One of the major socioeconomic and global sustainability issues is water scarcity, which imperils human survival and regional development. The current study aims to develop a model for allocating water resources more efficiently and equitably. In this regard, a multi-objective programming approach was developed with the first objective of equality of water resource allocation to be maximized, and the second objective of risk to be minimized. The risk considered in this study was the economic efficiency loss risk. For the annual water allocation model, the fluctuation in available water within the river basin is the main source of uncertainty and can result in the corresponding risk of economic efficiency loss. Thus, it is essential to manage the economic efficiency loss risk resulting from uncertainty. To solve the model, the compromise programming (CP) method was used. A sustainability index was also employed to determine the objective function weights. The developed model was applied to the Givi River basin in Iran. From the results, it was found that using the sustainability index is a suitable strategy in the CP method for determining the objective function weights. The results showed that the proposed model can be helpful in water management to allocate water resources.

Population and economic growth has increased agricultural and domestic water demand. Different groups of water users need to know how much water will be allocated to their activities. Consumers also need to know how much water, allocated to them, may not be supplied. They can then buy water from a more expensive source or decrease their development activities. Two important criteria in optimal allocation of water resources are efficiency and equality. Together with these two criteria, consideration should be given to sustainable water allocation (Hu et al. 2016a). Numerous researchers have been interested in developing an efficient index to show the equality in distribution of water resources. One of the first pioneers was Gini (1921).

In recent decades, water resource researchers have been attempting to use the Gini coefficient in demonstrating the equality of water distribution. Also, the efficiency as an essential indicator should always be considered alongside the equality index. If only equality is taken into account, regardless of efficiency, it will not lead to economic development. Along with these factors, the issue of sustainability must always be considered. In fact, sustainability is a guarantee of continued progress. The word sustainability has assumed a variety of meanings. Once the water resource system is simulated using hydrological inputs, the time series values of these system performance criteria can be derived. These time series values can be summarized using the statistical measures of reliability, resilience and vulnerability. The relative sustainability of the system with respect to each of these criteria is higher the greater the reliability and resilience, and the smaller the vulnerability (Loucks 1997; Ioslovich & Gutman 2001; Garcia & Pargament 2015; Ha & Gao 2017). Given that water allocation issues are always uncertain, it is inevitable to consider uncertainties that lead to risk conditions. The most important uncertainty of water resources allocation is the volume of available resources. The variation in the volume of water supply is always a source of uncertainty. The next uncertainty is the level of water demand in different sectors (i.e., agricultural, domestic, and industrial sectors). The occurrence of uncertainty in different sectors occurs for different reasons. For example, the demand of the agricultural sector is variable due to changes in the area and pattern of cultivation (Qian et al. 2014). Three risk criteria for evaluating the possible performance of water resources systems are reliability, resiliency, and vulnerability. Reliability indicates how likely a system is to fail, resiliency implies how quickly it recovers from failure, and vulnerability demonstrates how severe the consequences of failure may be. It is unlikely that a single mathematical definition of these concepts will be appropriate or useful in all situations. These criteria can be used to assist in the assessment and selection of alternative design and operating policies for different water resource projects (Hashimoto et al. 1982). Sandoval-Solis et al. (2010) presented a water resources sustainability index that makes it possible to assess and compare different water management policies with respect to their sustainability. The sustainability index describes policies that maintain or improve the desired water management characteristics of the basin in the future.

