A pilot study was conducted to establish feasibility of biological nutrient removal at one of the most advanced wastewater treatments in the U.S. The results of the study revealed technical feasibility of biological phosphorus removal at extremely high F/M (0.84 1/day) and a short hydraulic detention time (2.2 hours) in the first stage activated sludge system. Due to phosphorus limitation of 0.18 mg/l, it was determined that none of the single sludge BNR processes was applicable at this facility. In the second stage, therefore, biological nitrogen removal was achieved with both methanol and primary effluent as a carbon source. Another significant finding was that after acclimation, the primary effluent exhibited the same rate of denitrification as with methanol (2.7 mg NO3− N/gVSS·hr). Further pilot testing revealed correlations among such process variables as detention time, BOD to nitrogen ratio, and effluent nitrogen concentration.
Skip Nav Destination
Article navigation
Research Article|
November 01 1992
Biological Nutrient Removal at the Blue Plains Wastewater Treatment Plant in Washington, D.C.
S. J. Kang;
S. J. Kang
*McNamee, Porter and Seeley, Ann Arbor, MI 48108, USA
Search for other works by this author on:
W. F. Bailey;
W. F. Bailey
**Water and Sewer Utility Administration, Washington, D.C. 20009, USA
Search for other works by this author on:
D. Jenkins
D. Jenkins
***University of California, Berkeley, CA 94720, USA
Search for other works by this author on:
Water Sci Technol (1992) 26 (9-11): 2233–2236.
Citation
S. J. Kang, W. F. Bailey, D. Jenkins; Biological Nutrient Removal at the Blue Plains Wastewater Treatment Plant in Washington, D.C.. Water Sci Technol 1 November 1992; 26 (9-11): 2233–2236. doi: https://doi.org/10.2166/wst.1992.0704
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
eBook
Pay-Per-View Access
$38.00