Wastewater system failures cause operating conditions to deteriorate. Therefore, risk factors should be identified and rehabilitation priority should be established by considering all factors. Determining rehabilitation priority areas is very important in terms of public health, service quality and operating cost. The aim of this study, which was carried out in Malatya, Turkey, was to determine rehabilitation priority in wastewater systems by integrating the ENTROPY, ELECTRE and TOPSIS methods. Some 26 physical, hydraulic, operating and cost factors were considered. The factor weightings were determined by the ENTROPY method to define the factors’ contributions, based on the field data. Rehabilitation priorities were then determined separately using ELECTRE and TOPSIS, taking the factor weights and field data into consideration. Priority regions in rehabilitation were obtained similar according to both methods. The results obtained will provide a reference for wastewater system management and determination of rehabilitation priorities.

  • The priority regions in the rehabilitation of wastewater systems were defined.

  • An integrated methodology of ENTROPY, ELECTRE and TOPSIS was proposed.

  • The physical, hydraulic, operating and cost factors were considered.

  • The data of the factors were obtained according to field measurements.

  • The weights of factors were determined by the ENTROPY method based on field data.

Graphical Abstract

Graphical Abstract
Graphical Abstract

In urban areas, wastewater systems are important infrastructure elements in terms of human and environmental health. In parallel with increasing population numbers, high-quality infrastructure is increasingly required in accordance with environmental standards. Wastewater systems become inadequate due to damage over time and operating conditions deteriorate as a result (Chughtai & Zayed 2008). Faults and structural defects in these systems can adversely affect human health, as well as increasing the potential for wastewater to pollute the environment and natural water resources. Operating, maintenance and repair costs will also increase where these faults continue (Carriço et al. 2012). It is thus important to monitor the system, analyze the factors impairing operating conditions and minimize the effect, determine the most problematic regions, create improvement programs and identify the priority regions, to minimize these problems. Detailed analysis is needed to decide on options such as wastewater line renewal or local repair, reverse slope formation, misuse in existing systems, etc. Models and tools need to be developed for this, to assess system condition and performance within the wastewater rehabilitation program (Inanloo et al. 2016; Tscheikner-Gratl et al. 2017).

Modeling methods depending on evolving computer technology and including artificial intelligence, statistical models, and multiple criteria decision-making methods, have been proposed and applied recently to establish rehabilitation program and damage analysis in wastewater systems (Ana & Bauwens 2010; Barreto et al. 2010; Tagherouit et al. 2011; Kabir et al. 2014; Hlodversdottir et al. 2015; Rokstad & Ugarelli 2015; Inanloo et al. 2016; Tscheikner-Gratl et al. 2017). Considering the neglect of the relationship between variables and the difficulty of the fuzzy synthetic evaluation method in determining the weights of multiple factors, applied ENTROPY in calculating weight coefficients (Yun et al. 2006; Zou et al. 2006). In this calculation, ENTROPY takes into account the information in the data belonging to the factors and keeps the data item relationships in balance. As a result, it was clear that ENTROPY produced meaningful results in indicator evaluation. The Elimination and Choice Expressing Reality (ELECTRE) outranking method for multi-criteria analysis is suitable for choosing between options (Haider et al. 2015; Alamanos et al. 2018). The Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS) is also appropriate for outranking options and solving multi-criteria decision-making problems (Behzadian et al. 2012; Li et al. 2013). Chughtai & Zayed (2008) emphasized that numerous studies have been carried out on determining wastewater system priority regions, but that there is no standard procedure. They stated that physical, environmental and operational factors should be considered together, and noted that the random selection of pipes for system evaluation is very costly and that priority rehabilitation areas should be defined on the basis of failure rates and structural defects.

Carriço et al. (2012) emphasized that structural defects and damage – e.g., collapse, deterioration, flooding, and blockage – are inevitable in infrastructure systems and should be managed in the best way using system data. They also stated that the most appropriate rehabilitation strategy should be developed to manage a system in a long-term and sustainable manner. Taking into account performance and cost, the authors aimed to establish and compare ranking methods for prioritizing maintenance activities in sewer lines.

The analytical hierarchy process (AHP) proposed by Saaty (1980) is a multi-criteria method that is applied widely. In it, the process is applied to choose the most suitable option or to sort them. Ennaouri & Fuamba (2013) applied the AHP method for current condition assessment in combined wastewater systems. All factors affecting deterioration – hydraulic, operational and physical – were considered in developing and appropriate evaluation model for wastewater systems in general. Some 15 factors were determined in total and the AHP method was used to determine their relative superiorities. Rokstad & Ugarelli (2015) emphasized that the most important criterion in deciding on wastewater system rehabilitation is a reliable structural condition assessment. They state that many models have been developed to define the current situation in wastewater systems and most have common characteristics. However, apart from choosing a suitable model, the most suitable variables should also be considered.

Chen et al. (2015), using AHP and ENTROPY methods together, aimed to make a classification giving rational results to evaluate groundwater sustainability, using quantitative and qualitative indicators. They state that determining the factor weights, showing the factors’ contributions to the evaluation result, is the most important step in such analyses and comprehensive evaluations. Ebrahimian et al. (2015) proposed a simple, planned and systematic multi-criteria approach, by applying AHP and fuzzy AHP methods based on decision-makers’ and technical personnel's opinions, to select the most suitable construction method in urban stormwater projects. Factors such as technical limits, construction restrictions, environmental and legal factors, land use and traffic were considered, and 7 projects evaluated. Kessili & Benmamar (2016) used the AHP and PROMETHEE II methods together in determining rehabilitation project priorities in wastewater systems. The weight coefficients of the variables were determined by AHP, and the alternatives were ranked with PROMETHEE II. Siefi et al. (2017) suggested the best candidate thermal power plant sites using multi-criteria evaluation and geographic information system (GIS) in Kahnuj County, southeast Iran. Each criterion was mapped in the GIS environment.