Liu et al. (2018) formulated water supply uncertainties, and then evaluated risks related to droughts and sudden water pollution. They showed that the water supply problem could be alleviated to some extent by increasing the distance between the pollution location and the reservoir release gate. Qian et al. (2014) presented evaluation criteria of risk between water supply and water demand which includes threat, susceptibility, and vulnerability. They developed a model for risk evaluation based on the maximum entropy principle and discriminant analysis. Zeying et al. (2015) described uncertainty of water resources systems and quantitative characterization methods of risk analysis, including three criteria (reliability, resiliency, and vulnerability). They finally provided a decision support of risk analysis for researchers, policy-makers and stakeholders of water resources systems. The Conditional Value-at-Risk (CVaR) criterion is used to consider the system under the risk condition. This criterion covers the important part of the existing uncertainties. CVaR is derived from the loss distribution function (Rockafellar & Uryasev 2002). Yamout (2005) compared the different probability and non-probability based analytical techniques used in risk management, focusing on the Conditional Value-at-Risk method. She investigated the impact of incorporating the CVaR on analyzing a water allocation problem versus using the frequently used expected value, two-stage modeling, scenario analysis, and linear optimization tools. She developed five models to examine the water resource allocation when available supplies are uncertain. The inclusion of the CVaR objective function provides for the optimization and control of high-risk events. Minimizing CVaR does not, however, permit control of lower-risk event behavior with respect to the confidence level, when compared to value-at-risk. Hu et al. (2016b) developed a multi-objective model involving water allocation equality and economic efficiency risk control to help water managers mitigate water allocation problems. They introduced the Gini coefficient to optimize water allocation equality in water use sectors and CVaR to control the economic efficiency loss risk corresponding to variations in water availability. Due to uncertainties in water supply and water demand, water allocation under the risk condition is unavoidable. In this study, we attempted to focus on the equal and efficient allocation of water under the risk (the economic efficiency loss risk) condition. Generally, high risk is positively correlated with high returns as well as high losses. Therefore, a high fluctuation in available water resources exacerbates the risk of water management system failure. As a result, the economic efficiency loss risk control is an important element for a viable and valid solution. Thus, it is essential to manage the economic efficiency loss risk resulting from uncertainty. In order to model the water allocation issue, multi-objective optimization with two objective functions of CVaR and Gini was used. Also, the compromise programming (CP) approach was used to solve the multi-objective optimization problem. An important step in the CP method is determining the weight of the objective functions, however this step is barely considered in the existing literature. In this research, for determining the weight of the objective functions, the sustainability index was proposed.

Study area and data source

The Givi River is one of the branches of the Ghezel Ozan River, which originates in the Aq Dag mountains. This river is located in the southern part of Ardebil province in Iran. The river enters the Ghezel Ozan River basin after joining the Sangvar River in the lower reaches, finally it enters the Caspian Sea. The Givi River basin has an area of 600 km2 (see Figure 1).

Figure 1

The Givi River basin in Ardabil province.

Figure 1

The Givi River basin in Ardabil province.

Close modal

The whole study area was divided into the two sub-basins of the Sangvar and Givi Rivers. Considering the length of the observation data period at the Firozabad base hydrometric station, a 50-year period (i.e., 1960–2010) was selected for the study. The study area consists of one urban area and 104 rural areas. The expected value of the annual water supply in that area is approximately 103 million m3. The minimum requirement for domestic water in rural and urban areas is 2.2 million m3, and the minimum requirements for the industrial and agricultural sectors are 40 and 34 million m3, respectively. Agricultural demand in the Sangvar sub-basin is higher than in the Givi sub-basin. In contrast, the industrial water demand in the Givi basin is higher than in the Sangvar. All the necessary data for this study were taken from the Regional Water Company of Ardabil province.

Methodology

Decision making is an integral part of human lives. It ranges in scope from the individual to the largest groups (Chankong & Haimes 1983). In recent decades, researchers have focused on multi-criteria decision making (MCDM) for complex decisions. These decision models are divided into two major categories: multi-objective models (MODMs) and multi-attribute models (MADMs). Water allocation is a multi-criteria decision-making problem that has always been highly regarded in literature (Cohon & Marks 1973; Hipel 1992; Raju et al. 2000; Babel et al. 2005; Xevi & Khan 2005; Atiquzzaman et al. 2006; Han et al. 2011; Ren et al. 2019). The conceptual framework of a water allocation model is shown in Figure 2.

Figure 2

Conceptual framework of water allocation model.

Figure 2

Conceptual framework of water allocation model.

Close modal

Compromise programming (CP) technique

There are several methods to solve multi-objective models. In this study, a compromise programming method was used. The compromise programming method was first used by Zeleny (1973). Subsequently, many researchers developed compromise programming for water allocation (Bella et al. 1996; Raju et al. 2000; Shiau & Wu 2006; Zarghaami 2006; Fattahi & Fayyaz 2010; Read et al. 2014; Roozbahani et al. 2015; Salman et al. 2019). The CP method identifies the solutions which are closest to the ideal solution, as determined by some measure of distance. Due to its simplicity, transparency and easy adaptation to both continuous and discrete settings, the CP method is recommended as the multi-objective analysis method of choice for application in water resources systems management (Simonovic 2009). This method is based on scaling of the outcome for each criterion and subsequently calculating a weighted sum of metric distance for each criterion for making a single objective function. The solutions obtained from the CP method have been found to be the closest to the ideal (Hu et al. 2016c). For a model with n objective functions, the compromise programming distance metric is presented as below:
(1)
where the value (the weight of objective j) reflects the decision makers' preference for the importance of the objective; is the calculated value of the objective function j; and are the most optimal value and the most inferior value; P (=1, 2, · · · ∞.) is a metric parameter which reveals the significance of the maximum deviation from the ideal point (Simonovic 2009).

