The sewage treatment plant of Metabief (East of France) has been monitored during three weeks in winter 1988. The treatment associates a physico-chemical treatment with a biological process of biofiltration. The first step eliminates about 60 % of the organic matter (COD and BOD). The biofliters improve the treatment removing 60 % of COD influent and 65 % of TSS. The process is efficient (N excepted) under conditions of the experiment but nitrification is limited by cold temperatures (< 10°C).

Important results related to biological sludge product are presented (sludge characteristic, microscopic data, sludge production). Power consumption of biofliters represents 70 % of the total plant needs. Adequate control of washing cycles and close survey of numerous movable devices are of the utmost importance to guarantee the proper operating of biofliters.

This content is only available as a PDF.
You do not currently have access to this content.