The Hornsby Bend Hyacinth Facility, the first such system built under the U. S. Environmental Protection Agency “Construction Grants Program”, represents the culmination of over a decade of experience at the City of Austin with hyacinth treatment.

The facility consists of three culture basins 265 m in length with an area of 1.6 ha. To permit year-round hyacinth culture, basins are covered with a 2.06 ha unitary greenhouse structure. Fenced exclusion areas at intervals along sides of basins serve as natural aerators and enhance fish production.

The system, operated in an aerobic mode, was designed to daily treat about three million liters of sludge lagoon supernatant. Exclusion of large vertebrate predators and stocking of basins with selected animal species will provide a unique ecosystem. Basins were planted with hyacinth in late October, 1985 and discharge commenced on February 3, 1986. Functional characteristics and ecological considerations of the facility are discussed and operational performance data are presented. Maintenance harvesting of hyacinth and disposition of plant material are described. Application of greenhoused hyacinth treatment systems are addressed.

This content is only available as a PDF.
You do not currently have access to this content.