The long- and short-term effects of hydraulic loading were investigated in a pilot packed tower bioreactor used for denitrifying a groundwater used for drinking water. Field experiments were conducted at hydraulic loading rates of 3.63 and 7.24 m3/hr/m2. The long-term (21 day average) performance of the denitrification reactor and the short-term response (48 hour) to regular air scour are reported here. In summary, an increase in hydraulic loading resulted in a long-term increase in the half-order denitrification rate constant, so that, on average, nitrate removal was maintained in the 5.2 m tower. At the lower hydraulic loading rate (3.63 m3/hr/m2) denitrification performance in the first 48 hours after air scour was maintained; however at twice the hydraulic loading, several days were required to restore the biofilm performance to long-term average levels.
Skip Nav Destination
Article navigation
Research Article|
August 01 1992
Short and Long-Term Responses to Changes in Hydraulic Loading in a Fixed Denitrifying Biofilm
Water Sci Technol (1992) 26 (3-4): 535–544.
Citation
M. M. de Mendonca, J. Silverstein, N. E. Cook; Short and Long-Term Responses to Changes in Hydraulic Loading in a Fixed Denitrifying Biofilm. Water Sci Technol 1 August 1992; 26 (3-4): 535–544. doi: https://doi.org/10.2166/wst.1992.0433
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00