This study proposes an optimal scheduling model for rehabilitation based on the deterioration prediction of existing pipes by using the deterioration survey method for a water distribution system. The deterioration prediction model divides the deterioration degree of each pipe into 5 degrees by using the Probabilistic Neural Networks (PNN). Furthermore, the maximum residual service time is estimated by the calculated deterioration degree for each pipe and pipe diameter. The optimal rehabilitation model by integer programming (IP), based on the shortest path, can calculate the time and cost of maintenance, rehabilitation, and replacement. Consequently, the model proposed by the study can be utilized as a quantitative method for the management of a water distribution system.
Skip Nav Destination
Article navigation
Research Article|
September 01 2005
Estimate of pipe deterioration and optimal scheduling of rehabilitation
E.S. Kim;
*Dept. of Civil Engr., Sunmoon University, Asan-si, Chungnam, South Korea, 336-708 (E-mail: [email protected])
E-mail: [email protected]
Search for other works by this author on:
C.W. Baek;
C.W. Baek
**Dept. of Civil and Envir. Engr., Korea University, Seoul, South Korea, 136-701 (E-mail: [email protected]; [email protected])
Search for other works by this author on:
J.H. Kim
J.H. Kim
**Dept. of Civil and Envir. Engr., Korea University, Seoul, South Korea, 136-701 (E-mail: [email protected]; [email protected])
Search for other works by this author on:
Water Supply (2005) 5 (2): 39–46.
Citation
E.S. Kim, C.W. Baek, J.H. Kim; Estimate of pipe deterioration and optimal scheduling of rehabilitation. Water Supply 1 September 2005; 5 (2): 39–46. doi: https://doi.org/10.2166/ws.2005.0020
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00