Stricter waste quality standards necessitated the upgrading of a large wastewater treatment plant. Taken with constraints on cost and physical space this led to the investigation of a wide range of conventional and unconventional plant configurations that integrate the existing trickling filters to achieve the nutrient removal target.

This content is only available as a PDF.
You do not currently have access to this content.