Anbari et al. (2017) emphasized that regions in wastewater systems with high failure rates should be identified and their performance improved. They said that it was important to develop a model for determining risk-prone and priority areas in wastewater system rehabilitation, rather than employing time-consuming and costly processes. Hawari et al. (2017) said that evaluation of the current situation in wastewater systems, the fuzzy analytical network process method, can be important, especially for decision-makers, in choosing fault repair or renewal activities. Singh et al. (2018) investigated surface water quality using quality indices and explored the application of a multi-objective decision-making method (TOPSIS) in arranging decisions for policy makers on the basis of overall ranking of the sampling locations. They felt that the study had justified the effectiveness of TOPSIS in prioritizing decisions for policy makers in complex scenarios. Lizot et al. (2020) presented a six-step, multi-criteria methodology for evaluating water treatment systems, considering relevant economic, social, technical and environmental criteria. The AHP and ELECTRE II methods were combined to weight the criteria and rank the systems. Tabesh et al. (2020) used the TOPSIS method to investigate the effectiveness of the reduction policies for the apparent and real losses of non-revenue water. Dortaj et al. (2020) applied multi-criteria decision-making methods – e.g., AHP, ANP, TOPSIS and ELECTRE – to select suitable construction sites for subsurface dams. They stated that use of an advanced method like ELECTRE reduced some uncertainties in SSD site selection and that this developed methodology could be used as a basis for more detailed field investigations. On the other hand, various literature studies have been carried out on infrastructure management and rehabilitation, such as water distribution pipe renewal based on seismic risk (Youn et al. 2021), risk-based pipe renewal strategies (Salehi et al. 2021; Sufian et al. 2021), pipe replacement scheduling based on optimization algorithm and modeling methods (Salehi et al. 2018; Kerwin & Adey 2020; Wu & Abdul-Nour 2020; Zangenehmadar et al. 2020; Dell'Aira et al. 2021; Ghobadi et al. 2021).

The literature studies show that determining the priority regions in wastewater system rehabilitation is very important in terms of health, operation and cost. Several issues come to the fore in determining wastewater system rehabilitation priority:

  • (i)

    selection of the most appropriate methods, integration and requirements,

  • (ii)

    determination and integration of variables affecting the problem (taking into account the operational, hydraulic and economic variables rather than just physical factors), and

  • (iii)

    realization of the priority ranking.

Therefore, the aim of this study was to determine wastewater system rehabilitation priority using ENTROPY, ELECTRE and TOPSIS together. The most important idea in this study is the determination of weight coefficients using ENTROPY based on the field data.

Rehabilitation priorities were then determined separately using ELECTRE and TOPSIS, by considering the factors’ weights and field data.

ENTROPY

ENTROPY can be applied in the formation of a decision matrix. In this method, standard normalization is first done using Equation (1), for each decision matrix cell (Zou et al. 2006). The ENTROPY value, is calculated using Equation (2).
(1)
(2)
where i is the decision point, j the parameter, pij the normalized value (Equation (3)), n the number of decision points, xij the benefit value, k the ENTROPY coefficient (Equation (4)) and the weights of parameters (Equation (5)). The weight coefficients express the effect level of all variables considered. According to Equation (5), the weights obtained using ENTROPY should be in the range 0–1, and the sum of their weights should be 1.
(3)
(4)
(5)

ELECTRE

ELECTRE is multi-criteria decision-making software that enables the most appropriate ranking to be made by combining a criterion's weight with quantitative and qualitative criteria (Roy 1991; Soner & Önüt 2006).

Creating the decision matrix and normalized decision matrix

The decision matrix (Xij) can be expressed as the initial matrix, containing the alternative data (Equation (6)). A normalized decision matrix (R) is created using Equation (7). The weighted normalized decision matrix (V) given in Equation (8) is obtained by multiplying the elements in the normalized decision matrix and the factor's weight coefficients (Slowinski & Roy 2013).
(6)
(7)
(8)

Determination of the concordance and discordance matrix

The alternatives’ factor weights and rankings in the normalized decision matrix (V) are compared to determine the concordant and discordant sets (Adhikary et al. 2013). The concordant set elements and the sum of the normalized factor weights are calculated. Moreover, the concordant and discordant matrices are determined (Roy 1991; Adhikary et al. 2013; Abdolazimi et al. 2015). Formulation of these steps is shown in Figure 3.

Determination of the superiority matrix

First, threshold values of concordance and discordance parameters in decision-making are calculated. Then the superiority of regions is determined by comparing the threshold values of the concordance and discordance parameters (Figure 3) (Roy 1991; Abdolazimi et al. 2015). The final superiority matrix (H) is obtained by multiplying each element of the concordance superiority matrix with the discordance superiority matrix (Triantaphyllou 2000). The net distance relationships of the alternatives can be improved by calculating the net concordance (Cnet) (Equation (9)) and discordance (Dnet) (Equation (10)) indices for each alternative (Triantaphyllou 2000).
(9)
(10)

TOPSIS

TOPSIS, a multi-criteria decision-making method, was proposed by Yoon (1980), and developed by Hwang & Yoon (1981). When making a decision using TOPSIS, the alternative should be close to the positive ideal solution point and have Euclidean length from the non-ideal solution point (negative ideal solution) (Lai et al. 1994).

