrations were well within the UWWTD discharge limit of 35 mg-TSS.L−1 (EPA 2012).

Energy consumption

Energy use in Stream A was measured by component; (i) one 3.1 kW feed pump, (ii) two 3.1 kW circulation pumps, (iii) two 1.97 kW reactor chamber sludge pumps, (iv) one 1.97 kW clarifier chamber sludge pump, (v) four electrically actuated valves, and, (vi) control and monitoring equipment. The energy consumed by the domestic lighting and heaters, and the preliminary screening system and its controls, was not included in the analysis as they were subject to the control of the local governing authority operator. The use of light and heat can vary widely between WWTPs and depend on the operator on site. At small WWTPs these energy consumers (in particular heat) can impact significantly on energy use, due to operator preferences and/or heating being left on unintentionally. The preliminary screening system is an integral component of the overall system but its power consumption would have been minimal. Average energy requirements during the two-month test period were 0.22 kWh.m−3 treated and 1.74 kWh.kg BOD5 removed−1.

It is generally accepted that smaller facilities have higher unit costs because of lack of economies of scale. Typically the range for large conventional activated sludge plants is between 0.3 and 1.89 kWh.m−3 for inflows between 600 and 283,000 m3.day−1 (Mizuta & Shimada 2010). However, despite the PFBR being relatively small and the impacts of storm water (which can cause operational challenges), its energy consumption averaged 0.22 kWh.m−3. Furthermore, the passive aeration technique employed in the study can be easily controlled and optimized, by adjusting the rest periods in each tank and varying the number of pumping cycles.

Sludge accumulation

No sloughing events were observed during the study and effluent TSS concentrations remained low. Inspection with CCTV showed that no sludge build-up had occurred in either reactor over 5 months of operation. The sludge pumps were not operated in this period. In addition, following the start-up period, no additional biofilm growth was noted on the media (only visual inspections were possible). Equation (1) was used to estimate excess sludge yields.
formula
1

Where:

  • Xe = effluent suspended solids concentration, and

  • So and Se = influent and effluent substrate concentrations, respectively

Excess sludge yields were estimated at 0.03 g-TSS.g-COD removed−1 for each of Phases 1 and 2. These sludge yields are low relative to other technologies; typically, activated sludge technologies, for example, have a sludge yield of 0.4 g-VSS.g-COD−1 (Eddy & Metcalf 2004). While the sludge yields achieved are low, studies on the optimization of aerobic technologies treating paper pulp for reduced sludge production, have achieved 0.01 g-SS.g-COD removed−1 (Wei et al. 2003). Limited data are available on sludge yields for biofilm-based systems and the above figures should be taken as estimates only. The estimated sludge yield was favorable compared to that of a similar technology – the air suction flow biofilm reactor (ASF-BR) – which generated yields of between 0.2 and 0.69 g-SS.g-CODf removed−1, treating municipal wastewater (Clifford et al. 2013). In that study the biofilm growth medium comprised spherical, perforated balls. Clifford et al. (2013) hypothesize that the predominantly horizontal or slightly slanted surfaces were not conducive to biofilm attaching strongly to the medium and thus intermittent sloughing occurred, resulting in relatively high yields in the ASF-BR. In the PFBR, the biofilm is attached to vertically aligned media and thus resists gravitation forces and may also be less likely to slough as it adheres strongly (the operational characteristics of both the ASF-BR and PFBR were similar but the media were different, as mentioned above).

In this study, the biomass was exposed to repeated and prolonged relatively low organic carbon concentrations due to the nature of the influent wastewater that frequently included significant volumes of storm water. Under starved conditions, micro-organisms primarily utilize endogenous processes (Lu et al. 2007), which include cell maintenance and lysis, and regeneration, and can result in more substrate being respired to carbon dioxide and water, thus reducing biomass production (Low & Chase 1999; Abbassi et al. 2000; Liu & Tay 2001). Predation can also be an issue in biofilm systems (Parker et al. 1989) but it was not possible to measure the impacts (if any) of predation directly in this study. As the effluent quality remained high throughout this study, it is considered unlikely that there was significant biofilm loss by predation.

Repetition of the CCTV monitoring, after 13 months, showed a small build-up of sludge in both reactors of Stream A. The maximum depth of sludge accumulation was visually assessed, using CCTV, at 70 mm and 110 mm for Reactors 1 and 2, respectively. Sludge accumulations of 0.055 and 0.048 m3 for the two reactors were determined by visual estimation of the sludge surface areas in each reactor and applying Equation (1), used previously to estimate sludge yields in biofilm reactors (Rodgers & Clifford 2009).

Maintenance

As the facility only used hydraulic pumps and electrically actuated valves, maintenance was kept to a minimum. Pumps are usually maintained bi-annually or when required. Furthermore if pumping equipment fails it can be easily replaced by stand-by pumps. To reduce down time, every pump was fitted with a plug and socket electrical connection. This enabled the local caretaker to change a damaged pump single-handedly in an hour, without the assistance of an electrician.

A novel, municipal-scale wastewater treatment process has been designed, constructed and commissioned, and tested and analyzed over 5 months.

During Phase 1 of the study the average loading rates of BOD5, TNf and NH4-N were 0.6 g.m−2.day−1, 0.065 g.m−2.day−1 and 0.038 g.m−2.day−1, respectively. The estimated sludge yield was 0.032 g-SS.g-BOD5 removed−1.

During Phase 2, the system was optimized for enhanced nitrification, and average loading rates of BOD5, TNf and NH-N were 0.43 g.m−2.day−1, 0.07 g.m−2.day−1 and 0.05 g.m−2.day−1, respectively. The removal rates achieved during Phase 2 were 98%, 31%, and 94% for BOD5, TN and NH4-N, respectively. The estimated sludge yield was 0.03 g-BOD5removed−1.

