The most important German administrative regulations for the disposal of hazardous waste are described. In addition, some constructions at the landfill at Raindorf are introduced which have been installed to meet the demands of these regulations. Resulting from these experiences, several recommendations for the design and the construction of a modern, hazardous waste landfill are given.

This content is only available as a PDF.
You do not currently have access to this content.