Creating the decision matrix and normalized decision matrix

The decision matrix is used to represent the relationship between the parameters affecting the target and alternative regions (Lai et al. 1994). The normalized decision matrix representing the relative performance of the alternatives is obtained by Equation (11), (Chen & Hwang 1993; Wang & Chang 2007).
(11)

Finding positive and negative ideal solution values

The weighted decision matrix is formed by multiplying each column of the normalized decision matrix by the weights of the variables (García-Cascales & Lamata 2012). Positive ideal (A + ={V1 + ,V2 + …, Vn + }) and negative ideal (A − ={ V1 − , V2 − …, Vn − }) solutions are defined separately for each alternative, based on the weighted decision matrix (Figure 3) (Huang et al. 2018).

Calculation of separation criteria

The distance to the positive and negative ideal solutions is calculated using equations given in Figure 3 (Huang et al. 2018; Çelikbilek & Tüysüz 2020).

Calculation of proximity degree

The relative proximity of each alternative to the ideal solution is calculated using Equation (12) (Jadidi et al. 2010; Huang et al. 2018).
(12)

is the relative optimal proximity. A numerical value of indicates absolute closeness to the ideal solution while a zero (0) value indicates absolute closeness to the negative ideal solution (Jadidi et al. 2010; Huang et al. 2018).

The most important step is to provide accurate and systematically measured data. Not only hydraulic variables are effective on pipe malfunctions, but also the network's physical and environmental factors. This enabled evaluation on the basis of hydraulic and financial data, as well as environmental factors (the condition of critical structures, road type, soil, traffic intensity, etc). Wastewater systems have been examined for the factors that are most important in deciding priority regions in wastewater system rehabilitation and some 226 factors were determined (Chughtai & Zayed 2008; Ana & Bauwens 2010; Barreto et al. 2010; Carriço et al. 2012; Ennaouri & Fuamba 2013; Mounce et al. 2014; Ebrahimian et al. 2015; Rokstad & Ugarelli 2015; Del Giudice et al. 2016; Inanloo et al. 2016). The use of so many different parameters in the analysis is very difficult, increasing the complexity and risk of inaccuracy. Instead of using numerous variables to solve problems, factors representing its natural structure and suited to it were preferred (Table 1). Since regular measurement of the data is the most important stage of model development, measurability has been prioritized when determining the factors. Malatya province, in east Turkey, was selected as the area studied (Figure 1). The total length of the wastewater network is 1,229.4 km (MASKI 2018).

The city center was investigated by considering the pipe type, age, lengths and depth, as well as the slope, occupancy rate and population. The pipe cleaning in the network was performed by technical staff. To obtain the data on these factors, detailed analyses of the wastewater projects, and field calibration and CCTV imaging were applied (Figure 2).

Figure 2

CCTV images for fault detection (MASKI 2018; Orhan 2018).

Figure 2

CCTV images for fault detection (MASKI 2018; Orhan 2018).

Close modal

The structural fault ratio was determined by dividing the number of structural faults found between two manholes on the CCTV images by the distance between them. The structural fault types determined from images include oil-grease, pipe material integrity, slump condition, gravel, degradation rate/deformation, tree and plant roots, blockages, building connections, faulty manufacture, etc. Among the problems occurring in wastewater systems, oil and grease are generally associated with the high oil content in restaurant wastewater, and the discharge from major water consumers such as hospitals and military and public institutions can cause insufficient pipe-flow capacity. Pipe material integrity issues and collapse can be expressed as fractures and cracks at junctions, with pipe movement due to loose ground, excess soil cover and pressure, excessive traffic density and freeze-thaw effects. Pipe collapses can also arise from bad workmanship at connections, pipe aging, unsuitable pipe material, and/or washing away of soil around the pipe. Blockages occur in lines where duct cleaning frequency is low and/or too much paper and wet wipes are discarded. Reverse slopes are usually caused by construction faults.

The physical, operational and hydraulic data in Table 2 were obtained directly from the field-based CCTV images and databases (GIS, SCADA, and failure management system). The customer information, number of critical customers and population were obtained from MASKI's customer management system (Table 2) (MASKI 2018; Orhan 2018).

Table 1

Factor description

FactorDescription
Pipe diameter Diameter of wastewater pipe 
Pipe age Age of wastewater pipe (years) 
Pipe material Material of wastewater pipes (1 = concrete, 2 = plastic) 
Pipe depth Pipe construction depth (m) 
Cleaned pipe length Pipe length of cleaning and CCTV images (m) 
Uncleaned pipe length Uncleaned pipe length (m) 
Pipe slope Slope of the constructed pipe 
Reverse slope ratio Proportion of pipes with reverse slope in the service system 
Street slope Street slope 
Minimum distance between manholes Minimum distance between two manholes (m) 
Maximum distance between manholes Maximum distance between two manholes (m) 
Soil thickness above pipe Sum of asphalt and liner material thickness above pipe 
Number of service connections Number of building connections to main pipe 
Number of customers Number of customers 
D < 250 mm Pipes smaller than 250 mm diameter 
Structural fault ratio Ratio of the number of faults detected by CCTV camera (oil-grease, pipe material integrity, slump condition, gravel, degradation rate/deformation, tree/plant roots, congestion, building connection, faulty manufacture) to pipe length (n/km). 
Pipe overload Capacity exceeded 
System type 1 = separate, 2 = combined 
Area Service area 
Population Population in region 
Pipe renewal cost Renewal cost 
Number of failures or repairs Number of failures or repairs 
Soil characteristics Soil type (e.g., highly aggressive, aggressive, moderate) 
Traffic intensity Traffic intensity in street (high, moderate and low) 
Road type Road type 
Number of critical customers Significant water consumers – e.g., hospitals, schools, military or public buildings, etc. 
Area Area served (m2
FactorDescription
Pipe diameter Diameter of wastewater pipe 
Pipe age Age of wastewater pipe (years) 
Pipe material Material of wastewater pipes (1 = concrete, 2 = plastic) 
Pipe depth Pipe construction depth (m) 
Cleaned pipe length Pipe length of cleaning and CCTV images (m) 
Uncleaned pipe length Uncleaned pipe length (m) 
Pipe slope Slope of the constructed pipe 
Reverse slope ratio Proportion of pipes with reverse slope in the service system 
Street slope Street slope 
Minimum distance between manholes Minimum distance between two manholes (m) 
Maximum distance between manholes Maximum distance between two manholes (m) 
Soil thickness above pipe Sum of asphalt and liner material thickness above pipe 
Number of service connections Number of building connections to main pipe 
Number of customers Number of customers 
D < 250 mm Pipes smaller than 250 mm diameter 
Structural fault ratio Ratio of the number of faults detected by CCTV camera (oil-grease, pipe material integrity, slump condition, gravel, degradation rate/deformation, tree/plant roots, congestion, building connection, faulty manufacture) to pipe length (n/km). 
Pipe overload Capacity exceeded 
System type 1 = separate, 2 = combined 
Area Service area 
Population Population in region 
Pipe renewal cost Renewal cost 
Number of failures or repairs Number of failures or repairs 
Soil characteristics Soil type (e.g., highly aggressive, aggressive, moderate) 
Traffic intensity Traffic intensity in street (high, moderate and low) 
Road type Road type 
Number of critical customers Significant water consumers – e.g., hospitals, schools, military or public buildings, etc. 
Area Area served (m2
Table 2