Applying the Gini coefficient to measure inequality

Equal access to water or the benefits of water use will result in sustainable development and elimination of poverty in developing countries (DWAF 2005; Cullis & Van Koppen 2007). An indicator for equal distribution was first introduced by Gini (1921). The Gini coefficient is one of the most commonly used indicators for measuring distribution. It is traditionally applied to the measurement of income inequality, however, it is also applied to measure land inequality. Subsequently, many researchers have used this indicator for water resources allocation equality (Cullis & Van Koppen 2007; Wang et al. 2012; Hu et al. 2016c; Dai et al. 2018; Lee et al. 2019). The Gini coefficient is calculated from un-ordered size data as the ‘relative mean difference’, i.e., the mean difference between every possible pair of individuals , divided by the mean size and is defined as follows:
(2)

The Gini coefficient can be displayed graphically using a Lorenz curve. It was developed by Max Lorenz in 1905 for representing inequality of wealth distribution (Figure 3).

Figure 3

Lorenz curve and Gini coefficient (Cullis & Van Koppen 2007).

Figure 3

Lorenz curve and Gini coefficient (Cullis & Van Koppen 2007).

Close modal
In order to use the Gini coefficient for water allocation, it is necessary to form a matrix, which actually represents the water allocation matrix, in which the entry of that matrix x (i, j) represents the volume of water allocated to the sector i in sub-basin j. Given the existence of two sub-basins and three consumers in this study, the above matrix would be a matrix of 3 by 2. The sub-basins are Givi and Sangvar, respectively and the sectors are domestic, industrial, and agricultural, respectively. Formation of the Gini coefficient for the domestic sector (D) is based on the population of the sub-basins (POP), for the agricultural sector (A) it is based on the area under cultivation (s) and for the industrial sector (I) it is based on the average economic return per unit volume of allocated water (B). Based on the above description, the relationship is as follows (Hu et al. 2016c):
(3)
where are the weights and .

Conditional Value-at-Risk as a measure of risk (CVaR)

For calculation of risk the Conditional Value-at-Risk method was used. Value-at-Risk, which is denoted as , is defined as the maximum potential loss with a confidence level α and Conditional Value-at-Risk, which is denoted as , measures the expected value of losses exceeding . CVaR is both coherent and expectation-bounded. It is a simple representation of risk and accounts for risk beyond , making it more conservative than (Yamout 2005; Rahimi & Ghezavati 2018; Dixit & Tiwari 2020).

The of the loss associated with a decision x is defined in the following way: ξ(x) (the VaR value)
(4)
(5)
where L(y, ω) is the loss function with ω being the stochastic factor, prob denotes probability, and represents the cumulative probability distribution function of the loss function. (expected value of losses exceeding is defined as follows:
(6)
where E is the expected mean. From Equation (6), CVaR can be obtained as follows:
(7)
(8)
where X is the water allocation matrix previously discussed, B is the economic return matrix, EWD is ecological water demand, n is the number of probability-value pairs in the discrete approximation, is loss function, is probability of , and ⊙ is the Hadamard product of two matrices (Rockafellar & Uryasev 2002). Figure B in the Supplementary Material demonstrates VaR and CVaR deviations.

Water resources system sustainability

According to the WCED (1987), sustainable water resource systems are those designed and managed to contribute fully to the objectives of society, now and in the future, while maintaining their ecological, environmental and hydrological integrity. Sustainability is more a social goal than a scientific concept. It implies an ethic. Public value judgments must be made about which demands and wants should be satisfied today and what changes should be made to ensure a legacy for the future. Different individuals have different points of view, and it is the combined wisdom of everyone's expressed opinions that will shape what society may consider sustainable (Loucks 1997; Gohari et al. 2017; Chen et al. 2018).

