Steam stripping and nitrification/denitrification for the elimination of nitrogen from sludge treatment reject water from the Central Sludge Treatment Facilities (CSTF) of the Emschergenossenschaft in Bottrop were tested in half-scale pilot plants. More than 90% efficiency could be achieved with both systems; the nitrification/denitrification process also removed organic nitrogen. Operational experience has shown that full scale application of both systems is possible. The design surface load of the stripping column has been evaluated as 10 m3/(m2*h) and the steam/water ratio as 0.12 t/m3. The nitrification/denitrification process can be designed for 0.07 kgN/(kg MLSS*d) and 1.4 days hydraulic retention time. Total treatment costs are estimated to be between 5 and 7.5 DM/kg N.
Skip Nav Destination
Article navigation
Research Article|
September 01 1994
Nitrogen elimination from sludge treatment reject water – comparison of the steam-stripping and denitrification processes
Water Sci Technol (1994) 30 (6): 41–51.
Citation
Burkhard Teichgräber, Andreas Stein; Nitrogen elimination from sludge treatment reject water – comparison of the steam-stripping and denitrification processes. Water Sci Technol 1 September 1994; 30 (6): 41–51. doi: https://doi.org/10.2166/wst.1994.0251
Download citation file:
Sign in
Don't already have an account? Register
Client Account
You could not be signed in. Please check your email address / username and password and try again.
Could not validate captcha. Please try again.
Impact Factor 2.430
CiteScore 3.4 • Q2
13 days submission to first
decision
1,439,880 downloads in 2021