Data used in analysis

RegionPipe diameterPipe agePipe materialPipe depthCleaned pipe lengthPipe length not cleanedPipe slopeReverse slope ratioStreet slopeMinimum manhole distanceMaximum manhole distanceSoil thickness above pipeNumber of service connectionsD < 250 mm
R1 200 21 1.953 1,323.25 127.36 0.742 0.730 0.004 1.51 64.87 2.156 183 39 
R2 400 20 2.103 2,385.01 220.67 1.590 0.047 0.048 1.24 75.5 2.075 184 33 
R3 300 16 2.517 1,838.63 62.83 0.951 0.078 0.043 1.02 72.41 2.003 180 43 
R4 200 25 2.138 1,273.61 196.86 2.618 0.212 0.011 1.46 168.73 1.928 137 43 
R5 200 25 2.097 287.95 59.73 2.677 0.141 0.033 6.4 57.61 2.232 39 13 
R6 300 20 2.500 470.71 0.10 1.600 0.001 0.131 0.85 58.1 2.703 13 14 
R7 200 10 2.000 347.54 0.10 0.430 0.001 0.003 27.08 47.18 2.203 38 
R8 200 10 2.000 34.37 0.10 4.000 0.001 0.002 11.76 22.61 2.203 
R9 200 25 2.428 881.67 195.63 2.080 0.235 0.010 0.19 59.96 2.478 128 34 
R10 200 15 2.367 695.90 130.17 2.940 0.250 0.051 2.97 54.29 2.501 103 25 
R11 200 15 2.730 180.56 31.19 0.650 0.265 0.051 8.5 56.05 2.933 20 
R12 200 2.214 2,039.25 33.01 0.480 0.037 0.203 2.88 65.33 1.923 56 47 
R13 200 10 2.335 586.77 116.79 0.415 0.001 0.013 6.76 62.82 1.920 70 20 
R14 200 25 2.000 56.12 0.10 0.440 0.001 0.002 19.71 36.41 2.203 
R15 200 25 2.020 562.15 55.58 1.420 0.001 0.024 9.84 51.96 2.240 42 16 
R16 200 25 2.000 534.68 0.10 0.498 0.030 0.002 0.88 58.65 2.203 55 15 
R17 200 25 2.000 403.50 0.10 0.907 0.001 0.002 1.75 52.65 2.203 59 15 
R18 300 15 2.383 1,058.60 83.55 2.020 0.229 0.036 0.64 60.18 2.588 45 13 
R19 200 13 1.870 360.83 1.70 3.285 0.001 0.011 0.81 59.9 2.087 12 12 
RegionStructural fault ratioPipe overloadSystem typeAreaPopulationPipe renewal costNumber of failures or repairsSoil characteristicTraffic intensityRoad typeNumber of customersNumber of critical customers
R1 14.79 0.40 272,031.00 3,442 686,069.16 52 229   
R2 7.71 0.40 836,126.93 4,264 1,255,937.76 34 323   
R3 18.73 0.50 493,044.78 3,047 916,503.72 43 282   
R4 14.85 0.50 322,162.50 1,803 708,766.54 28 264   
R5 6.32 0.30 74,967.52 1,401 167,581.76 21 182   
R6 18.46 0.70 98,698.37 540 226,882.22 97   
R7 1.73 0.40 23,413.53 978 167,514.28 16 88   
R8 5.82 0.50 2,905.85 554 16,566.34 43   
R9 12.08 0.70 166,880.15 2,590 519,258.60 50 150   
R10 17.66 0.70 105,319.64 1,970 398,165.74 15 170   
R11 5.19 0.60 25,071.15 406 102,063.50 17 20   
R12 17.22 0.50 607,234.70 3,410 998,829.32 45 230   
R13 4.44 0.60 201,315.16 736 339,115.92 14 110   
R14 8.91 0.50 7,483.02 102 27,049.84 19   
R15 6.94 0.60 58,012.82 278 297,745.86 23 71   
R16 3.44 0.80 36,783.45 494 257,715.76 113   
R17 40.18 0.80 47,367.47 364 194,487.00 19 88   
R18 11.52 0.70 178,618.91 2,889 550,516.30 25 134   
R19 6.14 0.60 36,002.60 195 174,739.46 32   
RegionPipe diameterPipe agePipe materialPipe depthCleaned pipe lengthPipe length not cleanedPipe slopeReverse slope ratioStreet slopeMinimum manhole distanceMaximum manhole distanceSoil thickness above pipeNumber of service connectionsD < 250 mm
R1 200 21 1.953 1,323.25 127.36 0.742 0.730 0.004 1.51 64.87 2.156 183 39 
R2 400 20 2.103 2,385.01 220.67 1.590 0.047 0.048 1.24 75.5 2.075 184 33 
R3 300 16 2.517 1,838.63 62.83 0.951 0.078 0.043 1.02 72.41 2.003 180 43 
R4 200 25 2.138 1,273.61 196.86 2.618 0.212 0.011 1.46 168.73 1.928 137 43 
R5 200 25 2.097 287.95 59.73 2.677 0.141 0.033 6.4 57.61 2.232 39 13 
R6 300 20 2.500 470.71 0.10 1.600 0.001 0.131 0.85 58.1 2.703 13 14 
R7 200 10 2.000 347.54 0.10 0.430 0.001 0.003 27.08 47.18 2.203 38 
R8 200 10 2.000 34.37 0.10 4.000 0.001 0.002 11.76 22.61 2.203 
R9 200 25 2.428 881.67 195.63 2.080 0.235 0.010 0.19 59.96 2.478 128 34 
R10 200 15 2.367 695.90 130.17 2.940 0.250 0.051 2.97 54.29 2.501 103 25 
R11 200 15 2.730 180.56 31.19 0.650 0.265 0.051 8.5 56.05 2.933 20 
R12 200 2.214 2,039.25 33.01 0.480 0.037 0.203 2.88 65.33 1.923 56 47 
R13 200 10 2.335 586.77 116.79 0.415 0.001 0.013 6.76 62.82 1.920 70 20 
R14 200 25 2.000 56.12 0.10 0.440 0.001 0.002 19.71 36.41 2.203 
R15 200 25 2.020 562.15 55.58 1.420 0.001 0.024 9.84 51.96 2.240 42 16 
R16 200 25 2.000 534.68 0.10 0.498 0.030 0.002 0.88 58.65 2.203 55 15 
R17 200 25 2.000 403.50 0.10 0.907 0.001 0.002 1.75 52.65 2.203 59 15 
R18 300 15 2.383 1,058.60 83.55 2.020 0.229 0.036 0.64 60.18 2.588 45 13 
R19 200 13 1.870 360.83 1.70 3.285 0.001 0.011 0.81 59.9 2.087 12 12 
RegionStructural fault ratioPipe overloadSystem typeAreaPopulationPipe renewal costNumber of failures or repairsSoil characteristicTraffic intensityRoad typeNumber of customersNumber of critical customers
R1 14.79 0.40 272,031.00 3,442 686,069.16 52 229   
R2 7.71 0.40 836,126.93 4,264 1,255,937.76 34 323   
R3 18.73 0.50 493,044.78 3,047 916,503.72 43 282   
R4 14.85 0.50 322,162.50 1,803 708,766.54 28 264   
R5 6.32 0.30 74,967.52 1,401 167,581.76 21 182   
R6 18.46 0.70 98,698.37 540 226,882.22 97   
R7 1.73 0.40 23,413.53 978 167,514.28 16 88   
R8 5.82 0.50 2,905.85 554 16,566.34 43   
R9 12.08 0.70 166,880.15 2,590 519,258.60 50 150   
R10 17.66 0.70 105,319.64 1,970 398,165.74 15 170   
R11 5.19 0.60 25,071.15 406 102,063.50 17 20   
R12 17.22 0.50 607,234.70 3,410 998,829.32 45 230   
R13 4.44 0.60 201,315.16 736 339,115.92 14 110   
R14 8.91 0.50 7,483.02 102 27,049.84 19   
R15 6.94 0.60 58,012.82 278 297,745.86 23 71   
R16 3.44 0.80 36,783.45 494 257,715.76 113   
R17 40.18 0.80 47,367.47 364 194,487.00 19 88   
R18 11.52 0.70 178,618.91 2,889 550,516.30 25 134   
R19 6.14 0.60 36,002.60 195 174,739.46 32   