Many researchers were planning to develop an aggregate index for the combination of water resource systems performance (Palmer 1965; Brown et al. 1972; Reiquam 1972; Milbrink 1983). Loucks (1997) offers the following method, based on measures of risk and uncertainty:
(9)
where is a summary index, which measures the sustainability of water resources systems, and represent reliability, resiliency and vulnerability respectively. In this study were calculated for each water year (hydrological year). The data used were monthly (monthly available data from the river in cubic metres), and in each month (simulated period) the volume of total available surface water was compared with the total water demand. Reliability indicates a successful period probability, resiliency is the probability that a successful period follows a failure period, and vulnerability demonstrates how significant the likely consequences of failure may be. If the available water meets the water demand it is a successful period otherwise it is a failure period. According to Loucks (1997) definition, reliability, resiliency, and vulnerability can be expressed as follows:
(10)
(11)

Model construction

Generally, one or more stochastic parameters exist in the structure of risk-based models. The stochastic parameter which is used in this study is . This parameter is the total available water from the river. The rest of the parameters are deterministic. The decision variables used in the model are decision vector X. To solve the multi-objective compromise, the weight of the objective functions should be calculated. In this study, the sustainability index (SI) is used to calculate the weights. The frequently used model variables are listed in Table 1. Thus, the objective functions are formulated as follows:
(13)
(14)
(15)

In Equation (15), the sustainability index (SI) is the weight of the Gini coefficient and (1-SI) is the weight of CVaR. As the SI increases, the weight of the Gini function increases and the weight of the CVaR function decreases. In other words, with an increasing SI, the system stability increases. In a more stable system, due to the high efficiency level, it is better to pay more attention to the equality criterion. Conversely, with the system stability decreasing to reach the optimum point, more attention should be paid to the CVaR criterion. To formulate the model structure, the constraints should be considered as follows:

Total allocated water constraint

The total water allocated to agricultural, domestic and industrial sectors, and ecological water demand (EWD) should be less than or equal to the expected value of available water:
(16)
where is the expected value of the stochastic parameter Q.

Maximum and minimum water allocated constraint

The allocated water should be between the maximum and minimum water demand:
(17)

Non-negative constraints

Allocated water should be greater than or equal to zero:
(18)

Finally the model is formulated as follows:

Minimize:
(19)
Subjected to:
(20)
This model was designed only for surface water allocation and changes in constraints would be made if other water resources (including groundwater) are considered. It was also assumed that existing water facilities (such as water transmission lines) would have sufficient capacity. Otherwise, constraints such as technical constraints were added to the model.

Data generation

Due to the limitation of available data and the need to accurately estimate risk factors, the Monte Carlo sampling method was used to generate annual runoff data. This method is based on generating random numbers from statistical distributions (Kalos & Whitlock 2009; Sobol 2018). First, by fitting different statistical distributions to the available data, the distribution which best fits the historical data was found. The analysis showed that the distribution of annual runoff in the study area is the inverse Gaussian distribution. In probability theory, the inverse Gaussian distribution (also known as the Wald distribution) is a two-parameter family of continuous probability distributions with support on (0, ∞). Its probability density function is given by:
(21)
where μ > 0 is the mean and λ > 0 is the shape parameter (Seshadri 2012). Using the least squares method, the parameters μ and λ were obtained as 1.0372E + 8 and 8.5318E + 8, respectively. Annual flow data values were obtained by generating 10,000 random numbers from the above distribution (see Figure A in the Supplementary Material). Then the annual data were disaggregated to monthly data using the Valencia & Schaake (1973) method. This method uses the following linear relationship to generate monthly data:
(22)
where Y is a vector of correlated random variables (monthly data) and X is annual data, A is a (12 × 1) coefficient vector, V is a (12 × 1) vector of independently distributed standard normal deviates and B is a (12 × 12) coefficient matrix (Valencia & Schaake 1973; Kossieris et al. 2018). The parameters of this model can be estimated as follows:
(23)
(24)
where S is a covariance matrix and B is a lower triangular matrix obtained by the principal component analysis. The values of A and B coefficients are presented in Boxes (a) and (b) in the Supplementary Material. To calculate the SI, first the reliability, resilience, and vulnerability (RRV) values were calculated using Equations (10)–(12). Figure 4 shows a Box-Whisker diagram of RRV. The SI value was obtained using Equation (9). Table 2 shows RRV detailed results and the calculated SI.
Table 1