The study showed that the installed system effectively achieved organic carbon and nitrogen removal. It also enabled excellent cycle control that can be used to optimize performance and minimize energy costs. The low sludge yields offer significant maintenance and financial benefits in decentralized environments. The system uses pumps only, and is robust and easy to maintain. The study shows the potential for passive aeration systems to meet new environmental and energy demands in the wastewater sector.

The PFBR is characterized by; (i) low operating costs; (ii) having no moving parts/compressors other than hydraulic pumps and actuated valves; (iii) producing little sludge, and (iv) being easy to operate and maintain.

The authors wish to acknowledge the financial support received from Enterprise Ireland, the Irish Research Council, Molloy Environmental Systems and Offaly County Council in the development of the Moneygall facility.

APHA, AWWA, WEF
,
2005
Standard Methods for the Examination of Water and Wastewater M.A.N
.
Franson
ed.,
Port City Press
,
Baltimore
,
USA
.
Clifford
E.
Forde
P.
McNamara
S.
Rodgers
M.
O'Reilly
E.
2013
The performance of a new technology – the air suction flow biofilm reactor (ASF-BR) – in treating municipal strength wastewater
.
Journal of Environmental Engineering
139
(
6
),
864
872
.
CSO
,
2011
Towns/Cities (Settlements) (824). Census 2011 Small Area Population Statistics (SAPS). http://www.cso.ie/en/census/census2011smallareapopulationstatisticssaps/ (accessed 20 April 2015)
.
EC
,
2013
Seventh Report on the Implementation of the Urban Waste Water Treatment Directive (91/271/EEC)
,
European Commission
,
Brussels
.
Eddy, Metcalf
,
2004
Wastewater Engineering. Treatment and Reuse
. 4th edn.
McGraw – Hill International Editions
,
Singapore
.
EPA
,
2012
Focus on Urban Waste Water Discharges in Ireland
.
EPA
,
Wexford
,
Ireland
.
EPA
,
2013
The Second Update Report on data presented in the EPA Report ‘Focus on Urban Waste Water Discharges in Ireland’ Urban Waste Water Treatment in 2011
.
EPA
,
Wexford
,
Ireland
.
EPA
,
2014
Focus on Urban Waste Water Treatment in 2012
.
EPA
,
Wexford
,
Ireland
.
Fernández
F. J.
Castro
M. C.
Rodrigo
M. A.
Cañizares
P.
,
2011
Reduction of aeration costs by tuning a multi-set point on/off controller: a case study
.
Control Engineering Practice
19
(
10
),
1231
1237
.
Guo
X.
Liu
Z.
Chen
M.
Liu
J.
Yang
M.
2014
Decentralized wastewater treatment technologies and management in Chinese villages
.
Frontiers of Environmental Science & Engineering
8
(
6
),
929
936
.
Hoffman
A.
2014
The Connection: Water and Energy Security. Institute for the analysis of Global Security. http://www.iags.org/n0813043.htm (accessed 13 November 2014)
.
IEA
,
2012
World Energy Outlook 2012 Executive Summary
.
International Energy Agency
,
Paris
,
France
.
Libralato
G.
Volpi Ghirardini
A.
Avezzù
F.
2012
To centralise or to decentralise: an overview of the most recent trends in wastewater treatment management
.
Journal of Environmental Management
94
(
1
),
61
68
.
Low
E. W.
Chase
H. a.
1999
Reducing production of excess biomass during wastewater treatment
.
Water Research
33
(
5
),
1119
1132
.
Marlow
D. R.
Moglia
M.
Cook
S.
Beale
D. J.
2013
Towards sustainable urban water management: a critical reassessment
.
Water Research
47
(
20
),
7150
7161
.
MET
,
2012
Daily weather station data. http://www.met.ie/climate/daily-data.asp (accessed 15 March 2012)
.
Mizuta
K.
Shimada
M.
2010
Benching marking energy consumption in municipal wastewater treatment plants in Japan
.
Water Science & Technology
62
(
10
),
2256
2262
.
O'Reilly
E.
Rodgers
M.
Zhan
X.-M.
2008
Pumped flow biofilm reactors (PFBR) for treating municipal wastewater
.
Water Science and Technology
57
(
12
),
1857
1865
.
O'Reilly
E.
Clifford
E.
Rodgers
M.
O'Donoghue
P.
2011
Strive, Report Series No. 78, National Centre for Water and Wastewater Research and Demonstration
.
EPA
,
Wexford
,
Ireland
.
Parker
D.
Lutz
M.
Dahl
R.
Bernkopf
S.
1989
Enhancing reaction rates in nitrifying trickling filters through biofilm control
.
Water Pollution Control Federation
61
(
5
),
618
631
.
Paul
E.
Camacho
P.
Sperandio
M.
Ginestet
P.
2006
Technical and economical evaluation of a thermal, and two oxidative techniques for the reduction of excess sludge production
.
Process Safety and Environmental Protection
84
(
4
),
247
252
.
Rodgers
M.
Mulqueen
J.
Zhan
X.
O'Reilly
E.
2004
A method and apparatus for biologically processing fluid. International Patent No. PCT/EP2005/007452
.
Wei
Y.
Van Houten
R. T.
Borger
A. R.,
Eikelboom
D. H.
Fan
Y.
2003
Minimization of excess sludge production for biological wastewater treatment
.
Water Research
37
(
18
),
4453
4467
.
WEPA
,
2012
WEPA Outlook on Water Environmental Management in Asia
.
Ministry of the Environment, Japan
,
Tokyo, Japan
.