Data including verbal information such as traffic density, soil characteristics, pipe material type, and system type were converted into numerical data while being processed into the decision matrix For example, the traffic volume was classified as low, medium or high, classified as 1, 2 and 3, respectively, while soil characteristics were classified as low-, medium- and high-motion and also numbered 1, 2 and 3, respectively. Two different pipe materials, generally concrete and corrugated metal – 1 and 2, respectively – were used. as well as two network types, separate and combined lines, also 1 and 2.

Analysis and discussion

In this study, criteria such as suitability, applicability, comparability and data measurability were considered in determining factors that might affect the problem. The factors’ weight coefficients were determined on the basis of the field data. Often the weight coefficients of variables are determined by scoring or expert opinion but, in this study, they were calculated using quantitative methods and real field data. Some 50,000 fault reports were analyzed for failure and structural defect data. Increasing the number of regions could raise problems in accessing accurate and reliable data, with negative impact on the results.

In this study, a MATLAB-based model was developed to evaluate the sewer pipes and prioritize rehabilitation. The factor weights were determined using ENTROPY. On the basis of these weight coefficients and field data, wastewater pipes can be prioritized according to risk using ELECTRE and TOPSIS. A flow chart for determining rehabilitation priority regions is given Figure 3.

Figure 3

Flow chart for determining rehabilitation priority regions.

Figure 3

Flow chart for determining rehabilitation priority regions.

Close modal

Determination of weight coefficients

The factor weight coefficients are used to determine regional performance and the rehabilitation priority zones, and it is important to calculate them correctly. ENTROPY was used and the results are shown in Table 3.