Description of the model variables

VariableDescription
i Index of sector (domestic, agricultural and industrial sectors) 
j Index of sub-basin 
D Index of the domestic sector 
A Index of the agricultural sector 
I Index of the industrial sector 
 The amount of water allocated to sector i in sub-basin j 
 The Gini coefficient in domestic, agricultural and industrial sectors 
 Population in sub-basin j 
 Area under cultivation in sub-basin j 
 Average economic return per unit volume of allocated water of sector i in sub-basin j 
CVaR Conditional Value-at-Risk 
SI Sustainability index 
Rel Reliability 
Res Resiliency 
Vul Vulnerability 
EWD The ecological water demand 
 The stochastic parameter that represents the total available water from the river 
 The minimum water demand for sector i in sub-basin j 
 The maximum water demand for sector i in sub-basin j 
VariableDescription
i Index of sector (domestic, agricultural and industrial sectors) 
j Index of sub-basin 
D Index of the domestic sector 
A Index of the agricultural sector 
I Index of the industrial sector 
 The amount of water allocated to sector i in sub-basin j 
 The Gini coefficient in domestic, agricultural and industrial sectors 
 Population in sub-basin j 
 Area under cultivation in sub-basin j 
 Average economic return per unit volume of allocated water of sector i in sub-basin j 
CVaR Conditional Value-at-Risk 
SI Sustainability index 
Rel Reliability 
Res Resiliency 
Vul Vulnerability 
EWD The ecological water demand 
 The stochastic parameter that represents the total available water from the river 
 The minimum water demand for sector i in sub-basin j 
 The maximum water demand for sector i in sub-basin j 
Table 2

The results of RRV and SI calculations

Variable nameMeanMaxMin
Reliability 0.5307 0.6667 0.2500 
Resiliency 0.2831 1.0000 0.1111 
Vulnerability 0.1083 0.1189 0.0818 
SI = (Reliability)(Resiliency)(1 − vulnerability) = 0.1300 
Variable nameMeanMaxMin
Reliability 0.5307 0.6667 0.2500 
Resiliency 0.2831 1.0000 0.1111 
Vulnerability 0.1083 0.1189 0.0818 
SI = (Reliability)(Resiliency)(1 − vulnerability) = 0.1300 
Figure 4

Reliability, resilience and vulnerability box-whisker diagram.

Figure 4

Reliability, resilience and vulnerability box-whisker diagram.

Close modal

According to Stroud & Secrest (1966), the Gaussian Quadrature (N = 4) method was used to obtain the probabilities and values of the stochastic parameter (annual runoff) from the probability distribution function. Table 3 shows the obtained results. In this table the parameter N is the number of probability-value pairs in the discrete approximation. Table 4 shows the parameters used in the developed model.

Table 3

The values and probabilities of annual runoff

NValuesProbabilities
61,266,760.16 0.2787 
106,876,638.53 0.5915 
178,209,919.73 0.1273 
296,336,681.57 0.0025 
NValuesProbabilities
61,266,760.16 0.2787 
106,876,638.53 0.5915 
178,209,919.73 0.1273 
296,336,681.57 0.0025 
Table 4

The parameters used in the developed model

SectorB Givi (dollar/m3)B Sangvar (dollar/m3)Min D Givi (106 m3)Min D Sangvar (106 m3)Max D Givi (106m3)Max D Sangvar (106 m3)
Domestic 0.70 0.65 1.2 1.5 2.3 
Agricultural 2.50 1.70 17 34 
Industrial 9.46 8.49 14 12.8 41 30 
Sub-area s (m2POP (person) EWD (m3 
Givi 1,560 8,520 6,300,000  
Sangvar 20,820 15,080 4,700,000  
Total 22,380 23,600 11,000,000  
SectorB Givi (dollar/m3)B Sangvar (dollar/m3)Min D Givi (106 m3)Min D Sangvar (106 m3)Max D Givi (106m3)Max D Sangvar (106 m3)
Domestic 0.70 0.65 1.2 1.5 2.3 
Agricultural 2.50 1.70 17 34 
Industrial 9.46 8.49 14 12.8 41 30 
Sub-area s (m2POP (person) EWD (m3 
Givi 1,560 8,520 6,300,000  
Sangvar 20,820 15,080 4,700,000  
Total 22,380 23,600 11,000,000  

Since the objective function obtained was a nonlinear function, so the model was a nonlinear model. To solve the model, four scenarios were considered as follows:

  • 1.

