Rain water harvesting (RWH) has gained popularity as a way of supplementing water supplies for various purposes, including drinking, sanitation and irrigation. This paper presents a methodology of life cycle cost assessment (LCCA) of a unit RWH system (hereafter RWH system) for toilet flushing in an industrial site. The life cycle cost and net present value benefits (NPVB) were estimated for the RWH system and compared with those of a conventional system. For the current system design, the analysis of the life cycle cost of the RWH system indicates negative NPVB for all plausible service lives up to 55 years, mainly because of the initial infrastructure investment costs, operation and maintenance (O&M) costs, and pumping costs for the system. However, sensitivity analysis concluded that an alternative design with no pump, low O&M costs (5%) and 1% tank refill volume may be economically viable given 7 years of service life. The sensitivity analysis also revealed that higher hypothetical water prices ($5/m3) may lead to positive NPVB after only 5 years of service. Full cost pricing for rainwater harvesting is important for the promotion of sustainable practices and life cycle based system design is critical to make RWH systems economically attractive.
Skip Nav Destination
Article navigation
Research Article|
May 01 2012
Life cycle cost assessment of a rain water harvesting system for toilet flushing Available to Purchase
S. R. Ghimire;
1Formerly, Faculty of Engineering, Driftmier Engineering Center, The University of Georgia, Athens, GA 30602, USA
E-mail: [email protected]
Search for other works by this author on:
D. W. Watkins, Jr.;
D. W. Watkins, Jr.
2Department of Civil and Environmental Engineering, Michigan Technological University, Houghton, MI 49931, USA
Search for other works by this author on:
K. Li
K. Li
3Faculty of Engineering, Driftmier Engineering Center, The University of Georgia, Athens, GA 30602, USA
Search for other works by this author on:
Water Supply (2012) 12 (3): 309–320.
Article history
Received:
April 26 2011
Accepted:
December 12 2011
Citation
S. R. Ghimire, D. W. Watkins, K. Li; Life cycle cost assessment of a rain water harvesting system for toilet flushing. Water Supply 1 May 2012; 12 (3): 309–320. doi: https://doi.org/10.2166/ws.2011.135
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00