Table 3

Weight coefficients determined using ENTROPY

FactorWeightFactorWeight
Pipe diameter 0.0036 Number of customers 0.0310 
Pipe age 0.0083 D < 250 mm 0.0317 
Pipe material 0.0026 Soil thickness above pipe 0.0010 
Pipe depth 0.0008 Pipe overload 0.0043 
Cleaned pipe length 0.0457 System type 0.0083 
Pipe length not cleaned 0.0877 Area 0.0824 
Pipe slope 0.0980 Population 0.0509 
Reverse slope ratio 0.1238 Pipe renewal cost 0.0452 
Street slope 0.0994 Number of failures or repairs 0.0280 
Structural fault ratio 0.0750 Soil characteristic 0.0078 
Minimum distance between manholes 0.0596 Traffic intensity 0.0060 
Maximum distance between manholes 0.0110 Road type 0.0083 
Number of service connections 0.0492 Number of critical customers 0.0310 
FactorWeightFactorWeight
Pipe diameter 0.0036 Number of customers 0.0310 
Pipe age 0.0083 D < 250 mm 0.0317 
Pipe material 0.0026 Soil thickness above pipe 0.0010 
Pipe depth 0.0008 Pipe overload 0.0043 
Cleaned pipe length 0.0457 System type 0.0083 
Pipe length not cleaned 0.0877 Area 0.0824 
Pipe slope 0.0980 Population 0.0509 
Reverse slope ratio 0.1238 Pipe renewal cost 0.0452 
Street slope 0.0994 Number of failures or repairs 0.0280 
Structural fault ratio 0.0750 Soil characteristic 0.0078 
Minimum distance between manholes 0.0596 Traffic intensity 0.0060 
Maximum distance between manholes 0.0110 Road type 0.0083 
Number of service connections 0.0492 Number of critical customers 0.0310 

The highest weight coefficient calculated was for the inverse slope ratio (0.1238) based on results obtained using ENTROPY (Table 4). Reverse slopes cause water to pond in the pipe and overflow from building connections or manholes, especially when water accumulation is excessive. This poses significant structural, environmental, technical and economic problems, and the risk of increase in failures and maintenance-repair costs rises. On the other hand, weight coefficients for pipe and street slope were calculated as 0.0980 and 0.0994, respectively.

Table 4

Priority ranking of regions

RankingRegions
ELECTRETOPSIS
R6 R3 
R7 R5 
R3 R6 
R5 R9 
R9 R7 
RankingRegions
ELECTRETOPSIS
R6 R3 
R7 R5 
R3 R6 
R5 R9 
R9 R7 

These results show that it is important to choose the most suitable slope during design and lay the pipes with the most appropriate slope during construction. Incorrect pipe slope calculation or incorrect construction due to poor workmanship are major factors that can cause line failure under normal operating conditions.

The results in Table 4 indicate that it would be better to evaluate the structural failure rate (0.075) and uncleaned line length (0.0877) together. These two factors’ weight coefficients have the highest values after the slope factor. Normal operating conditions are disrupted in systems where cleaning is not done, and structural defects are not detected and repaired. Other important factors causing wastewater line blockages include construction and workmanship defects, and faulty building connections.

The weight coefficient for service connections is significant at 0.0492. As the number of service connections increases, the frequency of failures and thus the cost of maintenance and repair also increases. The minimum distance between manholes also has a high weight coefficient. As the distance increases, clogging will become more difficult to remove and maintenance costs increase. These evaluations show that the calculated weight coefficients are meaningful and consistent with the nature of the problems.

Priority ranking of regions

After calculating the factor weight coefficients, priority rehabilitation areas were determined using ELECTRE and TOPSIS, and their results compared. Decision matrices, normalized decision matrices and weighted normalized decision matrices were calculated using the decision support software developed. The rehabilitation priority rankings according to ELECTRE and TOPSIS are shown in Figure 4(a) and 4(b). Proximity degrees were calculated according to the ideal solutions and rehabilitation priorities determined (Figure 4).

Figure 4

(a) rehabilitation priority ranking determined using ELECTRE, and (b) using TOPSIS; (c) pipe-diameter distribution in the regions.

Figure 4

(a) rehabilitation priority ranking determined using ELECTRE, and (b) using TOPSIS; (c) pipe-diameter distribution in the regions.

Close modal

The priority rankings show that the first 5 region groups determined using ELECTRE and TOPSIS are similar – ELECTRE showing R-6, R-7, R-3, R-5 and R-9, while TOPSIS shows R-3, R-5, R-6, R-9 and R-7. In general, the density of faults is higher in these regions than elsewhere, as are the numbers of connections, which are thought to be significant in pipe failure rates. The regions also have high operating cost levels, particularly because the proportion of pipes with diameters less than 250 mm – i.e., with a high risk of clogging – is generally high.

The rankings show many similar results in this study, as well as differences in rankings (Figure 4). The TOPSIS prioritization determined that some middle-ranking regions – e.g., R-8 and R-11 – are in the lowest ranks according to ELECTRE. Equally, in the ELECTRE prioritization, some middle-ranking regions – e.g., R-1, R-12, R-13 – are in the lowest ranks according to TOPSIS. These differences arise from the methods’ working principles.

In ELECTRE, alternative pairs are selected, and binary comparisons and sequencing accord with the compliance and conflict matrices created from the comparisons. In TOPSIS, in the weighted normalized decision matrix, the column gives the maximum positive ideal and the minimum negative ideal for each variable, ranked according to the situation where the alternatives are closest to the positive ideal and furthest from the negative one.

In a decision-making problem with more than one variable, the variables can be contradictory – i.e., when changing from one alternative to another, the values of some variables increase, while decreases in others increases the problem's complexity. Some variables may, therefore, be better for the alternative region studied and some bad. Since the methods’ working principles differ and each problem has different variable and alternative features, sequencing must be determined using more than one method to obtain the optimal solution.