    Determining the weight of objective functions in compromise programming with sustainability index (SI scenario).

  • 2.

    Considering the Gini function and eliminating the risk function in the objective functions (EQ scenario).

  • 3.

    Considering equal weight for risk and equality objective functions (EW scenario).

  • 4.

    Considering the CVaR function and eliminating the Gini function in the objective functions (CVaR scenario).

The outputs of the different scenarios are shown in Table 5. In this table represents the allocation matrix, i represents sectors, including domestic (D), agricultural (A), and industrial (I). Also, parameter j represents sub-basins including the Givi (GI) and Sangvar (SA) sub-basins.

Table 5

Allocation matrix in four considered scenarios

XijSI
EQ
EW
CVaR
GISAGISAGISAGISA
D 1.395 2.024 5.744 5.245 1.524 3.279 1.290 2.003 
A 4.129 6.511 4.542 28.752 4.921 6.356 4.900 6.452 
I 14.832 65.324 14.027 34.426 14.003 63.915 66.761 12.848 
XijSI
EQ
EW
CVaR
GISAGISAGISAGISA
D 1.395 2.024 5.744 5.245 1.524 3.279 1.290 2.003 
A 4.129 6.511 4.542 28.752 4.921 6.356 4.900 6.452 
I 14.832 65.324 14.027 34.426 14.003 63.915 66.761 12.848 

According to Figure 5, the CVaR scenario had the maximum economic benefit. As expected, only the risk function was optimized in this scenario. The lowest economic benefit was obtained for the EQ scenario, because the EQ scenario puts too much emphasis on equality.

Figure 5

The total economic benefit comparison.

Figure 5

The total economic benefit comparison.

Close modal
From Figure 6, it can be seen that the minimum and maximum values of the Gini coefficient belong to the EQ and CVaR scenarios, respectively. In the EQ scenario the allocation of resources is based on the equality function. In this case, economic benefit will not be optimal. In the CVaR scenario, the resource allocation is based on the risk function that minimizes the loss. This proves the existence of a trade-off between equality and risk. As a result, a scenario which takes both equality and risk into account should be used. Among these scenarios, the SI scenario will yield the most sustainable, efficient and equitable results because it incorporates all the uncertainties into the model. Based on Figures 5 and 6, it can be shown that the SI scenario has an acceptable result for both economic benefit and equality. Therefore, the SI scenario can be suggested for a decision maker who wants a scenario with maximum economic benefit and equality. Sensitivity analysis is used to evaluate the sensitivity of the model to the SI parameter. Sensitivity analysis was performed using the average percentage change (APC). The APC is calculated as follows:
(25)
where i is the index of the sector, j is the index of the sub-basin, is the model output and is the model output due to the SI parameter variation (the other parameters were kept constant). Table 6 lists the average percentage change (APC) in model output due to the SI parameter variation. The obtained data show that the model was highly sensitive to the SI parameter.
Table 6

The obtained results from sensitivity analysis

Percentage of change in the SI parameter −15 −5 15 
Average percentage change in model output −49.0 −50.1 3.0 −18.9 
Percentage of change in the SI parameter −15 −5 15 
Average percentage change in model output −49.0 −50.1 3.0 −18.9 
Figure 6

Comparison of the Gini coefficient for considered scenarios.

Figure 6

Comparison of the Gini coefficient for considered scenarios.

Close modal

Due to the severe water resource limitation, the need for a comprehensive water resource allocation model is clearly evident. This model should not only consider equality and risk factors but it also has to increase sustainability by taking into account existing uncertainties. By considering two objective functions (equality and risk), a new water resource allocation model was developed in this paper. The developed model revealed that the sustainability index (SI) scenario is one of the best scenarios for achieving sustainability, together with equality and risk objectives. Some conclusions can be drawn from this study. (1) Although considering the Gini coefficient as an objective function increases the equality, however, without considering the CVaR function, it does not yield good efficiency. Minimizing the CVaR will increase the efficiency by minimizing the loss function. (2) To consider sustainability together with risk and equality, it is suggested to use the sustainability index as the weight of objective functions in a compromise programming approach. Using this index not only makes a trade-off between risk and equality but also creates a comprehensive model. In this model, the SI incorporates the inherent characteristics of the water resources system into the model, and it helps decision makers to allocate water more efficiently and equitably. (3) The CVaR function considers only the uncertainty of the water supply, whereas the SI considers the uncertainties caused by water supply and water demand simultaneously. Therefore, considering CVaR with SI will create a more comprehensive model.