In this study, priority areas in wastewater system rehabilitation were determined by multiple criteria decision-making methods. Criteria such as suitability, applicability, comparability and data measurability were considered in determining the relevant variables. Some 26 factors were considered and their weights calculated using ENTROPY. The highest calculated coefficient was 0.1238 for the inverse slope ratio. Reverse slopes cause water to pond in the pipe and overflow from building connections or manholes, especially when excessive water accumulates, posing significant structural, environmental, technical and economic problems. On the other hand, the coefficients for pipe and street slope were 0.0980 and 0.0994, respectively. The results show that it would be best to evaluate the structural failure rate (0.075) and length of uncleaned line (0.0877) together; these factors’ weight coefficients are the highest after the slope factor.

The coefficients obtained using ENTROPY represented the nature of the problem and were used, in the next stage, to determine rehabilitation priority regions. This was done using ELECTRE and TOPSIS, based on the weights and field data, and the top 5 regions determined by the two are similar. Fault numbers are generally higher in these regions than elsewhere and the numbers of connections, which are thought to be affect failure rates significantly, are also high.

The lessons learned in determining weights and defining priority regions are:

  • (i)

    variable selection – ensuring that data are available, accurate and updated regularly;

  • (ii)

    data verification or testing in the GIS database on the basis of CCTV images; and

  • (iii)

    determining weight coefficients using field data.

The authors thank Inonu University, Scientific Research Project Funding for its financial support (IUBAP 2021/2457).

The authors have no conflicts of interest to declare.

All relevant data are included in the paper or its Supplementary Information.

Abdolazimi
A.
,
Momeni
M.
&
Montazeri
M.
2015
Comparing ELECTRE and linear assignment methods in zoning Shahroud Bastam watershed for artificial recharge of groundwater with GIS technique
.
Modern Applied Science
9
(
1
),
68
82
.
Adhikary
P.
,
Kundu
S.
,
Roy
P. K.
&
Mazumdar
A.
2013
Optimum selection of hydraulic turbine manufacturer for AHP. MCDA or MCDM tools
.
World Applied Sciences Journal
28
,
914
919
.
Anbari
M. J.
,
Tabesh
M.
&
Roozbahani
A.
2017
Risk assessment model to prioritize sewer pipes inspection in wastewater collection networks
.
Journal of Environmental Management
190
,
91
101
.
Barreto
W.
,
Vojinovic
Z.
,
Price
R.
&
Solomatine
D.
2010
Multiobjective evolutionary approach to rehabilitation of urban drainage systems
.
Journal of Water Resources Planning and Management
136
,
547
554
.
Behzadian
M.
,
Otaghsara
S. K.
,
Yazdani
M.
&
Ignatius
J.
2012
A state-of the-art survey of TOPSIS applications
.
Expert Systems with Applications
39
(
17
),
13051
13069
.
Carriço
N.
,
Covas
D. I. C.
,
Céu Almeida
M.
,
Leitão
J. P.
&
Alegre
H.
2012
Prioritization of rehabilitation interventions for urban water assets using multiple criteria decision-aid methods
.
Water Science and Technology
66
,
1007
1014
.
Çelikbilek
Y.
&
Tüysüz
F.
2020
An in-depth review of theory of the TOPSIS method: an experimental analysis
.
Journal of Management Analytics
7
(
2
),
281
300
.
Chen
S. J.
&
Hwang
C. L.
1993
Fuzzy multiple attribute decision-making, methods and applications
. In:
Lecture Notes in Economics and Mathematical Systems
. p.
375
.
Chughtai
F.
&
Zayed
T.
2008
Infrastructure condition prediction models for sustainable sewer pipelines
.
Journal of Performance of Constructed Facilities
22
(
5
),
333
341
.
Dell'Aira
F.
,
Cancelliere
A.
,
Creaco
E.
&
Pezzinga
G.
2021
Novel comprehensive approach for phasing design and rehabilitation of water distribution networks
.
Journal of Water Resources Planning and Management
147
(
3
),
04021001
.
Dortaj
A.
,
Maghsoudy
S.
,
Ardejani
F. D.
&
Eskandari
Z.
2020
A hybrid multi-criteria decision making method for site selection of subsurface dams in semi-arid region of Iran
.
Groundwater for Sustainable Development
10
,
100284
.
Ebrahimian
A.
,
Ardeshir
A.
,
Zahedi
R. I.
&
Ghodsypour
S. H.
2015
Urban stormwater construction method selection using a hybrid multi-criteria approach
.
Automation in Construction
58
,
118
128
.
Ennaouri
I.
&
Fuamba
M.
2013
New integrated condition-assessment model for combined storm-sewer systems
.
Journal of Water Resources Planning and Management
139
(
1
),
53
64
.
García-Cascales
M. S.
&
Lamata
M. T.
2012
On rank reversal and TOPSIS method
.
Mathematical and Computer Modelling
56
(
5–6
),
123
132
.
Hawari
A.
,
Alkadour
F.
,
Elmasry
M.
&
Zayed
T.
2017
Simulation-based condition assessment model for sewer pipelines
.
Journal of Performance of Constructed Facilities
31
(
1
),
04016066
1
.
Hlodversdottir
A. O.
,
Bjornsson
B.
,
Andradottir
H. O.
,
Eliasson
J.
&
Crochet
P.
2015
Assessment of flood hazard in a combined sewer system in Reykjavik city centre
.
Water Science and Technology
71
,
1471
1477
.
Huang
W.
,
Shuai
B.
,
Sun
Y.
,
Wang
Y.
&
Antwi
E.
2018
Using ENTROPY-TOPSIS method to evaluate urban rail transit system operation performance: the China case
.
Transportation Research Part A: Policy and Practice
111
,
292
303
.
Hwang
C. L.
&
Yoon
K.
1981
Multiple Attribute Decision Making Methods and Applications
.
Springer
,
Berlin, Heidelberg
, p.
259
.
Jadidi
O.
,
Firouzi
F.
&
Bagliery
E.
2010
TOPSIS method for supplier selection problem
.
World Academy of Science, Engineering and Technology
47
,
956
958
.
Kabir
G.
,
Sadiq
R.
&
Tefamariam
S.
2014
A review of multi-criteria decision-making methods for infrastructure management
.
Structure and Infrastructure Engineering Maintenance, Management, Life-Cycle Design and Performance
10
(
9
),
1176
1210
.
Kerwin
S.
&
Adey
B. T.
2020
Optimal intervention planning: a bottom-up approach to renewing aging water infrastructure
.
Journal of Water Resources Planning and Management
146
(
7
),
04020044
.
Kessili
A.
&
Benmamar
S.
2016
Prioritizing sewer rehabilitation projects using AHP-PROMETHEE II ranking method
.
Water Science & Technology
73
(
2
),
283
291
.
Lai
Y. J.
,
Liu
T. Y.
&
Hwang
C. L.
1994
TOPSIS for MCDM
.
European Journal of Operational Research
76
,
486
500
.
Li
P.
,
Qian
H.
,
Wu
J.
&
Chen
J.
2013
Sensitivity analysis of TOPSIS method in water quality assessment: I. Sensitivity to the parameter weights
.
Environmental Monitoring and Assessment
185
,
2453
2461
.
Lizot
M.
,
Goffi
A. S.
&
Thesari
S. S.
2020
Multi-criteria methodology for selection of wastewater treatment systems with economic, social, technical and environmental aspects
.
Environment, Development and Sustainability
1
(
1
),
1
18
.
MASKI
2018
Malatya Water and Sewerage Administration Annual Report (Unpublished)
.
Mounce
S. R.
,
Shepherd
W.
,
Sailor
G.
,
Shucksmith
J.
&
Saul
A. J.
2014
Predicting combined sewer overflows chamber depth using artificial neural networks with rainfall radar data
.
Water Science and Technology
69
,
1326
1333
.
Orhan
C.
2018
Identification of Priority Areas for Rehabilitation in Wastewater Systems
.
Master Thesis
,
İnönü University, Institute of Science and Technology
, p.
120
.
Rokstad
M. M.
&
Ugarelli
R. M.
2015
Evaluating the role of deterioration models for condition assessment of sewers
.
Journal of Hydroinformatics
17
(
5
),
789
804
.
Saaty
T. L.
1980
The Analytic Hierarchy Process
.
McGraw-Hill
,
New York
.
Salehi
S.
,
Tabesh
M.
&
Jalili Ghazizadeh
M.
2018
HRDM method for rehabilitation of pipes in water distribution networks with inaccurate operational-failure data
.
Journal of Water Resources Planning and Management
144
(
9
),
04018053
.
Salehi
S.
,
Jalili Ghazizadeh
M.
,
Tabesh
M.
,
Valadi
S.
&
Salamati Nia
S. P.
2021
A risk component-based model to determine pipes renewal strategies in water distribution networks
.
Structure and Infrastructure Engineering
17
(
10
),
1338
1359
.
Siefi
S.
,
Karimi
H.
,
Soffianian
A. R.
&
Pourmanafi
S.
2017
GIS-based multi criteria evaluation for thermal power plant site selection in Kahnuj County, SE Iran
.
Civil Engineering Infrastructures Journal
50
(
1
),
179
189
.
Slowinski
R.
&
Roy
B.
2013
An overview of ELECTRE methods and their recent extensions
.
Journal of Multi-Criteria Decision Analysis
20
,
61
85
.
Soner
S.
&
Önüt
S.
2006
Multi-criteria supplier selection: an ELECTRE-AHP application
.
Journal of Engineering and Natural Sciences
6
(
4
),
110
120
.
Sufian
S.
,
Romali
N.
,
Rahman
R.
&
Seman
M.
2021
Current practice in rehabilitating old pipes for water distribution network in Malaysia
. In:
International Conference of Sustainable Earth Resources Engineering
.
IOP Publishing
, p.
012011
.
Tabesh
M.
,
Roozbahani
A.
,
Roghani
B.
,
Salehi
S.
,
Faghihi
N. R.
&
Heydarzadeh
R.
2020
Prioritization of non-revenue water reduction scenarios using a risk-based group decision-making approach
.
Stochastic Environmental Research and Risk Assessment
34
,
1713
1724
.
Tagherouit
W.
,
Ben Bennis
S.
&
Bengassem
J.
2011
A fuzzy expert system for prioritizing rehabilitation of sewer networks
.
Computer-Aided Civil and Infrastructure Engineering
26
,
146
152
.
Triantaphyllou
E.
2000
Multi-criteria decision making methods
. In:
Multi-criteria Decision Making Methods: A Comparative Study. Applied Optimization
.
Springer
,
Boston, MA
, p.
44
.
Wu
Z.
&
Abdul-Nour
G.
2020
Comparison of multi-criteria group decision-making methods for urban sewer network plan selection
.
Civil Engineering
1
(
1
),
26
48
.
Yoon
K.
1980
System Selection by Multiple Attribute Decision Making
,
PhD Dissertation
,
Kansas State University
,
Manhattan, Kansas
, p.
328
.
Youn
H.
,
Oh
H. J.
&
Kim
D.
2021
Prioritizing water distribution pipe renewal based on seismic risk and construction cost
.
Membrane Water Treatment
12
(
5
),
195
.
This is an Open Access article distributed under the terms of the Creative Commons Attribution Licence (CC BY-NC-ND 4.0), which permits copying and redistribution for non-commercial purposes with no derivatives, provided the original work is properly cited (http://creativecommons.org/licenses/by-nc-nd/4.0/).