The Supplementary Material for this paper is available online at https://dx.doi.org/10.2166/ws.2020.025.

Atiquzzaman
M.
Liong
S. Y.
Yu
X.
2006
Alternative decision making in water distribution network with NSGA-II
.
Journal of Water Resources Planning and Management
132
(
2
),
122
126
.
Babel
M. S.
Gupta
A. D.
Nayak
D. K.
2005
A model for optimal allocation of water to competing demands
.
Water Resources Management
19
(
6
),
693
712
.
Bella
A.
Duckstein
L.
Szidarovszky
F.
1996
A multicriterion analysis of the water allocation conflict in the upper Rio Grande basin
.
Applied Mathematics and Computation
77
(
2–3
),
245
265
.
Brown
R. M.
McClelland
N. I.
Deininger
R. A.
O'Connor
M. F.
1972
A water quality index – crashing the psychological barrier
. In:
Indicators of Environmental Quality
(W. A. Thomas, ed.),
Springer
,
Boston, MA
, pp.
173
182
.
Chankong
V.
Haimes
Y. Y.
1983
Multiobjective Decision Making: Theory and Methodology
.
North Holland/Elsevier Science
,
New York
.
Cohon
J. L.
Marks
D. H.
1973
Multiobjective screening models and water resource investment
.
Water Resources Research
9
(
4
),
826
836
.
Cullis
J.
Van Koppen
B.
2007
Applying the Gini Coefficient to Measure Inequality of Water Use in the Olifants River Water Management Area, South Africa
. Vol.
113
,
International Water Management Institute
,
PO Box 2075, Colombo, Sri Lanka
.
Dixit
V.
Tiwari
M. K.
2020
Project portfolio selection and scheduling optimization based on risk measure: a conditional value at risk approach
.
Annals of Operations Research
,
285
(
1–2
),
9
33
.
DWAF
2005
A Draft Position Paper for Water Allocation Reform in South Africa: Towards A Framework for Water Allocation Planning
.
Department of Water Affairs and Forestry
,
Pretoria, South Africa
.
Fattahi
P.
Fayyaz
S.
2010
A compromise programming model to integrated urban water management
.
Water Resources Management
24
(
6
),
1211
1227
.
Gini
C.
1921
Measurement of inequality of incomes
.
The Economic Journal
31
(
121
),
124
126
.
Ha
M.
Gao
Z.
2017
Optimization of water allocation decisions under uncertainty: the case of option contracts
.
Journal of Ambient Intelligence and Humanized Computing
8
(
5
),
809
818
.
Hashimoto
T.
Stedinger
J. R.
Loucks
D. P.
1982
Reliability, resiliency, and vulnerability criteria for water resource system performance evaluation
.
Water Resources Research
18
(
1
),
14
20
.
Hipel
K. W.
1992
Multiple objective decision making in water resources 1
.
JAWRA Journal of the American Water Resources Association
28
(
1
),
3
12
.
Hu
Z.
Chen
Y.
Yao
L.
Wei
C.
Li
C.
2016a
Optimal allocation of regional water resources: from a perspective of equity–efficiency tradeoff
.
Resources, Conservation and Recycling
109
,
102
113
.
Hu
Z.
Wei
C.
Yao
L.
Li
C.
Zeng
Z.
2016c
Integrating equality and stability to resolve water allocation issues with a multiobjective bilevel programming model
.
Journal of Water Resources Planning and Management
142
(
7
),
04016013
.
Kalos
M. H.
Whitlock
P. A.
2009
Monte Carlo Methods
.
John Wiley & Sons
,
Weinheim, Germany
.
Lee
S. B.
Lee
S. M.
Lee
K. Y.
2019
A Gini coefficient based evaluation on the reliability of travel time forecasting
.
Journal of King Saud University-Engineering Sciences
31
(
4
),
314
319
.
Liu
B.
Wang
H.
Lei
X.
Liu
Z.
Quan
J.
2018
Emergency operation rules for water-supply reservoirs under uncertainty and risk in dry seasons
.
Water Science and Technology: Water Supply
18
(
5
),
1682
1695
.
Lorenz
M. O.
1905
Methods of measuring the concentration of wealth
.
Publications of the American Statistical Association
9
(
70
),
209
219
.
Loucks
D. P.
1997
Quantifying trends in system sustainability
.
Hydrological Sciences Journal
42
(
4
),
513
530
.
Palmer
W. C.
1965
Meteorological drought, Research paper no. 45. US Weather Bureau, Washington, DC, 58
.
Raju
K. S.
Duckstein
L.
Arondel
C.
2000
Multicriterion analysis for sustainable water resources planning: a case study in Spain
.
Water Resources Management
14
(
6
),
435
456
.
Read
L.
Madani
K.
Inanloo
B.
2014
Optimality versus stability in water resource allocation
.
Journal of Environmental Management
133
,
343
354
.
Reiquam
H.
1972
Establishing priorities among environmental stresses
. In:
Indicators of Environmental Quality
(W. A. Thomas, ed.),
Springer
,
Boston, MA
, pp.
71
82
.
Rockafellar
R. T.
Uryasev
S.
2002
Conditional value-at-risk for general loss distributions
.
Journal of Banking & Finance
26
(
7
),
1443
1471
.
Salman
S. A.
Shahid
S.
Ismail
T.
Al-Abadi
A. M.
Wang
X. J.
Chung
E. S.
2019
Selection of gridded precipitation data for Iraq using compromise programming
.
Measurement
132
,
87
98
.
Sandoval-Solis
S.
McKinney
D. C.
Loucks
D. P.
2010
Sustainability index for water resources planning and management
.
Journal of Water Resources Planning and Management
137
(
5
),
381
390
.
Seshadri
V.
2012
The Inverse Gaussian Distribution: Statistical Theory and Applications
, Vol.
137
.
Springer Science & Business Media
,
New York
.
Shiau
J. T.
Wu
F. C.
2006
Compromise programming methodology for determining instream flow under multiobjective water allocation criteria 1
.
JAWRA Journal of the American Water Resources Association
42
(
5
),
1179
1191
.
Simonovic
S. P.
2009
Managing Water Resources: Methods and Tools for A Systems Approach
.
United Nations Educational, Scientific and Cultural Organization (UNESCO) Publishing
,
Paris
.
Sobol
I. M.
2018
A Primer for the Monte Carlo Method
.
CRC press
,
Boca Raton, FL, USA
.
Stroud
A. H.
Secrest
D.
1966
Gaussian Quadrature Formulas
.
Prentice Hall
,
Englewood Cliffs, NJ, USA
.
Valencia
D.
Schaake
J. C.
1973
Disaggregation processes in stochastic hydrology
.
Water Resources Research
9
(
3
),
580
585
.
Wang
X. J.
Zhang
J. Y.
Shahid
S.
ElMahdi
A.
He
R. M.
Wang
X. G.
Ali
M.
2012
Gini coefficient to assess equity in domestic water supply in the Yellow River
.
Mitigation and Adaptation Strategies for Global Change
17
(
1
),
65
75
.
WCED, S. W. S.
1987
World commission on environment and development
.
Our Common Future
17
,
1
91
.
Xevi
E.
Khan
S.
2005
A multi-objective optimization approach to water management
.
Journal of Environmental Management
77
(
4
),
269
277
.
Yamout
G. M.
2005
Application of Single Party and Multiple Party Decision Making Under Risk and Uncertainty to Water Resources Allocation Problems
.
PhD thesis, Department of Civil Engineering, University of Florida
,
Gainesville, FL, USA
.
Zarghaami
M.
2006
Integrated water resources management in Polrud irrigation system
.
Water Resources Management
20
(
2
),
215
225
.
Zeleny
M.
1973
Compromise programming, multiple criteria decision-making
. In:
Multiple Criteria Decision Making
(J. L. Cochrane & M. Zeleny, eds).
University of South Carolina Press
,
Columbia
, pp.
263
301
.
Zeying
G. U. I.
Zhang
C.
Li
M.
Ping
G. U. O.
2015
Risk analysis methods of the water resources system under uncertainty
.
Frontiers of Agricultural Science and Engineering
2
(
3
),
205
215
.

Supplementary data